| 2012-EX600 |
HYDRO ONE NETWORKS INC. |
Replace T7 & T8 at Allanburg TS |
Allanburg TS |
Like for Like |
|
Active |
|
| 2012-EX599 |
HYDRO ONE NETWORKS INC. |
S2B tower replacement |
S2B circuit |
Transmission Upgrades |
|
Active |
|
| 2012-EX598 |
XSTRATA NICKEL |
Falconbridge Smelter #1 SS new switcher |
Falconbridge Smelter #1 SS |
Modified Connection |
|
Active |
|
| 2012-EX597 |
ONTARIO POWER GENERATION - HYDRO |
Beck #2 Transformer replacements |
Beck @3 GS |
Like for Like |
|
Active |
|
| 2012-EX596 |
ONTARIO POWER GENERATION - HYDRO |
Chats Falls G4 DC Exciter replacement |
Chats Falls GS |
Replacement of Generator Controls |
|
Active |
|
| 2012-EX595 |
KENORA HYDRO ELECTRIC CORP LTD. |
Replace T1 at Kenora MTS |
Kenora MTS |
Like for Like |
|
Active |
|
| 2012-EX594 |
BROOKFIELD RENEWABLE POWER INC. |
Replace excitation system at McPhail G2 |
McPhail G2 |
Replacement of Generator Controls |
|
Active |
|
| 2012-EX592 |
HYDRO ONE NETWORKS INC. |
Reconfigure N22W to new breaker at Buchanan TS |
Buchanan TS |
Modified Connection |
|
Active |
|
| 2012-EX591 |
BRUCE POWER INC. |
Bruce A NGS Upgrades Units 1,2,3,4 |
Bruce A GS |
Replacement of Generator Controls |
|
Active |
|
| 2012-EX590 |
ONTARIO POWER GENERATION - HYDRO |
Lennox Unit #4 IP Turbine Replacement |
Lennox GS |
Generator Upgrades |
2012-Q2
|
Complete |
Final Report
|
| 2012-EX589 |
ONTARIO POWER GENERATION - HYDRO |
T3/T4 replacement |
Barrett Chute GS |
Like for Like |
|
Active |
|
| 2012-EX588 |
ONTARIO POWER GENERATION - PICKERING PROJECTS |
Replace disconnect switches AT1-T1, SS1-K, & SS2-D |
Pickering NGS |
Like for Like |
|
Active |
|
| 2012-EX587 |
ONTARIO POWER GENERATION - HYDRO |
Des Joachims G1, G3, G5 rewind |
Des Joachims GS |
Generator Upgrades |
|
Complete |
Final Report
|
| 2012-EX586 |
CARDINAL POWER OF CANADA L.P. |
Cardinal Power G2 protection replacement |
Cardinal Power G2 |
Protection Modifications |
2012-Q2
|
Complete |
Final Report
|
| 2012-EX585 |
HYDRO ONE NETWORKS INC. |
Bruce SPS modifications |
Bruce x Milton |
Special Protection System |
|
Active |
|
| 2012-EX584 |
TRANSALTA COGENERATION LP. |
PSS replacements at TA Windsor |
TA Windsor |
Replacement of Generator Controls |
|
Complete |
Final Report
|
| 2012-EX583 |
HYDRO ONE NETWORKS INC. |
Add T2 at Petawawa Craig DS |
Petawawa Craig DS |
Modified Connection |
|
Active |
|
| 2012-EX582 |
VALE INCO LTD. |
Replace 230 kV switches on S21N |
S21N |
Like for Like |
2012-Q2
|
Complete |
Final Report
|
| 2012-EX581 |
ONTARIO POWER GENERATION - PICKERING PROJECTS |
Pickering B main generator AVR replacement |
Pickering B |
Replacement of Generator Controls |
|
Complete |
Final Report
|
| 2012-EX580 |
GOLDCORP CANADA |
Replace 1210M1M at Musselwhite SS |
Musselwhite SS |
Like for Like |
2012-Q2
|
Complete |
Final Report
|
| 2011-EX579 |
H2O Power LP |
Add 2nd autotransformer at Iroquois Falls CTS |
Iroquois Falls CTS |
Modified Connection |
2012-Q3
|
Complete |
Final Report
|
| 2011-EX578 |
HYDRO ONE NETWORKS INC. |
Replace Terauley T4 |
Terauley TS |
Like for Like |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX577 |
ONTARIO POWER GENERATION - HYDRO |
Replace DC exciter at Chats Falls G2 |
Chats Falls GS |
Replacement of Generator Controls |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX576 |
HYDRO ONE NETWORKS INC. |
Shunt Reactors @ Marathon TS |
Marathon TS |
Reactive Compensation |
2014-Q4
|
Complete |
Final Report
|
| 2011-EX575 |
HYDRO ONE NETWORKS INC. |
Replace T2 at Lisgar TS |
Lisgar TS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX574 |
ONTARIO POWER GENERATION - HYDRO |
Manitou M3E Line protection replacement |
Manitou Falls GS |
Protection Modifications |
|
Complete |
Final Report
|
| 2011-EX573 |
HYDRO ONE NETWORKS INC. |
2011-2014 SF6 Breaker Replacements |
Various |
Like for Like |
|
Withdrawn |
|
| 2011-EX572 |
ONTARIO POWER GENERATION - HYDRO |
Barrett Chute G4 Excitation component replacements |
Barrett Chute G4 |
Replacement of Generator Controls |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX571 |
HYDRO ONE NETWORKS INC. |
115 kV breaker upgrades at Hawthorne TS |
Hawthorne TS |
Station Work |
|
Withdrawn |
|
| 2011-EX570 |
VALE INCO LTD. |
Replace tie disc switch at Frood Stobie #2 SS |
Frood Stobie #2 SS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX569 |
HYDRO ONE NETWORKS INC. |
T3 Replacement at Manitoulin TS |
Manitoulin TS |
Like for Like |
2012-Q4
|
Complete |
Final Report
|
| 2011-EX568 |
HYDRO ONE NETWORKS INC. |
Replace KL1 at Lakehead TS |
Lakehead TS |
Like for Like |
|
Withdrawn |
|
| 2011-EX567 |
ONTARIO POWER GENERATION - PICKERING PROJECTS |
Replace disconnect switches at Pickering A G4 |
Pickering A |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX566 |
HYDRO ONE NETWORKS INC. |
Upgrade LXL circuits |
Lambton TS and Macksville Jct |
Transmission Upgrades |
2014-Q4
|
Complete |
Final Report
|
| 2011-EX565 |
ONTARIO POWER GENERATION - HYDRO |
Replace Beck 2 SS protections |
Beck 2 SS |
Protection Modifications |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX564 |
ONTARIO POWER GENERATION - HYDRO |
Caribou W3C Line protection replacement |
W3C |
Protection Modifications |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX563 |
HYDRO ONE NETWORKS INC. |
LV upgrades at Bruce HWB TS |
Bruce HWB TS |
Station Work |
2013-Q1
|
Active |
|
| 2011-EX562 |
ONTARIO POWER GENERATION - HYDRO |
Replace DC exciter at Chats Falls G5 |
Chats Falls G5 |
Replacement of Generator Controls |
|
Complete |
Final Report
|
| 2011-EX561 |
ONTARIO POWER GENERATION - HYDRO |
Replace T7 at Beck #1 GS |
Beck #1 GS |
Like for Like |
|
Complete |
Final Report
|
| 2011-EX560 |
HYDRO ONE NETWORKS INC. |
B10/B11/B18H/B20H conductor replacement |
Burlington TS and Beach TS |
Transmission Upgrades |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX559 |
NORTHLAND POWER INC. |
AVR Replacements at Kirkland Lake Power |
Kirkland Lake Power |
Generator Upgrades |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX558 |
POWERSTREAM INC. |
Back-up generation at IBM Data Center in Barrie |
Barrie |
Non-Impactive New Equipment |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX557 |
ONTARIO POWER GENERATION - HYDRO |
Replace T1 at Silver Falls GS |
Silver Falls GS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX556 |
ONTARIO POWER GENERATION - HYDRO |
4 kV bus protection upgrade at Nanticoke GS |
Nanticoke GS |
Protection Modifications |
|
Complete |
Final Report
|
| 2011-EX555 |
ONTARIO POWER GENERATION - HYDRO |
Replace LP turbines at Lennox G3 |
Lennox |
Generator Upgrades |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX554 |
ONTARIO POWER GENERATION - HYDRO |
Local GR scheme at Cameron Falls & Alexander GS |
Various |
Non-Impactive New Equipment |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX553 |
HYDRO ONE NETWORKS INC. |
A3-A4 LV Refurbishment at Strachan TS |
Strachan TS |
Station Work |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX552 |
ONTARIO POWER GENERATION - HYDRO |
Replace DC exciter at Chats Falls G8 |
Chats Falls GS |
Replacement of Generator Controls |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX551 |
GREAT LAKES POWER - TRANSMISSION |
Removal of Third Line Total LR schemes |
Third Line TS |
Protection Modifications |
|
Complete |
Final Report
|
| 2011-EX550 |
ONTARIO POWER GENERATION - PICKERING PROJECTS |
Pickering B main generator relay replacement |
Pickering B GS |
Protection Modifications |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX549 |
HYDRO ONE NETWORKS INC. |
Station Upgrades at Goderich TS |
Goderich TS |
Modified Connection |
2012-Q3
|
Complete |
Final Report
|
| 2011-EX548 |
HYDRO ONE NETWORKS INC. |
Replace transformers at Smooth Rock Falls DS |
Smooth Rock Falls |
Modified Connection |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX547 |
ABIBO CANADA |
Thunder Bay Mill HV equipment replacement |
Thunder Bay Mill |
Like for Like |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX546 |
POWERSTREAM INC. |
Replace disconnect switch at Richmond Hill TS#1 |
Richmond Hill TS#1 |
Like for Like |
2011-Q2
|
Complete |
Final Report
|
| 2011-EX545 |
GREAT LAKES POWER - GENERATION |
Clergue TS Transformer Overload Protection |
Clergue TS |
Protection Modifications |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX544 |
HYDRO ONE NETWORKS INC. |
Replace SC12SC at Dymond TS |
Dymond TS |
Like for Like |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX543 |
HYDRO ONE NETWORKS INC. |
Install 1 ohm series reactor at Birch TS |
Birch TS |
Low Voltage Reactive Compensation |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX542 |
HYDRO ONE NETWORKS INC. |
115 kV breaker upgrade at Allanburg TS |
Allanburg TS |
Like for Like |
2013-Q2
|
Complete |
Final Report
|
| 2011-EX541 |
HYDRO ONE NETWORKS INC. |
Replace Longwood R3N, R6N, R7N and Hawthorne R3N |
Longwood and Hawthorne |
Like for Like |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX540 |
HYDRO ONE NETWORKS INC. |
Install 2 ohm bus tie reactors at various stations |
Various |
Low Voltage Reactive Compensation |
|
Complete |
Final Report
|
| 2011-EX539 |
BROOKFIELD RENEWABLE POWER INC. |
Exciter Replacement at Steephill Falls.GS |
Steephill Falls GS |
Replacement of Generator Controls |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX538 |
HYDRO ONE NETWORKS INC. |
Add new T3 to create a 2nd DESN at Kent TS |
Kent TS |
Modified Connection |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX537 |
HYDRO ONE NETWORKS INC. |
New Shunt reactors on H1L and H3L |
H1L and H3L |
Reactive Compensation |
2013-Q4
|
Complete |
Final Report
|
| 2011-EX536 |
HYDRO ONE NETWORKS INC. |
New 115 kV transformer breakers at Main TS |
Main TS |
New Breakers |
2013-Q4
|
Complete |
Final Report
|
| 2011-EX535 |
CAPITAL POWER |
Replace temp Tunis T1 with permanent unit |
Tunis GS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX534 |
ONTARIO POWER GENERATION - HYDRO |
Barrett Chute G3&G4 generator breaker replacement |
Barrett Chute GS |
New Breakers |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX533 |
ONTARIO POWER GENERATION - HYDRO |
Alexander G4 rewind |
Alexander GS |
Generator Upgrades |
2012-Q1
|
Complete |
Final Report
|
| 2011-EX532 |
HYDRO ONE NETWORKS INC. |
Replace Hanover T4 |
Hanover TS |
Like for Like |
2011-Q3
|
Complete |
Final Report
|
| 2011-EX531 |
HYDRO ONE NETWORKS INC. |
KL35 breaker replacement at Cherrywood North |
Cherrywood North TS |
Like for Like |
|
Complete |
Final Report
|
| 2011-EX530 |
HYDRO ONE NETWORKS INC. |
Hydro One Breaker replacements |
Various |
Like for Like |
|
