| Item |
Last Updated |
Comments Due |
Target Implementation |
Stakeholder Engagement |
| |
|
Ontario Reliability Compliance Program -Requirements Form - NERC Reliability Standard: IRO-005-3a and IRO-005-3.1a - Reliability Coordination - Current Day Operations, IESO_FORM_1749_v1.3
|
13-May-2013
|
24-May-2013
|
In advance of BL29.1
|
|
|
A change was made to the footnote for reporting period. Updated to correct requirements that did not apply to market participants. This form was developed to facilitate compliance monitoring of NERC standard IRO-005-3a and IRO-005-3.1a - Reliability Coordination - Current Day Operations, which was included on NERC's Compliance Monitoring and Enforcement Program (CMEP) list of actively monitored standards.
|
| |
|
Ontario Reliability Compliance Program - Requirements Form - NERC Reliability Standard: EOP-001-0b and EOP-001-0.1b - Emergency Operations Planning, IESO_FORM_1750_v1.2
|
13-May-2013
|
24-May-2013
|
In advance of BL29.1
|
|
|
A change was made to the footnote for reporting period.This form was developed to facilitate compliance monitoring of NERC standard EOP-001-0b and EOP-001-0.1b Emergency Operations Planning, which was included on NERC's Compliance Monitoring and Enforcement Program (CMEP) list of actively monitored standards.
|
| |
|
Application for Authorization to Participate,
IMO_FORM_1016_v18.1
|
8-May-2013
|
22-May-2013
|
Baseline 29.1
|
|
|
This form was revised for Changes to Payment Card Industry standards, and change to IESO address for courier packages. A blackline (draft) version is available for immediate use until form is finalized: Application for Authorization to Participate.
|
| |
|
Market Manual 7: System Operations, Part 7.8: Ontario Power System Restoration Plan, IMO_PLAN_0001_v6.1
|
6-May-2013
|
17-May-2013
|
Baseline 29.1
|
|
|
Updates to this plan describe how we comply with NERC EOP-005-2, R1.2.
|
| |
|
Ontario Reliability Compliance Program - Requirements Form - NERC Reliability Standard: EOP-005-1 - System Restoration Plans,
IESO_FORM_1752_v1.1
|
30-Apr-2013
|
13-May-2013
|
In advance of BL29.1
|
|
|
This form was developed to facilitate compliance monitoring of NERC standard EOP-005-1 - System Restoration Plans, which was included on NERC's Compliance Monitoring and Enforcement Program (CMEP) list of actively monitored standards.
|
| |
|
Ontario Reliability Compliance Program - Requirements Form - NERC Reliability Standard: EOP-008-0 - Plans for Loss of Control Center Functionality, IESO_FORM_1753_v1.1
|
30-Apr-2013
|
13-May-2013
|
In advance of BL29.1
|
|
|
This form was developed to facilitate compliance monitoring of NERC standard EOP-008-0 - Plans for Loss of Control Center Functionality, which was included on NERC's Compliance Monitoring and Enforcement Program (CMEP) list of actively monitored standards.
|
| |
|
Market Manual 11: Reliability Compliance Part 11.4: Ontario Bulk Electric System (BES) Exception, IESO_PRO_0875_v1.1
|
23-Apr-2013
|
13-May-2013
|
Baseline 29.1
|
|
|
This manual was updated for the inclusion of Section 9: Guide to IESO Portal Collaboration and Inclusion of Appendix B: Assessment Criteria.
|
| |
|
MM7: System Operations; Part 7.3: Outage Management, IMP_PRO_0035_v25.2
|
23-Apr-2013
|
6-May-2013
|
Baseline 29.1
|
|
|
Updated for additional clarity. Procedure was revised to provide clarity to the expectations of variable generators during commissioning.
|
| |
|
MM7.2: Near-Term Assessments and Reports,
IMP_PRO_0033_v28.1
|
19-Apr-2013
|
3-May-2013
|
Baseline 29.1
|
|
|
Procedure was updated to remove a bullet item from section 1.2.4 related to the NPCC Regional Reserve Sharing program, as this program has been discontinued.