Complete |
Final Report
|
| 2011-EX529 |
ONTARIO POWER GENERATION - HYDRO |
Beck PGS T31 & T32 transformer replacements |
Beck PGS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX528 |
ONTARIO POWER GENERATION - HYDRO |
Beck 2 Disconnect switch replacement |
Beck 2 GS |
Like for Like |
2013-Q4
|
Complete |
Final Report
|
| 2011-EX527 |
TRANSALTA COGENERATION LP. |
TA Mississauga AVR & controller upgrades |
TA Mississauga (Douglas) |
Replacement of Generator Controls |
2011-Q2
|
Complete |
Final Report
|
| 2011-EX526 |
HYDRO ONE NETWORKS INC. |
Carlaw TS LV Refurbishment |
Carlaw TS |
Low Voltage Feeder Breaker |
|
Complete |
Final Report
|
| 2011-EX525 |
HYDRO ONE NETWORKS INC. |
Wiltshire LV refurbishment |
Wiltshire TS |
Low Voltage Feeder Breaker |
2011-Q4
|
Complete |
Final Report
|
| 2011-EX524 |
ONTARIO POWER GENERATION - HYDRO |
Lambton G4 Exciter Upgrade |
Lambton GS |
Replacement of Generator Controls |
2011-Q1
|
Complete |
Final Report
|
| 2011-EX523 |
HYDRO ONE NETWORKS INC. |
Trafalgar T14 Replacement |
Trafalgar TS |
Like for Like |
2012-Q3
|
Complete |
Final Report
|
| 2011-EX522 |
HYDRO ONE NETWORKS INC. |
Burleigh DS Transformer Replacement |
Burleigh DS |
Like for Like |
|
Withdrawn |
Final Report
|
| 2010-EX521 |
HYDRO ONE NETWORKS INC. |
Reconfigure transformers at Wallaceburg TS |
Wallaceburg TS |
Modified Connection |
2012-Q2
|
Complete |
Final Report
|
| 2010-EX520 |
ONTARIO POWER GENERATION - HYDRO |
Lennox 4 kV bus protection upgrade |
Lennox GS |
Protection Modifications |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX519 |
KITCHENER-WILMOT HYDRO INC. |
Replace T5 at MTS#3 |
Kitchener MTS#3 |
Like for Like |
2011-Q3
|
Complete |
Final Report
|
| 2010-EX518 |
SUNCOR ENERGY INC. |
Protection Changes at Suncor TS |
Sarnia |
Protection Modifications |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX517 |
ONTARIO POWER GENERATION - HYDRO |
R. H. Saunders protection upgrades |
R. H. Saunders GS |
Protection Modifications |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX516 |
HYDRO ONE NETWORKS INC. |
Rebuild 115 kV switchyard at Hearn SS |
Hearn SS |
Station Work |
2013-Q4
|
Complete |
Final Report
|
| 2010-EX515 |
HYDRO ONE NETWORKS INC. |
Replace 500 kV breakers at Hanmer TS |
Hanmer TS |
Like for Like |
2012-Q4
|
Complete |
Final Report
|
| 2010-EX514 |
HYDRO ONE NETWORKS INC. |
New Disconnects on M20D/M21D at Preston TS |
Preston TS |
Non-Impactive New Equipment |
2011-Q4
|
Complete |
Final Report
|
| 2010-EX513 |
HYDRO ONE NETWORKS INC. |
Glengrove TS new T2 & T4 bus arrangement |
Glengrove TS |
Station Work |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX512 |
LAKE HURON PRIMARY WATER SUPPLY SYSTEM |
Back up generation at Lake Huron WTP |
Lake Huron WTP |
Non-Impactive New Equipment |
2012-Q1
|
Complete |
Final Report
|
| 2010-EX511 |
HYDRO ONE NETWORKS INC. |
Increase SC ratings of 3 Bruce A breakers |
Bruce A TS |
Transmission Upgrades |
|
Complete |
Final Report
|
| 2010-EX510 |
ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP |
Kenora GS Control System upgrade |
Kenora GS |
Replacement of Generator Controls |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX509 |
ONTARIO POWER GENERATION - HYDRO |
Lambton G3 Exciter upgrade |
Lambton GS |
Replacement of Generator Controls |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX508 |
HYDRO ONE NETWORKS INC. |
New circuit switchers at Woodstock TS |
Woodstock TS |
Modified Connection |
2011-Q3
|
Complete |
Final Report
|
| 2010-EX507 |
TEMBEC |
Spruce Falls Protection Changes |
Spruce Falls Mill |
Protection Modifications |
|
Stay by Applicant |
|
| 2010-EX506 |
CAPITAL POWER |
Replace Failed Tunis T1 |
Tunis GS |
Like for Like |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX505 |
HYDRO ONE NETWORKS INC. |
Richview T7/T8 Transformer replacement |
Richview TS |
Like for Like |
2011-Q2
|
Complete |
Final Report
|
| 2010-EX504 |
HYDRO ONE NETWORKS INC. |
Replace failed Essa T3 B phase |
Essa TS |
Like for Like |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX503 |
HYDRO ONE NETWORKS INC. |
Replace failed Manby breaker H1L15 |
Manby TS |
Like for Like |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX502 |
HYDRO ONE NETWORKS INC. |
Install capacitor at Midurst TS & Orillia TS |
Midhurst TS & Orillia TS |
Low Voltage Reactive Compensation |
|
Complete |
Final Report
|
| 2010-EX501 |
ABITIBI-CONSOLIDATED COMPANY OF CANADA |
Modifications to Iroquois Falls LR/GR scheme |
Iroquois Falls GS |
Special Protection System |
2011-Q2
|
Complete |
Final Report
|
| 2010-EX500 |
HYDRO ONE NETWORKS INC. |
Reconfiguration of Orangeville TS |
Orangeville TS |
Station Work |
|
Complete |
Final Report
|
| 2010-EX499 |
HYDRO ONE NETWORKS INC. |
Transfer Load to Horner TS |
Horner TS |
Low Voltage Feeder Breaker |
|
Complete |
Final Report
|
| 2010-EX498 |
ONTARIO POWER GENERATION - HYDRO |
Replace T20 at Chats Falls GS |
Chats Falls GS |
Like for Like |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX497 |
ONTARIO POWER GENERATION - HYDRO |
R21D A Protection Upgrade at Abitibi Canyon GS |
Abitibi Canyon GS |
Protection Modifications |
|
Complete |
Final Report
|
| 2010-EX496 |
XSTRATA NICKEL |
Replace disconnect switch at Falconbridge smelter |
Falconbridge smelter |
Like for Like |
2010-Q2
|
Complete |
Final Report
|
| 2010-EX495 |
KIEWIT ALARIE PARTNERSHIP |
Temproray Construction Power at Smoky Falls GS |
Smoky Falls SS |
Temporary Connections |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX494 |
HYDRO ONE NETWORKS INC. |
Install 2 ohm bus tie reactor at Walker #1 TS |
Walker #1 TS |
Low Voltage Reactive Compensation |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX493 |
HYDRO ONE NETWORKS INC. |
Spence Wind Farm SS |
near Chatham, ON |
Modified Connection |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX492 |
HYDRO ONE NETWORKS INC. |
Replace Reactors at Pinard, Hamner and Kenora |
Various |
Low Voltage Reactive Compensation |
2011-Q1
|
Complete |
Final Report
|
| 2010-EX491 |
HYDRO ONE NETWORKS INC. |
Replace failed Beck R76 with larger unit |
Niagara Falls |
Reactive Compensation |
|
Complete |
Final Report
|
| 2010-EX490 |
HYDRO ONE NETWORKS INC. |
Uprate A6P |
between Reserve Jct and Port Arthur TS |
Transmission Upgrades |
2012-Q3
|
Complete |
Final Report
|
| 2010-EX489 |
HYDRO ONE NETWORKS INC. |
Remove PSVR harware assoc w BSPS |
Bruce B SS |
Protection Modifications |
2010-Q2
|
Complete |
Final Report
|
| 2010-EX488 |
LAKE HURON PRIMARY WATER SUPPLY SYSTEM |
New circuit switcher |
Lake Huron Water Treatment Plant |
Like for Like |
2011-Q2
|
Complete |
Final Report
|
| 2010-EX487 |
VALE INCO LTD. |
New HV equipment at Copper Cliff SS |
Copper Cliff CTS |
Like for Like |
2012-Q3
|
Complete |
Final Report
|
| 2010-EX486 |
HYDRO ONE NETWORKS INC. |
Protection Changes on B3N |
Between Bunce Creek TS & Scott TS |
Protection Modifications |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX485 |
HYDRO ONE NETWORKS INC. |
North Shore DS Refurbishment |
North Shore DS |
Station Work |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX484 |
HYDRO ONE NETWORKS INC. |
Manotick DS Refurbishment |
Manotick DS |
Station Work |
2011-Q2
|
Complete |
Final Report
|
| 2010-EX483 |
HYDRO ONE NETWORKS INC. |
Sioux Narrows DS Refurbishment |
Sioux Narrows, ON |
Station Work |
2011-Q2
|
Complete |
Final Report
|
| 2010-EX482 |
ONTARIO POWER GENERATION - HYDRO |
Alexander G5 Upgrade |
Alexander GS |
Generator Upgrades |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX481 |
ONTARIO POWER GENERATION - HYDRO |
Mountain Chute G1 rewind |
Mountain Chute GS |
Generator Upgrades |
|
Complete |
Final Report
|
| 2010-EX480 |
HYDRO ONE NETWORKS INC. |
Manby TS – Uprate SC Capability |
Manby TS |
Station Work |
2013-Q2
|
Complete |
Final Report
|
| 2010-EX479 |
HYDRO ONE NETWORKS INC. |
Leaside TS – Uprate SC Capability |
Leaside TS |
Station Work |
2012-Q4
|
Complete |
Final Report
|
| 2010-EX478 |
BROOKFIELD POWER |
Shekak G1 rewind |
near Hurst, ON |
Like for Like |
2010-Q2
|
Complete |
Final Report
|
| 2010-EX477 |
TRANSALTA CORPORATION |
Replace exciter on TG-821 |
Sarnia |
Replacement of Generator Controls |
2011-Q4
|
Complete |
Final Report
|
| 2010-EX476 |
HYDRO ONE NETWORKS INC. |
Wawa R2 Reactor Replacement |
Wawa TS |
Like for Like |
|
Complete |
Final Report
|
| 2010-EX475 |
ONTARIO POWER GENERATION - HYDRO |
Stewartville G4 exciter replacement |
Stewartville GS |
Like for Like |
|
Complete |
Final Report
|
| 2010-EX474 |
HYDRO ONE NETWORKS INC. |
Remove T2L1 at Crystal Falls SS |
Crystal Falls SS |
Station Work |
|
Complete |
Final Report
|
| 2010-EX473 |
HYDRO ONE NETWORKS INC. |
Uprating of F11C/F12C |
Guelph Cedar TS to Freeport SS |
Transmission Upgrades |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX472 |
HYDRO ONE NETWORKS INC. |
New disconnect switch (K38S) at Kapuskasing TS |
Kapuskasing TS |
Modified Connection |
|
Withdrawn |
|
| 2010-EX471 |
ONTARIO POWER GENERATION - HYDRO |
Cameron Falls G7 Exciter Replacement |
Cameron Falls GS |
Replacement of Generator Controls |
2010-Q2
|
Complete |
Final Report
|
| 2010-EX470 |
HYDRO ONE NETWORKS INC. |
Hawthorne TS Capacitor Switching Scheme |
Hawthorne TS |
Protection Modifications |
|
Complete |
Final Report
|
| 2010-EX469 |
WATERLOO NORTH HYDRO INC. |
Upgrade HV equipment at Eby Rush TS |
Eby Rush TS |
Non-Impactive New Equipment |
2010-Q4
|
Complete |
Final Report
|
| 2010-EX468 |
ONTARIO POWER GENERATION - HYDRO |
Replacement T3 at Abitibi Canyon GS |
Abitibi Canyon GS |
Like for Like |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX467 |
BROOKFIELD RENEWABLE POWER INC. |
Clergue T3 Transformer Replacement |
Clergue GS |
Like for Like |
2010-Q3
|
Complete |
Final Report
|
| 2010-EX466 |
ONTARIO POWER GENERATION - HYDRO |
Mountain Chute G2 rewind and exciter replacement |
Mountain Chute GS |
Replacement of Generator Controls |
2010-Q4
|
Complete |
Report
|
| 2010-EX465 |
HYDRO ONE NETWORKS INC. |
Disconnect Switch Replacements and Refurbishments |
Various |
Like for Like |
2012-Q4
|
Complete |
Final Report
|
| 2010-EX464 |
HYDRO ONE NETWORKS INC. |
Lennox TS Manual DC transfer scheme |
Lennox TS |
Protection Modifications |
|
Unspecified |
|
| 2010-EX463 |
HYDRO ONE NETWORKS INC. |
Replace SC21 and SC22 breakers |
Richview TS |
Like for Like |
|
Withdrawn |
|
| 2009-EX462 |
HYDRO ONE NETWORKS INC. |
115 kV Line ground disconnect switch at Stayner TS |
Stayner TS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2009-EX461 |
HYDRO ONE NETWORKS INC. |
2010 SF6 Breaker Replacements |
Various |
Like for Like |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX460 |
HYDRO ONE NETWORKS INC. |
125 MVA Transformer replacements |
Various |
Like for Like |
2012-Q4
|
Complete |
Final Report
|
| 2009-EX459 |
HYDRO ONE NETWORKS INC. |
SVC conn equipment at Porcupine & Kirkland Lake |
Porcupine TS & Kirkland Lake TS |
Non-Impactive New Equipment |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX458 |
HYDRO ONE NETWORKS INC. |
Add Surge Capacitors, Breakers & Interruptors |
Various |
Non-Impactive New Equipment |
2010-Q2
|
Complete |
Final Report
|
| 2009-EX457 |
HYDRO ONE NETWORKS INC. |
Replacement of H2JK and K6J cables |
Strachan TS x Riverside Jct |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2009-EX456 |
HYDRO ONE NETWORKS INC. |
Lennox X21 X22 LEO |
X21, X22 |
Protection Modifications |
2008-Q4
|
Complete |
Final Report
|
| 2009-EX455 |
BARRICK GOLD CORP - WILLIAMS MINE |
New disconnect switch at David Bell mine |
Off M2W |
Like for Like |
2009-Q4
|
Complete |
Final Report
|
| 2009-EX454 |
HYDRO ONE NETWORKS INC. |
A1B protection upgrades |
115 kV Circuit A1B |
Protection Modifications |
2009-Q4
|
Complete |
Final Report
|
| 2009-EX453 |
HYDRO ONE NETWORKS INC. |
2010 Breaker Replacements |
Various |
Like for Like |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX452 |
HYDRO ONE NETWORKS INC. |
Leaside T19, T20 & T21 Replacements |
Leaside TS |
Like for Like |
2011-Q4
|
Complete |
Final Report
|
| 2009-EX451 |
HYDRO ONE NETWORKS INC. |
2010 Replacement Capacitor Banks |
Various |
Like for Like |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX450 |
BROOKFIELD RENEWABLE POWER INC. |
Hollingsworth G1 Stator Rewind |
Hollingsworth GS |
New Generation |
2009-Q4
|
Complete |
Final Report
|
| 2009-EX449 |
TRANSALTA GENERATION PARTNERSHIP |
Upgrades at Transalta Mississauga |
Mississauga |
New Generation |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX448 |
HYDRO ONE NETWORKS INC. |
Kenora Power/Angle Relay deregistration |
Kenora TS |
Retirement of Facilities |
2010-Q2
|
Complete |
Final Report
|
| 2009-EX447 |
HYDRO ONE NETWORKS INC. |
Install Current Limiting Reactors at Jarvis TS |
Jarvis TS |
Non-Impactive New Equipment |
2010-Q3
|
Complete |
Final Report
|
| 2009-EX446 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS Tertiary Series Reactor project |
Third Line TS |
Low Voltage Reactive Compensation |
2010-Q1
|
Complete |
Final Report
|
| 2009-EX445 |
HYDRO ONE NETWORKS INC. |
Petawawa DS New T1 and T2 |
Petawawa DS |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX444 |
HYDRO ONE NETWORKS INC. |
Beamsville TS Mobile Cap Bank Removal |
Beamsville TS |
Low Voltage Reactive Compensation |
2010-Q1
|
Complete |
Final Report
|
| 2009-EX443 |
ONTARIO POWER GENERATION - HYDRO |
New T2 at Manitou Falls GS |
Manitou Falls GS |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX442 |
ENBRIDGE PIPELINES INC. |
New circuit switchers at Keyser & Bryanston |
Keyser & Bryanston facilites |
Station Work |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX441 |
HYDRO ONE NETWORKS INC. |
New Keewatin DS |
NW of Kenora |
New Supply Point |
2012-Q4
|
Complete |
Final Report
|
| 2009-EX440 |
TRANSCANADA PIPELINES LTS. |
Grafton Compressor Station 136 Upgrade |
Grafton, Ontario |
New Breakers |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX439 |
WATERLOO NORTH HYDRO INC. |
Schiefele A Protection System upgrade |
Scheifele A MTS |
Protection Modifications |
2009-Q2
|
Complete |
Final Report
|
| 2009-EX438 |
FORD MOTOR COMPANY OF CANADA, LIMITED |
Replace disconnect switch |
Ford Oakville |
Like for Like |
|
Withdrawn |
|
| 2009-EX437 |
ONTARIO POWER GENERATION - HYDRO |
Harmon GS Tansformer Replacement |
Harmon GS |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX436 |
TRANSALTA GENERATION PARTNERSHIP |
Upgrade GT at TA Windsor |
Windsor Transalta CGS West |
New Generation |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX435 |
VALE INCO LTD. |
New tie disconnect at Copper Cliff CTS4 |
Inco #4 CTS |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX434 |
KENORA HYDRO ELECTRIC CORP LTD. |
Kenora MTS rebuild |
Kenora MTS |
Modified Connection |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX433 |
ONTARIO POWER GENERATION - HYDRO |
Mountain Chute G2 Exciter Replacement |
Mountain Chute GS |
Replacement of Generator Controls |
2010-Q2
|
Complete |
Final Report
|
| 2009-EX432 |
HYDRO ONE NETWORKS INC. |
Replace T8 at Porcupine TS |
Porcupine TS |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX431 |
ERIE SHORES WIND FARM LTD PARTNERSHIP |
Revise line protections on T11T |
T11T |
Protection Modifications |
|
Complete |
Final Report
|
| 2009-EX430 |
HYDRO ONE NETWORKS INC. |
Wawa R1 Reactor Replacement |
Wawa |
Station Work |
2009-Q1
|
Active |
Final Draft Report
|
| 2009-EX429 |
HYDRO ONE NETWORKS INC. |
Replace disconnect switches at Nanticoke TS |
Nanticoke TS |
Station Work |
2010-Q3
|
Active |
Final Draft Report
|
| 2009-EX428 |
TRANSCANADA PIPELINES LTS. |
Shannonville Compressor Station 139 Upgrade |
Shannonville, ON |
Like for Like |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX427 |
HYDRO ONE NETWORKS INC. |
New In-Line switches on H9A |
Near Hawthorne TS |
Transmission |
|
Active |
Final Draft Report
|
| 2009-EX426 |
HYDRO ONE NETWORKS INC. |
Refurbish North Bay TS |
North Bay TS |
Transmission Upgrades |
2011-Q4
|
Complete |
Final Report
|
| 2009-EX425 |
HYDRO ONE NETWORKS INC. |
Gage TS new A4-A5 & H2-H3 switches |
Gage TS |
Station Work |
2009-Q3
|
Active |
Final Draft Report
|
| 2009-EX424 |
BROOKFIELD RENEWABLE POWER INC. |
Aubrey Falls GS - Generator upgrades |
Aubrey Falls GS |
New Generation |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX423 |
GREAT LAKES POWER - GENERATION |
Gartshore G1 Exciter and Governor upgrades |
Gartshore GS |
Replacement of Generator Controls |
2009-Q3
|
Complete |
Final Report
|
| 2009-EX422 |
HYDRO ONE NETWORKS INC. |
P3S refurbishment |
Dobbin TS to Sidney TS |
Transmission Upgrades |
2010-Q4
|
Complete |
Final Report
|
| 2009-EX421 |
HYDRO ONE NETWORKS INC. |
Replace four 230 kV breakers at Pickering A SS |
Pickering A SS |
Non-Impactive New Equipment |
2012-Q2
|
Complete |
Final Report
|
| 2009-EX420 |
HYDRO ONE NETWORKS INC. |
New in-line switch on Q2AH |
Near Holland Rd JCT |
Non-Impactive New Equipment |
2009-Q1
|
Active |
Final Draft Report
|
| 2009-EX419 |
ONTARIO POWER GENERATION - HYDRO |
Protection changes for T1 & T2 at Otter Rapids GS |
Otter Rapids GS |
Protection Modifications |
2009-Q3
|
Complete |
Final Report
|
| 2008-EX418 |
ONTARIO POWER GENERATION - HYDRO |
Replace T1 & T2 at Otto Holden GS |
Otto Holden GS |
Like for Like |
2010-Q3
|
Complete |
Final Report
|
| 2008-EX417 |
ONTARIO POWER GENERATION - HYDRO |
Replace T1 to T4 at Des Joachims GS |
Des Joachims GS |
Like for Like |
2013-Q2
|
Complete |
Final Report
|
| 2008-EX416 |
ONTARIO POWER GENERATION - HYDRO |
Pine Portage GS G3 & G4 Protection Changes |
Pine Portage GS |
Standard Protection Equipment Replacements |
2009-Q1
|
Complete |
Final Report
|
| 2008-EX415 |
NORFOLK POWER DISTRIBUTION INC. |
New T2 at Bloomsburg MTS |
Bloomsburg MTS |
Modified Connection |
2009-Q4
|
Complete |
Final Report
|
| 2008-EX414 |
XSTRATA NICKEL |
Onaping Area #1 SS - new circuit switchers |
Onaping Area #1 SS |
Modified Connection |
2010-Q3
|
Complete |
Final Report
|
| 2008-EX413 |
ONTARIO POWER GENERATION - HYDRO |
Beck 1 Governor Replacements |
Sir Adam Beck 1 GS |
Replacement of Generator Controls |
2011-Q1
|
Complete |
Final Report
|
| 2008-EX412 |
GEORGIA PACIFIC THOROLD |
GP Thorold new switcher and protection changes |
GP Thorold mill 121 kV substation |
Non-Impactive New Equipment |
2009-Q2
|
Complete |
Final Report
|
| 2008-EX411 |
HYDRO ONE NETWORKS INC. |
Glengrove TS new feeder breakers T1 & T3 |
Glengrove TS |
Low Voltage Feeder Breaker |
2009-Q2
|
Active |
Draft Report
|
| 2008-EX410 |
HYDRO ONE NETWORKS INC. |
Longwood R4N & R5N; Hawthorne R2N replacements |
Various |
Like for Like |
|
Active |
Final Draft Report
|
| 2008-EX409 |
HYDRO ONE NETWORKS INC. |
2009 Switch replacement list |
Various |
Like for Like |
2009-Q4
|
Active |
Final Draft Report
|
| 2008-EX408 |
HYDRO ONE NETWORKS INC. |
Elliot Lake new T3 |
Elliot Lake TS |
Like for Like |
2009-Q3
|
Active |
Final Draft Report
|
| 2008-EX407 |
ONTARIO POWER GENERATION - HYDRO |
Protection Changes for C27P at Arnprior GS |
Arnprior GS |
Protection Modifications |
2008-Q4
|
Complete |
Final Report
|
| 2008-EX406 |
HYDRO ONE NETWORKS INC. |
Q4N Conductor Relocation |
Between Adam Beck GS1 and Stanley TS |
Transmission Upgrades |
2009-Q2
|
Active |
Final Draft Report
|
| 2008-EX405 |
HYDRO ONE NETWORKS INC. |
Replace failed Cherrywood T16 |
Cherrywood TS |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX404 |
HYDRO ONE NETWORKS INC. |
Replace failed Alliston T4 with system spare |
Alliston TS |
Like for Like |
2008-Q3
|
Active |
Final Draft Report
|
| 2008-EX403 |
HYDRO ONE NETWORKS INC. |
Replace failed Keith T23 with system spare |
Keith TS |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX402 |
ONTARIO POWER GENERATION - HYDRO |
Whitedog Falls T1 Protection Changes |
Whitedog Falls GS |
Like for Like |
2008-Q4
|
Complete |
Final Report
|
| 2008-EX401 |
ONTARIO POWER GENERATION - HYDRO |
Pine Portage GS G1 & G2 Protection Changes |
Pine Portage GS |
Standard Protection Equipment Replacements |
2008-Q3
|
Complete |
Final Report
|
| 2008-EX400 |
FIVE NATIONS ENERGY INC. |
Kashechewan 2nd Transformer Installation |
Kashechewan, ON |
Station Work |
2009-Q2
|
Complete |
Final Report
|
| 2008-EX399 |
HYDRO ONE NETWORKS INC. |
Replace Failed Alliston T3 with System Spare |
Alliston TS |
Like for Like |
2008-Q3
|
Active |
Final Draft Report
|
| 2008-EX398 |
HYDRO ONE NETWORKS INC. |
Replace Hearn SC12A breaker |
Hearn SS |
Like for Like |
2008-Q3
|
Active |
Final Draft Report
|
| 2008-EX397 |
HYDRO ONE NETWORKS INC. |
Replace Buchanan SC11SC breaker |
Buchanan TS |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX396 |
LAKE SUPERIOR POWER LIMITED PARTNERSHIP |
Lake Superior Power STG1 Exciter Replacement |
Lake Superior Power |
Replacement of Generator Controls |
2008-Q3
|
Complete |
Final Report
|
| 2008-EX395 |
HYDRO ONE NETWORKS INC. |
Beamsville T3 and T4 replacement |
Beamsville TS |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX394 |
HYDRO ONE NETWORKS INC. |
Cedar TS SC1 Replacement |
Cedar TS |
Like for Like |
|
Withdrawn |
|
| 2008-EX393 |
HYDRO ONE NETWORKS INC. |
Orangeville TS new T3-H & T4-A |
Orangeville TS |
Like for Like |
2008-Q2
|
Active |
Final Draft Report
|
| 2008-EX392 |
HYDRO ONE NETWORKS INC. |