|
| |
|
MM3: Metering, Part 3.2: Meter Point Registration and Maintenance, MDP_PRO_0013_v24.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
Procedure updates include removing references to obsolete metering form IMO_FORM_1482 "Meter Change Form", non-compliant metering and main/check meters.
|
| |
|
MM4: Market Operations; Part 4.2: Submission of Dispatch Data in the Real-Time Energy and Operating Reserve Markets, MDP_PRO_0027_v44.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
Changes made to this procedure include an expanded list for point of receipt (POR) and point of delivery (POD) requirements for all interfaces connected to Ontario. This information will provide proper interchange visibility.
|
| |
|
MM5: Settlements; Part 5.6: Physical Markets Settlement Invoicing, MDP_PRO_0035_v11.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
This procedure is being updated for word editing, removal of HTML and Textfile invoice formats and to replace old system names with their new system names.
|
| |
|
MM5: Settlements; Part 5.8: Financial Markets Settlement Invoicing, MDP_PRO_0047_v11.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
Revisons made to this procedure include word editing, removal of HTML and Textfile invoice formats and to replace old system names with their new system names.
|
| |
|
Wind Generation Facility Data, IESO_FORM_1736_v4.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
Form was revised to include new line in order to gather Local Distribution Company (LDC) information for embedded facilities.
|
| |
|
Solar Generation Facility Data, IESO_FORM_1737_v4.1
|
10-Apr-2013
|
26-Apr-2013
|
Baseline 29.1
|
|
|
Form was revised to include new line in order to gather Local Distribution Company (LDC) information for embedded facilities.
|
| |
|
Market Rules to Manuals Cross Reference Guide, GDE-23_v0.1
|
21-Mar-2013
|
8-Apr-2013
|
In advance of BL29.1
|
|
|
This guide was developed as an aid for stakeholders that will cross reference the markets rules and market manuals detailing the specific market manual within any market rule that refers to an "applicable market manual."
|
| |
|
Asset Transfer Agreement, TPL-3_v1.2
|
8-Mar-2013
|
21-Mar-2013
|
In advance of BL29.1
|
|
|
Ver 1.2 was created to better reflect the actual intent of the transfer agreement, i.e. it applies not only to generation assets but to any projects underway with IESO's Connection Assessments group. Created an agreement similar to existing Connection Assessments agreements.
|
| |
|
MM11.1 Applicability Criteria for Compliance with NERC Standards and NPCC Criteria, IESO_GDE_0364_v1.1
|
27-Feb-2013
|
12-Mar-2013
|
In advance of BL30.0
|
|
|
This manual will be deferred to next baseline in order to reflect effective date of revised BES definition. Guide was revised for clarification, for applicability of NERC's Transmission Relay Loadability (PRC-023-2) Standard.
|
| |
|
Participant Technical Reference Manual, IMO_MAN_0024_v28.1
|
16-Jan-2013
|
1-Feb-2013
|
Baseline 30.0
|
|
|
This manual has been deferred to a future baseline for further revisions. The PTRM was updated to include a new certified Remote Terminal Unit (RTU) vendor.
|
| |
|
Performance Validation, IESO_REQ_0208_v0.3
|
3-Jul-2012
|
3-Aug-2012
|
Deferred to Baseline 30.0
|
|
|
This manual was updated to address concerns and comments raised by a Transmitter. A blacklined (draft v0.3) is available without the formating changes.
Performance Validation
Updated to address issues raised by a Transmitter. Manual is pending consultations with a Transmitter. This new manual will facilitate the objects of Green Energy Act and provide detailed information regarding performance requirements and testing to demonstrate that these requirements have been satisfied.
|
| |
|
Application to Register Variable Generation Facility Data, IESO_FORM_1735_v1.2
|
14-May-2012
|
28-May-2012
|
Deferred to Baseline 29.1
|
|
|
Form was revised to include additional information to align with the requirements of RII project. Additional information is required for CDMS from the applicant to register the organization wishing to participate in the centralized forecasting program. A blackline (draft) version is available for immediate use until form is finalized: Application to Register Variable Generation Facility Data.
|
| |
|
Facility Contacts, IMO_FORM_1176_v3.1
|
26-Apr-2012
|
11-May-2012
|
Deferred to Baseline 30.0
|
|
|
Form was updated to include required fields to align with CDMS requirements.
|
| |