Glengrove new T1 and T4 |
Glengrove TS |
Like for Like |
2009-Q4
|
Complete |
Final Report
|
| 2008-EX391 |
HYDRO ONE NETWORKS INC. |
Highbury New T4 |
Highbury |
Like for Like |
2009-Q4
|
Active |
Final Draft Report
|
| 2008-EX390 |
HYDRO ONE NETWORKS INC. |
Hearst TS Refurbishment |
Hearst TS |
Like for Like |
2008-Q3
|
Active |
Final Draft Report
|
| 2008-EX389 |
HYDRO ONE NETWORKS INC. |
Ardoch DS Refurbishment/Transformer Replacement |
Ardoch DS |
Non-Impactive New Equipment |
2008-Q2
|
Active |
Final Draft Report
|
| 2008-EX388 |
ONTARIO POWER GENERATION - HYDRO |
Decew Falls #2 G1 Pilot Exciter Replacement |
Decew Falls #2 GS |
Replacement of Generator Controls |
2009-Q1
|
Complete |
Final Report
|
| 2008-EX387 |
HYDRO ONE NETWORKS INC. |
Hanmer R6 Replacement |
Hanmer TS |
Like for Like |
2008-Q3
|
Active |
Final Draft Report
|
| 2008-EX386 |
HYDRO ONE NETWORKS INC. |
Hanlon TS Feeder Breakers |
Hanlon TS |
Low Voltage Feeder Breaker |
2009-Q4
|
Active |
Final Draft Report
|
| 2008-EX385 |
HYDRO ONE NETWORKS INC. |
Stayner L/R Removal |
Stayner TS |
Special Protection System |
2009-Q2
|
Active |
Final Draft Report
|
| 2008-EX384 |
HYDRO ONE NETWORKS INC. |
2008 Breaker Replacements |
Various |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX383 |
CANADIAN HYDRO DEVELOPERS INC. |
T1 Replacement at Amaranth CTS |
Amaranth CTS |
Like for Like |
2008-Q2
|
Complete |
Final Report
|
| 2008-EX382 |
ONTARIO POWER GENERATION - HYDRO |
AVR Replacements at Chenaux GS |
Chenaux GS |
Replacement of Generator Controls |
2009-Q1
|
Complete |
Final Report
|
| 2008-EX381 |
HYDRO ONE NETWORKS INC. |
New 115 kV switch on L7S at St. Mary's Cement CTS |
St. Mary's Cement CTS |
Non-Impactive New Equipment |
2010-Q4
|
Active |
Final Draft Report
|
| 2008-EX380 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS Voltage Study |
Third Line TS |
Special Protection System |
2009-Q4
|
Complete |
Final Report
|
| 2008-EX379 |
HYDRO ONE NETWORKS INC. |
Q5G Removal at Beck SS#1 |
Beck SS#1 |
Modified Connection |
2008-Q4
|
Active |
Final Draft Report
|
| 2008-EX377 |
BROOKFIELD POWER |
Upgrade Mackay GS Unit 3 Excitation |
Mackay GS |
Replacement of Generator Controls |
2008-Q4
|
Complete |
Final Report
|
| 2008-EX376 |
HYDRO ONE NETWORKS INC. |
Interim S3S/S4S Reconfiguration |
Smokey Falls |
Temporary Connections |
2008-Q1
|
Active |
Final Draft Report Diagram 1
|
| 2008-EX375 |
KENORA HYDRO ELECTRIC CORP LTD. |
Replace T2 at Kenora MTS |
Kenora MTS |
Like for Like |
2008-Q1
|
Complete |
Final Report
|
| 2008-EX374 |
ONTARIO POWER GENERATION - HYDRO |
Replace G4T & G5T at Stewartville GS |
Stewartville GS |
Like for Like |
2008-Q2
|
Withdrawn |
|
| 2007-EX373 |
NORTHLAND POWER INC. |
Upgrade AVR on Cochrane G1 & G2 |
Cochrane GS |
Replacement of Generator Controls |
2007-Q4
|
Complete |
|
| 2007-EX372 |
ONTARIO POWER GENERATION - HYDRO |
Return of Thunder Bay C1 |
Thunderbay |
Modified Connection |
2008-Q1
|
Complete |
Final Report
|
| 2007-EX371 |
ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP |
Replace Exciter and Controls at Sturgeon Falls |
Abitibi Sturgeon Falls CGS |
Replacement of Generator Controls |
2008-Q1
|
Complete |
Final Report
|
| 2007-EX370 |
ABITIBI CONSOLIDATED HYDRO LTD PARTNERSHIP |
Replace Exciter and Controls at Calm Lake GS |
Abitibi Calm lake GS |
Replacement of Generator Controls |
2008-Q1
|
Complete |
Final Report
|
| 2007-EX369 |
HYDRO ONE NETWORKS INC. |
Replace T2 & T3 at Birmingham TS |
Birmingham TS |
Like for Like |
2009-Q1
|
Active |
Final Draft Report
|
| 2007-EX368 |
HYDRO ONE NETWORKS INC. |
New T5 at Erindale TS |
Erindale TS |
Non-Impactive New Equipment |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX367 |
HYDRO ONE NETWORKS INC. |
Replace transformers at Woodroffe TS |
Woodroffe TS |
Non-Impactive New Equipment |
2010-Q2
|
Complete |
Final Report
|
| 2007-EX366 |
HYDRO ONE NETWORKS INC. |
Monteith DS - T1 Transformer Replacement |
Monteith DS |
Like for Like |
2007-Q4
|
Active |
Final Draft Report
|
| 2007-EX365 |
HYDRO ONE NETWORKS INC. |
L23N, V41N and V43N phase reconfiguration |
H-frame structures north of Lasalle Road |
Transmission |
2009-Q4
|
Active |
Final Draft Report
|
| 2007-EX364 |
HYDRO ONE NETWORKS INC. |
L1S Section Replacement |
Between Coniston TS and Sudbury Jct |
Transmission |
2009-Q2
|
Active |
Final Draft Report
|
| 2007-EX363 |
BROOKFIELD POWER |
Governor replacement at Hollingsworth GS |
Hollingsworth GS |
Replacement of Generator Controls |
2007-Q4
|
Complete |
Final Report
|
| 2007-EX362 |
HYDRO ONE NETWORKS INC. |
Replace Circuit Switchers K1G & K2G at Gage TS |
Gage TS |
Like for Like |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX361 |
HYDRO ONE NETWORKS INC. |
2008 Switch Replacement List |
Various |
Non-Impactive New Equipment |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX360 |
HYDRO ONE NETWORKS INC. |
Longlac TS - Refurbish 115-44 kV TS |
Longlac TS |
Modified Connection |
2011-Q4
|
Active |
Final Draft Report
|
| 2007-EX359 |
HYDRO ONE NETWORKS INC. |
Decommission R27-S & R76-S |
Sir Adam Beck 2 |
Modified Connection |
2012-Q4
|
Complete |
Final Report
|
| 2007-EX358 |
HYDRO ONE NETWORKS INC. |
Navan DS Redevelopment |
Navan DS |
Modified Connection |
2008-Q3
|
Active |
Final Draft Report
|
| 2007-EX357 |
ONTARIO POWER GENERATION - HYDRO |
Nanticoke T6R & T6B Replacements |
Nanticoke GS |
Like for Like |
2007-Q4
|
Complete |
Final Report
|
| 2007-EX356 |
HYDRO ONE NETWORKS INC. |
Remove idle section of 115 kV T2R |
Falconbridge |
Transmission |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX355 |
HYDRO ONE NETWORKS INC. |
Remove idle sections of 230 kV B20P and B24P |
Port Elgin |
Transmission |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX354 |
LAKE SUPERIOR POWER LIMITED PARTNERSHIP |
Exciter Replacement - Lake Superior GS |
Lake Superior GS |
Replacement of Generator Controls |
2007-Q4
|
Complete |
Final Report
|
| 2007-EX353 |
NORFOLK POWER DISTRIBUTION INC. |
A12N Tap to Bloomsburg MTS |
Bloomsburg MTS |
Modified Connection |
2009-Q2
|
Active |
Final Draft Report
|
| 2007-EX352 |
MISSISSAGI POWER TRUST |
T27 & T28 Transformer Replacements at Wells GS |
Wells GS |
Transmission Upgrades |
2008-Q2
|
Complete |
Final Report
|
| 2007-EX351 |
BRUCE POWER INC. |
Bruce U5 & U7 exciter replacements |
Bruce B |
Replacement of Generator Controls |
|
Withdrawn |
|
| 2007-EX350 |
HYDRO ONE NETWORKS INC. |
New 44 kV Feeder at Kleinburg TS |
Kleinburg TS |
Low Voltage Feeder Breaker |
2008-Q2
|
Active |
Final Draft Report
|
| 2007-EX349 |
HYDRO ONE NETWORKS INC. |
BSPS modifications |
Bruce B SS and various TSs |
Special Protection System |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX348 |
NIAGARA-ON-THE-LAKE HYDRO INC. |
New 115 kV Circuit Switchers at NOTL MTS#2 |
Niagara on the Lake |
Non-Impactive New Equipment |
2008-Q2
|
Complete |
Final Report
|
| 2007-EX347 |
HYDRO ONE NETWORKS INC. |
Remove idle section of L5H |
North Bay |
Transmission |
2008-Q4
|
Active |
Final Draft Report
|
| 2007-EX346 |
HYDRO ONE NETWORKS INC. |
New 230 kV Disconnect Switches at Pinard TS |
Pinard TS |
Non-Impactive New Equipment |
2009-Q4
|
Active |
Final Draft Report
|
| 2007-EX345 |
ABITIBI-CONSOLIDATED COMPANY OF CANADA |
West Coast Energy New AVR |
Fort Frances |
Replacement of Generator Controls |
2008-Q2
|
Complete |
Final Report
|
| 2007-EX344 |
HYDRO ONE NETWORKS INC. |
Caledonia TS New Feeder Breaker Position |
Caledonia TS |
Low Voltage Feeder Breaker |
2008-Q2
|
Active |
Final Draft Report
|
| 2007-EX343 |
HYDRO OTTAWA LIMITED |
Marchwood MTS Refurbishment |
Marchwood MTS |
Station Work |
2008-Q2
|
Complete |
Final Report
|
| 2007-EX342 |
GREAT LAKES POWER - TRANSMISSION |
MacKay TS – No.3 Sault G/R Scheme |
MacKay TS |
Special Protection System |
2009-Q4
|
Complete |
Final Report
|
| 2007-EX341 |
HYDRO ONE NETWORKS INC. |
Replace SC22A at Richview TS |
Richview TS |
Like for Like |
2007-Q3
|
Active |
Final Draft Report
|
| 2007-EX340 |
HYDRO ONE NETWORKS INC. |
Replace Glengrove T3 |
Glengrove TS |
Like for Like |
2007-Q3
|
Active |
Final Draft Report
|
| 2007-EX339 |
HYDRO ONE NETWORKS INC. |
Stayner TS SC2 Shunt Cap Retirement |
Stayner TS |
Retirement of Facilities |
2009-Q2
|
Active |
Final Draft Report
|
| 2007-EX338 |
GREAT LAKES POWER - TRANSMISSION |
New 115kV Line Disconnect Switch on Steephill Line |
Northeast |
Like for Like |
2007-Q3
|
Complete |
Final Report
|
| 2007-EX337 |
HYDRO ONE NETWORKS INC. |
2007 Switch Replacement Program - 3 added switches |
Various |
Like for Like |
|
Withdrawn |
|
| 2007-EX336 |
MISSISSAGI POWER TRUST |
Scott GS Excitation Upgrade |
Scott GS |
Replacement of Generator Controls |
2007-Q4
|
Complete |
Final Report
|
| 2007-EX335 |
HYDRO ONE NETWORKS INC. |
Weston Lake DS Refurbishment |
Ottawa |
Transmission Upgrades |
2007-Q2
|
Complete |
Final Report
|
| 2007-EX334 |
WESDOME GOLD MINES LTD. |
Eagle River Mine T1 Replacement |
Steephill Falls |
Transmission Upgrades |
2007-Q2
|
Complete |
Final Report
|
| 2007-EX333 |
HYDRO ONE NETWORKS INC. |
Installation of LV Shunt Capacitor at Whitby TS #1 |
Whitby TS #1 |
Reactive Compensation |
2008-Q2
|
Active |
Final Draft Report
|
| 2007-EX331 |
HYDRO ONE NETWORKS INC. |
New 115 kV MSO style switch on L7S |
West of Portland Jct |
Non-Impactive New Equipment |
2007-Q2
|
Active |
Final Draft Report
|
| 2007-EX330 |
HYDRO ONE NETWORKS INC. |
Replace Failed Bramalea T1 with System Spare |
Bramalea |
Like for Like |
2007-Q2
|
Active |
Final Draft Report
|
| 2007-EX329 |
ONTARIO POWER GENERATION - HYDRO |
Abitibi Cayon G2&G3 Upgrades |
Northwest |
Transmission Upgrades |
2007-Q2
|
Complete |
Report
|
| 2007-EX328 |
HYDRO ONE NETWORKS INC. |
Lambton 230 kV switchyard upgrade |
Lambton TS |
Station Work |
2011-Q3
|
Active |
Final Draft Report
|
| 2007-EX327 |
HYDRO ONE NETWORKS INC. |
B5D-Q Switch Replacement |
On B5D line near Quebec |
Like for Like |
2007-Q2
|
Complete |
Report
|
| 2007-EX326 |
ONTARIO POWER GENERATION - HYDRO |
Abitibi G3G4 Upgrades |
Northwest |
New Generation |
2007-Q2
|
Withdrawn |
|
| 2007-EX325 |
HYDRO ONE NETWORKS INC. |
Pinard T1 Replacement |
North East |
Transmission Upgrades |
2007-Q2
|
Active |
Final Draft Report
|
| 2007-EX324 |
MISSISSAGI POWER TRUST |
Aubrey G2 Exciter Replacement |
NW |
Replacement of Generator Controls |
2007-Q2
|
Complete |
Report
|
| 2007-EX323 |
GREAT LAKES POWER - TRANSMISSION |
Magpie TS Protection Refurbishment |
Sault Ste. Marie |
Protection Modifications |
2007-Q4
|
Withdrawn |
|
| 2007-EX322 |
GREAT LAKES POWER - TRANSMISSION |
MacKay TS 115 kV Refurbishment |
Sault Ste. Marie |
Like for Like |
2008-Q3
|
Complete |
Final Report
|
| 2007-EX321 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS 115 kV Refurbishment |
Third Line TS |
Like for Like |
2009-Q4
|
Complete |
Final Report
|
| 2007-EX320 |
HYDRO ONE NETWORKS INC. |
Wilhaven DS Upgrade |
Wilhaven, ON |
Transmission Upgrades |
2007-Q2
|
Complete |
Final Report
|
| 2007-EX319 |
LAFARGE NORTH AMERICA |
Replace T1 at Lafarge Bath CTS |
East |
Like for Like |
2007-Q1
|
Complete |
Report
|
| 2007-EX318 |
HYDRO ONE NETWORKS INC. |
Install LV Shunt Capacitor at Belle River |
Belle River TS |
Station Work |
2008-Q1
|
Active |
Final Draft Report
|
| 2007-EX317 |
BROOKFIELD WIND POWER CORPORATION |
Clergue GS units 1 and 3 |
Clergue GS |
Generator Upgrades |
2007-Q2
|
Complete |
Report
|
| 2007-EX316 |
ONTARIO POWER GENERATION - HYDRO |
Cameron G3&G4 Runner Upgrades |
Cameron Falls GS |
New Generation |
2008-Q2
|
Complete |
Final Report
|
| 2007-EX315 |
ONTARIO POWER GENERATION - HYDRO |
Decew Falls Unit 2 Upgrade |
Southwest |
New Generation |
2007-Q2
|
Complete |
Report
|
| 2006-EX314 |
WATERLOO NORTH HYDRO INC. |
Eby Rush TS - Upgrade 2 Transformers |
Eby Rush TS, Waterloo |
Transmission Upgrades |
2010-Q1
|
Complete |
Final Report Addendum 1
|
| 2006-EX313 |
GREAT LAKES POWER - TRANSMISSION |
3rd Line TS - T1 Replacement |
Sault Ste. Marie |
Transmission Upgrades |
2007-Q4
|
Complete |
Report
|
| 2006-EX312 |
ONTARIO POWER GENERATION - HYDRO |
Nanticoke T5 - R & B Replacements |
Nanticoke GS |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2006-EX311 |
TECK-CORONA |
New 138 kV CB at Teck-Corona David Bell Mine |
Marathon |
Like for Like |
2007-Q2
|
Complete |
Report
|
| 2006-EX310 |
ONTARIO POWER GENERATION - HYDRO |
Nanticoke G5&G6 Turbine Upgrades |
Nanticoke GS |
New Generation |
2007-Q4
|
Complete |
Report
|
| 2006-EX309 |
HYDRO ONE NETWORKS INC. |
Replace Cecil T2 |
Toronto |
Transmission Upgrades |
2006-Q4
|
Complete |
Report
|
| 2006-EX308 |
HYDRO ONE NETWORKS INC. |
Bronte TS 27.6 kV Bus tie connection / Feeders |
Bronte TS |
Station Work |
2008-Q2
|
Active |
Final Draft Report
|
| 2006-EX307 |
HYDRO ONE NETWORKS INC. |
Beauharnois G/R Modifications |
St. Lawrence TS |
Special Protection System |
|
Withdrawn |
|
| 2006-EX306 |
HYDRO ONE NETWORKS INC. |
Nelson T4 Replacement |
Nelson TS |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2006-EX305 |
GREAT LAKES POWER - TRANSMISSION |
Andrews 115 kV Switch |
Andrews TS |
Modified Connection |
2006-Q4
|
Complete |
Report
|
| 2006-EX304 |
ONTARIO POWER GENERATION - HYDRO |
Abitibi Canyon GS - G5 Exciter & Runner Upgrade |
Abitibi Canyon GS |
Generator Upgrades |
2006-Q4
|
Complete |
Report
|
| 2006-EX303 |
POWERSTREAM INC. |
Vaughn MTS #1 - T1 & T2 Switch Replacement |
Vaughn MTS #1 |
Like for Like |
2007-Q2
|
Complete |
Final Report
|
| 2006-EX302 |
HYDRO ONE NETWORKS INC. |
Duplex TS - Circuit Switcher Replacement |
Duplex TS |
Like for Like |
2008-Q2
|
Active |
Draft Report
|
| 2006-EX301 |
HYDRO ONE NETWORKS INC. |
Chats Falls - Switch Replacement |
Chat Falls TS |
Like for Like |
2007-Q3
|
Active |
Final Draft Report
|
| 2006-EX300 |
HYDRO ONE NETWORKS INC. |
Niagara Murray - New Metal Clad Switchgear |
Niagara Murray TS |
Like for Like |
2007-Q1
|
Complete |
Report
|
| 2006-EX299 |
HYDRO ONE NETWORKS INC. |
New T6 & 230/115 kV Equipment at Burlington TS |
Burlington TS |
Station Work |
2012-Q4
|
Complete |
Final Draft Report Addendum 1
|
| 2006-EX298 |
HYDRO ONE NETWORKS INC. |
Burlington 2 PU Scheme |
Burlington TS |
Protection Modifications |
2007-Q4
|
Active |
Final Draft Report
|
| 2006-EX297 |
HYDRO ONE NETWORKS INC. |
Unbundle 500 kV circuits C550V & C551V |
Claireville TS & Cherrywood TS |
Transmission |
2010-Q4
|
Complete |
Report Appendix
|
| 2006-EX296 |
HYDRO ONE NETWORKS INC. |
Replacement of 115 kV cable H3L |
Toronto |
Transmission |
2009-Q1
|
Active |
Final Draft Report
|
| 2006-EX295 |
BRUCE POWER INC. |
Bruce Standby Generators |
Bruce Nuclear GS |
Replacement of Generator Controls |
2009-Q1
|
Complete |
Final Report Addendum 1
|
| 2006-EX294 |
BRUCE POWER INC. |
Bruce 5-8 Exciter Replacements |
Bruce GS |
Replacement of Generator Controls |
2006-Q4
|
Complete |
Report Addendum 1
|
| 2006-EX293 |
HYDRO ONE NETWORKS INC. |
Reconnect SC23 to K bus at Chatham SS |
Chatham SS |
Reactive Compensation |
|
Complete |
Report
|
| 2006-EX292 |
HYDRO ONE NETWORKS INC. |
Goderich T1 Replacement |
Goderich TS |
Transmission Upgrades |
2006-Q3
|
Complete |
Report
|
| 2006-EX291 |
HYDRO ONE NETWORKS INC. |
Restring 230 kV Circuit B3N |
Sarnia |
Transmission |
2006-Q4
|
Complete |
Report
|
| 2006-EX290 |
ONTARIO POWER GENERATION - HYDRO |
Not used -Duplicate with 304 |
Abitibi Canyon GS |
Replacement of Generator Controls |
2006-Q3
|
Withdrawn |
Report
|
| 2006-EX289 |
HYDRO ONE NETWORKS INC. |
Capacitor Bank Replacements 2007-08 |
Various |
Like for Like |
2007-Q1
|
Active |
Final Draft Report
|
| 2006-EX287 |
CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. |
4 x 27.6 kV Feeder Breakers - MTS#1 |
Cambridge #1 TS |
Low Voltage Feeder Breaker |
2007-Q2
|
Complete |
Report
|
| 2006-EX286 |
HYDRO ONE NETWORKS INC. |
Burlington TS - T4 Replacement |
Burlington |
Like for Like |
2006-Q3
|
Complete |
Report
|
| 2006-EX285 |
HYDRO ONE NETWORKS INC. |
2007 Switch Replacement List |
Various |
Like for Like |
2007-Q1
|
Complete |
Report
|
| 2006-EX284 |
WATERLOO NORTH HYDRO INC. |
Scheifele A TS EOL Replacements |
Scheifele A TS |
Like for Like |
2006-Q3
|
Complete |
Report
|
| 2006-EX283 |
HYDRO ONE NETWORKS INC. |
Q2AH / Q5G Conductor Replacement |
Beamsville to Hamilton Beach |
Transmission |
2006-Q4
|
Complete |
Report
|
| 2006-EX282 |
ONTARIO POWER GENERATION - HYDRO |
Exciter Replacement for G3&G4 at Alexander GS |
Alexander GS |
Low Voltage Reactive Compensation |
2006-Q3
|
Active |
Final Report
|
| 2006-EX281 |
ONTARIO POWER GENERATION - HYDRO |
Mountain Chute GS- T1/T2 replacement |
Mountain Chute GS |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2006-EX280 |
HYDRO OTTAWA LIMITED |
Epworth TS - 58T2 |
Ottawa |
Like for Like |
2007-Q4
|
Complete |
Report
|
| 2006-EX279 |
HYDRO ONE NETWORKS INC. |
Carlton TS - T2 & T3 |
Carlton TS |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2006-EX278 |
HYDRO ONE NETWORKS INC. |
Nanticoke Switch Replacement 59-N2M |
Nanticoke TS |
Like for Like |
2006-Q2
|
Complete |
Report
|
| 2006-EX277 |
HYDRO ONE NETWORKS INC. |
Re-termination of 230 kV circuits E27 & M6E |
Essa TS |
Modified Connection |
2007-Q3
|
Complete |
Report
|
| 2006-EX276 |
HAMILTON SPECIALITY BAR CORP. |
Replace 92-HL4 & 92-HL3 Switches |
Hamilton Specialty Bar |
Like for Like |
2006-Q3
|
Complete |
Report
|
| 2006-EX273 |
HYDRO ONE NETWORKS INC. |
Porcupine TS - Shunt Reactor Installation |
Porcupine TS |
Reactive Compensation |
|
On-Hold |
|
| 2006-EX272 |
HYDRO ONE NETWORKS INC. |
Replace Cherrywood T14 |
Cherrywood TS |
Like for Like |
2007-Q4
|
Complete |
Report
|
| 2006-EX271 |
HYDRO ONE NETWORKS INC. |
Replace End-of-Life Hanmer R9 |
Hanmer TS |
Like for Like |
2007-Q3
|
Active |
Final Draft Report
|
| 2006-EX270 |
HYDRO ONE NETWORKS INC. |
Wiltshire T1 |
Wiltshire TS |
Like for Like |
2006-Q2
|
Complete |
Report
|
| 2006-EX269 |
HYDRO ONE NETWORKS INC. |
Bronte TS Transformer Replacement |
Bronte TS |
Like for Like |
2006-Q2
|
Complete |
Report
|
| 2006-EX268 |
HYDRO ONE NETWORKS INC. |
Manby TS; T5 & T6 Replacement |
Manby TS |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2006-EX267 |
HYDRO ONE NETWORKS INC. |
Birmingham T4 Replacement |
Birmingham TS |
Like for Like |
2006-Q1
|
Complete |
Report
|
| 2006-EX266 |
HYDRO ONE NETWORKS INC. |
Buchanan TS - Four New Feeders |
Buchanan TS |
Additional Load |
2007-Q1
|
Active |
Final Draft Report
|
| 2006-EX265 |
ONTARIO POWER GENERATION - HYDRO |
Lambton T4 Replacement |
Lambton GS |
Like for Like |
2006-Q1
|
Complete |
Report
|
| 2006-EX264 |
HYDRO ONE NETWORKS INC. |
2006 Switch Replacement Program |
Various |
Like for Like |
2006-Q4
|
Complete |
Report
|
| 2005-EX263 |
HAMILTON SPECIALITY BAR CORP. |
T2 Replacement |
Hamilton Speciality Bar |
Like for Like |
2006-Q1
|
Complete |
Report
|
| 2005-EX262 |
NATIONAL RESEARCH COUNCIL |
NRC Breaker Replacement |
Ottawa |
Like for Like |
2006-Q1
|
Complete |
Report
|
| 2005-EX261 |
HYDRO ONE NETWORKS INC. |
L25N/L27N In-Line Breakers (Nova Chemical SS) |
L25N/L27N Right of Way at Petrosar Junction |
Transmission |
2006-Q4
|
Complete |
Report
|
| 2005-EX260 |
ONTARIO POWER GENERATION - HYDRO |
Ranney Falls Upgrade & Healey Falls GS |
Campbellford & Seymour Township |
New Generation |
2010-Q1
|
Complete |
Final Report
|
| 2005-EX259 |
HYDRO ONE NETWORKS INC. |
W42L / W43L Replacement |
Buchanan TS X Longwood TS |
Transmission |
2008-Q4
|
Withdrawn |
|
| 2005-EX258 |
HYDRO ONE NETWORKS INC. |
Gage TS 24-B10 & 24-B11 circuit switcher replaceme |
Gage TS |
Like for Like |
|
Complete |
Report
|
| 2005-EX257 |
HYDRO ONE NETWORKS INC. |
Bruce A removal of 4 switches |
Bruce A TS |
Retirement of Facilities |
|
Complete |
Report
|
| 2005-EX256 |
ONTARIO POWER GENERATION - HYDRO |
Decew Falls GS Governor Replacement |
Decew Falls |
Generator Upgrades |
2006-Q2
|
Complete |
Report
|
| 2005-EX255 |
ONTARIO POWER GENERATION - HYDRO |
Auxiliary Power Supply |
Pickering GS |
Station Work |
2007-Q2
|
Complete |
Report
|
| 2005-EX254 |
HYDRO ONE NETWORKS INC. |
Woodroffe T4 Replacement |
Woodroffe TS |
Like for Like |
2005-Q4
|
Complete |
Report
|
| 2005-EX253 |
HYDRO ONE NETWORKS INC. |
Two New 27.6 kV Feeder Positions |
Richview TS |
Additional Load |
|
Complete |
Report
|
| 2005-EX252 |
ONTARIO POWER GENERATION - HYDRO |
Lennox GS - Static Exciter Replacements G1-G4 |
Lennox GS |
Like for Like |
2007-Q1
|
Complete |
Report
|
| 2005-EX251 |
MISSISSAGI POWER TRUST |
Wells GS - Excitation System Replacement |
Wells GS |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX250 |
MISSISSAGI POWER TRUST |
Red Rock GS - Pilot Excitation System Replacement |
Red Rock GS |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX249 |
INVISTA (CANADA) COMPANY |
KoSa Millhaven De-registration of Transformer T2 |
KoSa Millhaven - Kingston Ontarioario |
Retirement of Facilities |
|
Complete |
Report
|
| 2005-EX248 |
BROOKFIELD WIND POWER CORPORATION |
Andrews 115kV Substation Upgrade |
Montreal River - North of Sault Ste Marie |
Station Work |
2006-Q2
|
Complete |
Report
|
| 2005-EX247 |
BROOKFIELD WIND POWER CORPORATION |
Gartshore GS Transformer Replacement |
Gartshore Generating Station |
Like for Like |
2005-Q4
|
Complete |
Report
|
| 2005-EX246 |
HYDRO ONE NETWORKS INC. |
N/A |
Horning |
New Breakers |
|
Withdrawn |
|
| 2005-EX245 |
HYDRO ONE NETWORKS INC. |
Installation of four new 13.8 kV feeder positions |
Hamilton |
Additional Load |
2005-Q3
|
Complete |
Report
|
| 2005-EX244 |
HYDRO ONE NETWORKS INC. |
Conductor replacement Q2AH & Q5G |
Louth Jct to Beamsville TS |
Like for Like |
2005-Q4
|
Complete |
Report
|
| 2005-EX243 |
BROOKFIELD WIND POWER CORPORATION |
Clergue GS -Unit 2 Excitation/Governor Upgrade |
St. Mary's River - Sault Ste. Marie |
Generator Upgrades |
2011-Q4
|
Complete |
Report
|
| 2005-EX242 |
ERCO WORLDWIDE |
T2 removal |
Sterling Pump CTS |
Retirement of Facilities |
2005-Q3
|
Complete |
Report
|
| 2005-EX241 |
HYDRO ONE NETWORKS INC. |
Angler Switch JCT-Circuit Switcher |
Angler Switch JCT |
New Breakers |
2005-Q3
|
Complete |
Report
|
| 2005-EX240 |
ONTARIO POWER GENERATION - HYDRO |
Caribou Falls - G2 runner upgrade |
Caribou Falls |
New Generation |
2005-Q4
|
Complete |
Report
|
| 2005-EX239 |
ONTARIO POWER GENERATION - HYDRO |
Caribou Falls transformer upgrade |
Caribou Falls GS |
Transmission Upgrades |
2006-Q2
|
Complete |
Report
|
| 2005-EX238 |
ONTARIO POWER GENERATION - HYDRO |
Niagara TS-25 HZ transformer removal |
Niagara TS |
Retirement of Facilities |
2005-Q3
|
Complete |
Report
|
| 2005-EX237 |
HYDRO ONE NETWORKS INC. |
Replace PLC Facilties |
Chat Falls |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX236 |
HYDRO ONE NETWORKS INC. |
IBP Junction - Beauharnois |
St. Lawrence TS |
Like for Like |
2009-Q4
|
Complete |
Report
|
| 2005-EX235 |
KITCHENER-WILMOT HYDRO INC. |
Replace LV Breakers at Kitchener #5 |
Kitchener No.5 |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX234 |
HYDRO ONE NETWORKS INC. |
St. Isidor TS, Longueuil TS & Hawthorne TS |
Ontario |
Like for Like |
2005-Q3
|
Complete |
Report
|
| 2005-EX233 |
GREAT LAKES POWER - GENERATION |
Anjigami TS Removal of VR1 |
Sault Ste. Marie |
Station Work |
2005-Q3
|
Complete |
Report
|
| 2005-EX232 |
BRUCE POWER INC. |
BRUCE A Transformer replacement (T6) |
BRUCE |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX231 |
HYDRO ONE NETWORKS INC. |
Breaker replacement SC4Q at Bramalea TS |
Bramalea TS |
Like for Like |
|
Complete |
Report
|
| 2005-EX230 |
ONTARIO POWER GENERATION - HYDRO |
Power Supply to Niagara Tunnel Project |
Beck 2 GS |
Temporary Connections |
|
Withdrawn |
|
| 2005-EX229 |
HYDRO ONE NETWORKS INC. |
2005 Thorold TS Switch Project (T2-K) |
Thorold TS |
Modified Connection |
2005-Q2
|
Complete |
Report
|
| 2005-EX228 |
HYDRO ONE NETWORKS INC. |
Transmission Station Re-Investment (ESSEX TS) |
ESSEX TS |
Non-Impactive New Equipment |
2007-Q2
|
Complete |
Report
|
| 2005-EX227 |
HYDRO OTTAWA LIMITED |
Bridlewood 115 KV Circuit Switcher Installation |
321 Eagleson Rd., Kanata |
New Breakers |
2005-Q3
|
Complete |
Report
|
| 2005-EX226 |
ABITIBI-CONSOLIDATED COMPANY OF CANADA |
Revenue Meter Installation at Fort Frances |
Fort Frances |
Retirement of Facilities |
2005-Q2
|
Complete |
Report
|
| 2005-EX225 |
HYDRO ONE NETWORKS INC. |
Trafalgar TS |
Oakville |
Like for Like |
2005-Q2
|
Complete |
Report
|
| 2005-EX224 |
NORANDA INC., GECO DIVISION |
Manitouwadge Air Switch Installation |
Manitouwadge |
New Breakers |
2005-Q2
|
Complete |
Report
|
| 2005-EX223 |
BRUCE POWER INC. |
Bruce B Unit refurbishments |
Bruce |
New Generation |
|
Complete |
Report
|
| 2005-EX222 |
HYDRO ONE NETWORKS INC. |
BSPS - Incorporate wind generation facilities |
Bruce NGS |
Special Protection System |
2008-Q4
|
Complete |
Report Addendum
|
| 2005-EX221 |
HYDRO ONE NETWORKS INC. |
Manby TS T13/T14 Upgrade |
Manby TS |
Additional Load |
|
Withdrawn |
|
| 2005-EX220 |
HYDRO ONE NETWORKS INC. |
2005 Oil Breaker Replacement |
Various |
Like for Like |
|
Complete |
Report
|
| 2005-EX219 |
HYDRO ONE NETWORKS INC. |
2005 Switch Replacement Program |
Various |
Like for Like |
|
Complete |
Report
|
| 2005-EX218 |
HYDRO ONE NETWORKS INC. |
2005 Rod Gap Replacement |
Various |
Like for Like |
|
Complete |
Report
|
| 2005-EX217 |
HYDRO ONE NETWORKS INC. |
2005 Capacitor Bank Replacement |
Various |
Like for Like |
|
Complete |
Report
|
| 2005-EX216 |
HYDRO ONE NETWORKS INC. |
Oshawa GM TS |
Oshawa |
Modified Connection |
|
Complete |
Report
|
| 2005-EX215 |
ONTARIO POWER GENERATION - HYDRO |
Rankine GS |
Niagara |
Like for Like |
|
Complete |
Report
|
| 2005-EX214 |
GREAT LAKES POWER - TRANSMISSION |
Steelton T.S - L/R Scheme |
Steelton TS |
Special Protection System |
|
Complete |
Report
|
| 2005-EX213 |
HYDRO ONE NETWORKS INC. |
Guelph Cedar TS |
Guelph Area |
Low Voltage Feeder Breaker |
2006-Q2
|
Complete |
Report
|
| 2005-EX212 |
HYDRO ONE NETWORKS INC. |
Riverdale TS |
Ottawa |
Like for Like |
2005-Q1
|
Complete |
Report
|
| 2004-EX211 |
GREAT LAKES POWER - TRANSMISSION |
Patrick St. TS Refurbishment |
Sault Ste. Marie |
Transmission |
2006-Q3
|
Complete |
Report
|
| 2004-EX210 |
GREAT LAKES POWER - TRANSMISSION |
Hollingsworth T.S. Refurbishment |
Sault Ste. Marie |
Transmission |
2005-Q4
|
Complete |
Report
|
| 2004-EX209 |
KESTREL POWER ENGINEERING |
Aubrey Falls GS |
Aubrey Falls GS |
Replacement of Generator Controls |
2004-Q4
|
Complete |
Report
|
| 2004-EX208 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS New 115 kV Tie Breaker |
Third Line TS |
Transmission |
2005-Q4
|
Complete |
Report
|
| 2004-EX207 |
ONTARIO POWER GENERATION - HYDRO |
Exciter Replacement Alexander GS |
Alexander GS |
Replacement of Generator Controls |
2004-Q4
|
Complete |
Report
|
| 2004-EX206 |
HYDRO ONE NETWORKS INC. |
J3E & J4E Bypass |
Essex TS |
Modified Connection |
2005-Q4
|
Complete |
Report
|
| 2004-EX205 |
ONTARIO POWER GENERATION - HYDRO |
Lambton T3 Replacement |
Lambton GS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2004-EX204 |
HYDRO ONE NETWORKS INC. |
Porcupine TS |
Porcupine TS |
Station Work |
2007-Q4
|
Complete |
Report Addendum
|
| 2004-EX203 |
ABITIBI-CONSOLIDATED COMPANY OF CANADA |
Sturgeon Falls GS Replace Step-up Transformer |
Sturgeon Falls GS |
Like for Like |
2005-Q4
|
Complete |
Report
|
| 2004-EX202 |
HYDRO ONE NETWORKS INC. |
Hearn SS - Temporary Cables |
Hearn SS |
Modified Connection |
|
Complete |
Report
|
| 2004-EX201 |
ONTARIO POWER GENERATION - HYDRO |
Pickering B NGS |
Pickering B NGS |
Replacement of Generator Controls |
|
Complete |
Report
|
| 2004-EX200 |
HYDRO ONE NETWORKS INC. |
Transformer Replacement |
Wonderland TS |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2004-EX199 |
ONTARIO POWER GENERATION - HYDRO |
Unavaliable |
Lambton GS |
Like for Like |
|
Withdrawn |
|
| 2004-EX198 |
HYDRO ONE NETWORKS INC. |
Replace the 230kV Breaker H2L23 |
Manby TS |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2004-EX197 |
HYDRO ONE NETWORKS INC. |
Pinard Breaker Replacement |
Pinard TS |
Like for Like |
2008-Q4
|
Complete |
Report
|
| 2004-EX196 |
HYDRO ONE NETWORKS INC. |
Nanticoke 230 kV breaker Replacement |
Nanticoke TS |
Like for Like |
2010-Q3
|
Complete |
Report
|
| 2004-EX195 |
ONTARIO POWER GENERATION - HYDRO |
Isolation of T2 at Crystal Falls GS |
Crystal Falls GS |
Modified Connection |
|
Complete |
Report
|
| 2004-EX194 |
ONTARIO POWER GENERATION - HYDRO |
Transformer Replacement |
Sir Adam Beck PGS |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2004-EX193 |
HYDRO ONE NETWORKS INC. |
Transformer B-Winding Isolation |
Lakeview GS |
Modified Connection |
2006-Q2
|
Complete |
Report
|
| 2004-EX192 |
HYDRO ONE NETWORKS INC. |
Madawaska Run-back |
Eastern Region |
Special Protection System |
|
Complete |
Report
|
| 2004-EX191 |
HYDRO ONE NETWORKS INC. |
Replacement of 230 kV breaker PL562 |
Longwood TS |
Like for Like |
2004-Q3
|
Complete |
Report
|
| 2004-EX190 |
ONTARIO POWER GENERATION - HYDRO |
Beck GS Transformer Replacement |
Sir Adam Beck GS#2 |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2004-EX189 |
ONTARIO POWER GENERATION - HYDRO |
Transformer Replacement -Nanticoke T4 |
Nanticoke TGS |
Like for Like |
2004-Q1
|
Complete |
Report
|
| 2004-EX188 |
ONTARIO POWER GENERATION - HYDRO |
Wawaitin GS Exciter Replacement |
Wawaitin GS |
Replacement of Generator Controls |
2004-Q2
|
Complete |
Report
|
| 2004-EX187 |
TRANSALTA COGENERATION LP. |
TransAlta Co-generation Facility-Mississauga |
McDonnell-Douglas |
New Generation |
|
Complete |
Report
|
| 2004-EX186 |
GREAT LAKES POWER - TRANSMISSION |
Northern Ave. TS Project |
Sault St Marie |
Station Work |
2005-Q1
|
Complete |
Report
|
| 2004-EX185 |
HYDRO ONE NETWORKS INC. |
Pickering SS |
Pickering A & B SS |
Protection Modifications |
2004-Q4
|
Complete |
Report
|
| 2004-EX184 |
HYDRO ONE NETWORKS INC. |
Breaker Removal at Sarnia Scott |
Sarnia Scott TS |
Retirement of Facilities |
2004-Q4
|
Complete |
Report
|
| 2004-EX183 |
HYDRO ONE NETWORKS INC. |
Bilberry TS LV cap replacement |
Bilberry TS |
Reactive Compensation |
2004-Q4
|
Complete |
Report
|
| 2004-EX182 |
ONTARIO POWER GENERATION - HYDRO |
Nanticoke T5W replacement |
Nanticoke TGS |
Like for Like |
2004-Q1
|
Complete |
Report
|
| 2004-EX181 |
GREAT LAKES POWER - TRANSMISSION |
Andrews DS Transformer Replacement |
Andrews TS |
Station Work |
2005-Q1
|
Complete |
Report
|
| 2004-EX180 |
ONTARIO POWER GENERATION - HYDRO |
Arnprior GS-PSS replacement |
Arnprior GS |
Replacement of Generator Controls |
2004-Q1
|
Complete |
Report
|
| 2003-EX179 |
ONTARIO POWER GENERATION - HYDRO |
Cameron Falls G5,G6 Refurbishment |
Cameron Falls GS |
Generator Upgrades |
2004-Q2
|
Complete |
Report
|
| 2003-EX178 |
HYDRO ONE NETWORKS INC. |
D6 Temporary in-line Switch |
Chalk River TS |
Temporary Connections |
2003-Q4
|
Complete |
Report
|
| 2003-EX177 |
INCO LIMITED, ONTARIO DIVISION |
Relocation of Transformer |
Frood Stobie No.2 , INCO No.4 |
Modified Connection |
2004-Q1
|
Complete |
Report
|
| 2003-EX176 |
HYDRO ONE NETWORKS INC. |
Kingston-Gardiner TS |
Kingston |
New Supply Point |
2009-Q2
|
Complete |
Report Addendum 1
|
| 2003-EX175 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Essa TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2003-EX174 |
FALCONBRIDGE LIMITED - ONTARIO DIVISIONS |
FALCONBRIDGE |
Sudbury |
New Supply Point |
2004-Q3
|
Complete |
Report
|
| 2003-EX173 |
GREAT LAKES POWER - TRANSMISSION |
Gartshore |
Gartshore TS |
Transmission |
2006-Q4
|
Complete |
Report
|
| 2003-EX172 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Various |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX171 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Cherrywood |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2003-EX170 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Various |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX169 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Various |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX168 |
WEST WINDSOR POWER |
WEST WINDSOR POWER |
Windsor |
Non-Impactive New Equipment |
2004-Q4
|
Complete |
Report
|
| 2003-EX167 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Red Lake |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2003-EX166 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Trout Lake |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2003-EX165 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Highbury TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2003-EX164 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kent TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2003-EX163 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Thorton TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2003-EX162 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Beck GS #2 |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2003-EX161 |
GREAT LAKES POWER - TRANSMISSION |
Gartshore #2 cct |
Gartshore Transmission |
Transmission |
2004-Q4
|
Complete |
Report
|
| 2003-EX160 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Ottawa Area - H9A |
Transmission |
2004-Q4
|
Complete |
Report
|
| 2003-EX159 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Stayner TS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX158 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Dymond TS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX157 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hawthorne TS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX156 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Beck 2 GS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2003-EX155 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Richview TS |
Protection Modifications |
2004-Q4
|
Complete |
Report
|
| 2003-EX154 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Beach TS |
Protection Modifications |
2004-Q4
|
Complete |
Report
|
| 2003-EX153 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby W TS |
Protection Modifications |
2004-Q4
|
Complete |
Report
|
| 2003-EX152 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Modeland TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2003-EX151 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Merivale TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2003-EX150 |
TRANSALTA ENERGY CORPORATION |
Sarnia - Special Protection System |
Sarnia |
Special Protection System |
2003-Q3
|
Complete |
Report
|
| 2003-EX149 |
MARKHAM HYDRO DISTRIBUTION INC. |
MARKHAM HYDRO |
Markham MTS #1 |
Low Voltage Reactive Compensation |
2003-Q4
|
Complete |
Report
|
| 2003-EX148 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Ottawa Area |
Transmission |
2004-Q2
|
Complete |
Report
|
| 2003-EX147 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby T4 |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX146 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Tilsonburg TS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2003-EX145 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
London Clarke TS |
Additional Load |
2003-Q4
|
Complete |
Report
|
| 2003-EX144 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Essex TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2003-EX143 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Detweiler TS |
Transmission |
2007-Q2
|
Withdrawn |
|
| 2003-EX142 |
ENBRIDGE PIPELINES INC. |
ENBRIDGE |
North Westover |
Non-Impactive New Equipment |
2004-Q1
|
Complete |
Report
|
| 2003-EX141 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Leaside |
Reactive Compensation |
2005-Q2
|
Complete |
Report
|
| 2003-EX140 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
NW Ontarioario |
Non-Impactive New Equipment |
2003-Q3
|
Complete |
Report
|
| 2003-EX139 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Halton TS |
Low Voltage Feeder Breaker |
2004-Q2
|
Complete |
Report
|
| 2003-EX138 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Wiltshire TS |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2003-EX137 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kleinburg TS |
Low Voltage Feeder Breaker |
2004-Q2
|
Complete |
Report
|
| 2003-EX136 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
NE Ontarioario |
Retirement of Facilities |
|
Complete |
Report
|
| 2003-EX135 |
HYDRO ONE NETWORKS INC. |
Replacement of Equipment at Hearst TS |
Hearst TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2003-EX134 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Burlington TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2003-EX132 |
MARKHAM HYDRO DISTRIBUTION INC. |
MARKHAM HYDRO |
Markham MTS #3 |
Low Voltage Reactive Compensation |
2003-Q4
|
Complete |
Report
|
| 2003-EX131 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Falconbridge |
Modified Connection |
2003-Q2
|
Complete |
Report
|
| 2003-EX130 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Midhurst TS |
Modified Connection |
2004-Q4
|
Complete |
Report
|
| 2003-EX129 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lambton TS |
Modified Connection |
2003-Q3
|
Complete |
Report
|
| 2003-EX128 |
WEYERHAEUSER COMPANY LIMITED |
WEYERHAEUSER Project |
Dryden Mill |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2003-EX127 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Pine Portage GS |
Replacement of Generator Controls |
2003-Q2
|
Complete |
Report
|
| 2003-EX126 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Leaside TS |
Modified Connection |
2003-Q4
|
Complete |
Report
|
| 2003-EX125 |
KIMBERLY CLARK INC. |
TERRACE BAY MILL |
Terrace Bay |
Modified Connection |
2003-Q2
|
Complete |
Report
|
| 2003-EX124 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Detweiler TS |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2003-EX123 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Burlington TS |
Reactive Compensation |
2004-Q2
|
Complete |
Report
|
| 2003-EX122 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Crystal Falls GS |
Like for Like |
2003-Q1
|
Complete |
Report
|
| 2003-EX121 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Fort Williams TS |
Non-Impactive New Equipment |
2003-Q3
|
Complete |
Report
|
| 2003-EX120 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Barrett Chute SS |
Non-Impactive New Equipment |
2003-Q1
|
Complete |
Report
|
| 2002-EX119 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Strachan TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX118 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Richview TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX117 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX116 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Leaside TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX115 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kenilowrth TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX114 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Albion TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX113 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Porcupine TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX112 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Highbury TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX111 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Mohawk TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX110 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Runnymede TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX109 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Merivale TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX108 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Sidney TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX107 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Porcupine TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX106 |
HYDRO ONE NETWORKS INC. |
Hearn Demerger |
Hearn |
Modified Connection |
2003-Q2
|
Withdrawn |
|
| 2002-EX105 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hearst TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX104 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Fairchild TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX103 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Goderich TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX102 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Strachan TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2002-EX101 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kenilworth TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2002-EX100 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2002-EX099 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Albion TS |
Protection Modifications |
2003-Q4
|
Complete |
Report
|
| 2002-EX098 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Scott TS |
Like for Like |
2003-Q2
|
Complete |
Report
|
| 2002-EX097 |
INCO LIMITED, ONTARIO DIVISION |
INCO |
Inco No. 4 substation |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX096 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Martindale |
Non-Impactive New Equipment |
2002-Q4
|
Complete |
Report
|
| 2002-EX095 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Coniston TS |
Non-Impactive New Equipment |
2003-Q1
|
Complete |
Report
|
| 2002-EX094 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Chats Falls GS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX093 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Palmerston TS |
Protection Modifications |
2002-Q4
|
Complete |
Report
|
| 2002-EX092 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Sheppard TS |
Protection Modifications |
2002-Q4
|
Complete |
Report
|
| 2002-EX091 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lambton TS |
Protection Modifications |
2002-Q4
|
Complete |
Report
|
| 2002-EX090 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Bridgman TS |
Protection Modifications |
2002-Q4
|
Complete |
Report
|
| 2002-EX089 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Bermondsey TS |
Protection Modifications |
2003-Q1
|
Complete |
Report
|
| 2002-EX088 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
St. Marys TS |
Low Voltage Feeder Breaker |
2003-Q4
|
Complete |
Report
|
| 2002-EX087 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Toronto - Runnymede TS |
Like for Like |
2003-Q1
|
Complete |
Report
|
| 2002-EX086 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Richview TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX085 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX084 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Main TS |
Like for Like |
2003-Q1
|
Complete |
Report
|
| 2002-EX083 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Leaside TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX082 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Bilberry TS |
Like for Like |
2003-Q1
|
Complete |
Report
|
| 2002-EX081 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
John TS |
Protection Modifications |
2003-Q1
|
Complete |
Report
|
| 2002-EX080 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Wawa TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX079 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
St. Thomas TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX078 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Riverdale TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX077 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Owen Sound TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX076 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Algoma Ts |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX075 |
MISSISSAGI POWER TRUST |
MISSISSAGI Power Trust |
Wells GS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX074 |
GREAT LAKES POWER - TRANSMISSION |
MacKay TS G/R |
MacKay TS |
Protection Modifications |
2002-Q4
|
Complete |
Report
|
| 2002-EX073 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hawthorne TS |
Like for Like |
2004-Q4
|
Complete |
Report
|
| 2002-EX072 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Mountain Chute - Chenaux |
Special Protection System |
2003-Q4
|
Complete |
Report
|
| 2002-EX071 |
ENBRIDGE PIPELINES INC. |
ENBRIDGE Pipelines |
Cardinal |
Non-Impactive New Equipment |
2003-Q1
|
Complete |
Report
|
| 2002-EX070 |
HYDRO ONE NETWORKS INC. |
Add 115 kV circuit A12N |
Simcoe |
Transmission |
2009-Q2
|
Complete |
Report
|
| 2002-EX069 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Windsor Crawford TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX068 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
St. Marys TS |
Like for Like |
2003-Q3
|
Complete |
Report
|
| 2002-EX067 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Pickering A |
Like for Like |
2004-Q2
|
Complete |
Report
|
| 2002-EX066 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Glengrove TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX065 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lakeview TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX064 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kenilworth TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX063 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Essa TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX062 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Dobbin TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX061 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Chesterville TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX060 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Beach TS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX059 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Ramore TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX058 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Norfolk TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX057 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Beck #2 GS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX056 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Burlington TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX055 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Little Long GS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX054 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Buchanan TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX053 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Martindale TS |
New Breakers |
2002-Q4
|
Complete |
Report
|
| 2002-EX052 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
St. Andrews TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX051 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS |
Third Line TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX050 |
GREAT LAKES POWER - TRANSMISSION |
MacKay TS |
MacKay TS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX049 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Glengrove TS |
Like for Like |
2003-Q4
|
Complete |
Report
|
| 2002-EX048 |
CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. |
CAMBRIDGE Hydro |
Preston TS |
Non-Impactive New Equipment |
2002-Q3
|
Complete |
Report
|
| 2002-EX047 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Stewartville GS |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX046 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Bronte TS |
Low Voltage Feeder Breaker |
2003-Q3
|
Complete |
Report
|
| 2002-EX045 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Fairchild |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX044 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Elgin TS |
Modified Connection |
2002-Q3
|
Complete |
Report
|
| 2002-EX043 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Leaside TS |
Reactive Compensation |
2004-Q2
|
Complete |
Report
|
| 2002-EX042 |
INCO LIMITED, ONTARIO DIVISION |
INCO |
Port Colborne |
New Breakers |
2002-Q3
|
Complete |
Report
|
| 2002-EX041 |
GENERAL MOTORS OF CANADA LTD. |
GENERAL MOTERS |
St. Catharines |
Retirement of Facilities |
2002-Q3
|
Complete |
Report
|
| 2002-EX040 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Murray TS |
Low Voltage Feeder Breaker |
2003-Q2
|
Complete |
Report
|
| 2002-EX039 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Mackenzie TS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX038 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Fort Frances TS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX037 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lincoln Heights TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX036 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Russell TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX035 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Russell TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX034 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Pickering A |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX033 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Sidney TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX032 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Detweiler TS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX031 |
ONTARIO POWER GENERATION - HYDRO |
OPGI |
DeCew GS |
Like for Like |
2003-Q1
|
Complete |
Report
|
| 2002-EX030 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lakeview SS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX029 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hearn TGS |
Retirement of Facilities |
2002-Q2
|
Complete |
Report
|
| 2002-EX028 |
INCO LIMITED, ONTARIO DIVISION |
INCO |
Copper Cliff |
Temporary Connections |
2002-Q2
|
Complete |
Report
|
| 2002-EX027 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Milltown Jct. |
Like for Like |
2002-Q3
|
Complete |
Report
|
| 2002-EX026 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
National Research TS |
Low Voltage Feeder Breaker |
2002-Q4
|
Complete |
Report
|
| 2002-EX025 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Martindale |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX024 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Detweiler TS |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2002-EX023 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hearn TGS |
Retirement of Facilities |
2002-Q2
|
Complete |
Report
|
| 2002-EX022 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hearn TGS |
Reactive Compensation |
2003-Q2
|
Complete |
Report
|
| 2002-EX021 |
CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. |
CAMBRIDGE Hydro |
Galt TS |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2002-EX020 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Port Hope TS & Sidney TS |
Special Protection System |
2003-Q2
|
Complete |
Report
|
| 2002-EX019 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Clarke TS, Oakville TS, Centralia TS, Strathroy TS |
Low Voltage Reactive Compensation |
2002-Q4
|
Complete |
Report
|
| 2002-EX018 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Fort William TS |
Low Voltage Reactive Compensation |
2002-Q1
|
Complete |
Report
|
| 2002-EX017 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Nanticoke |
Generator Upgrades |
2003-Q3
|
Complete |
Report
|
| 2002-EX016 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Sheppard TS |
Low Voltage Feeder Breaker |
2002-Q2
|
Complete |
Report
|
| 2002-EX015 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Nanticoke |
Replacement of Generator Controls |
2003-Q4
|
Complete |
Report
|
| 2001-EX014 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Kenora TS |
Transmission |
2002-Q3
|
Complete |
Report
|
| 2001-EX012 |
ONTARIO POWER GENERATION - HYDRO |
SCR |
Lambton |
Selective Catalytic Reduction |
2002-Q2
|
Complete |
Report
|
| 2001-EX011 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Allanburg TS |
Transmission |
2002-Q4
|
Complete |
Report
|
| 2001-EX010 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Cyrville Jct. |
Like for Like |
2002-Q4
|
Complete |
Report
|
| 2001-EX009 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Q6S |
Transmission |
2002-Q2
|
Complete |
Report
|
| 2001-EX008 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Ottawa Area |
Load Transfer |
2001-Q4
|
Complete |
Report
|
| 2001-EX007 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Lennox TS |
Protection Modifications |
2001-Q4
|
Complete |
Report
|
| 2001-EX006 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Chenaux TS |
New Breakers |
2003-Q3
|
Complete |
Report
|
| 2001-EX005 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Cobden TS |
Low Voltage Feeder Breaker |
2002-Q3
|
Complete |
Report
|
| 2001-EX004 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Lambton |
Like for Like |
2001-Q4
|
Complete |
Report
|
| 2001-EX003 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Manby TS |
Like for Like |
2001-Q4
|
Complete |
Report
|
| 2001-EX002 |
ABITIBI-CONSOLIDATED COMPANY OF CANADA |
ABITIBI Consolidated |
Calm Lake |
Like for Like |
2002-Q2
|
Complete |
Report
|
| 2001-EX001 |
ENBRIDGE PIPELINES INC. |
ENBRIDGE |
Hilton |
Like for Like |
2001-Q3
|
Complete |
Report
|