Status of System Impact Assessment Applications received after April 30, 2005

This list provides the status of all transmission, load, generation and ancillary services connection proposals that have submitted an SIA application after April 30, 2005 and subsequently executed an SIA agreement. Queuing principles are still applicable to these proposals.

The following are the possible states of the status column:
  • "Complete" indicates that reports are available for viewing.
  • "Active" indicates that work is in progress.
  • "On Hold" indicates that the assessment was placed on hold because the projects has been delayed.
  • "Not Required" indicates that a System Impact Assessment is not required.
  • "By HONI" indicates that an assessment of the Project was conducted by Hydro One Networks Inc. (HONI) prior to the enactment of the applicable Market Rules, and has been accepted in lieu of Preliminary Assessment.
Last Updated: May 1, 2012
CAA ID Proponent Project Name Location Project Type Project Size Proposed In-Service Date System Impact Assessment Report
2012-470 OSISKO MINING CORPORATION Osisko Hammond Gold Project Atikokan Additional Load -
Active  
2012-468 HYDRO ONE NETWORKS INC. St. Columban 1 Wind Energy Seaforth New Generation 18 MW
Q4-2013
Active  
2012-467 HYDRO ONE NETWORKS INC. St. Columban 2 Wind Energy Seaforth, Ontario New Generation 15 MW
Q4-2013
Active  
2012-462 HYDRO ONE NETWORKS INC. Build new Clarington TS Clarington New Supply Point - Q2-2015
Active  
2011-461 ATOMIC ENERGY CANADA LTD. CRNL Class IV Power Upgradaes Chalk River Nuclear Labs New Supply Point -
Active  
2011-454 HYDRO ONE NETWORKS INC. Nebo TS Increase of Capacity Nebo TS Additional Load - Q4-2013
Complete Final Report
2011-445 SUNCOR ENERGY INC. Cedar Point Wind Project Forest, ON - B563L New Generation 100 MW

Active  
2011-432 CARDINAL POWER OF CANADA L.P. 15 MW Plant Expansion at Cardinal Cardinal, ON New Generation 15 MW
Q3-2013
Complete Final Report
2011-431 NORTHLAND POWER INC. Redpath CHP Toronto, ON New Generation 45 MW
Q2-2013
Complete Final Report
2011-428 NORTH AMERICAN PALLADIUM Offset Zone Development Lac Des Iles Mine Additional Load 6 MW
Under Construction
Complete Final Report
2011-426 HYDRO ONE NETWORKS INC. Pukwis Community Wind Park Georgina Island, Sutton West, ON New Generation 20 MW
-
Withdrawn Final Report
2011-425 LAKE SHORE GOLD - BELL CREEK COMPLEX LSG Bell Creek Complex Expansion Porcupine, Ontario New Supply Point 40 MW
Q2-2012
Complete Final Report

2010-420 DOMTAR PULP AND PAPER INC. Green Transformation Prog., Topping Turbogen proje Dryden, ON New Generation 10 MW
Q4-2011
Complete Final Report
2010-419 GOLDCORP CANADA LTD. Musselwhite Mine - Esker Ear Falls Area New Supply Point - In-Service
Complete Report
2010-418 HYDRO ONE NETWORKS INC. Tremaine TS Burlington at Tremaine Rd New Supply Point - Q1-2013
Complete Final Report
2010-417 HYDRO ONE NETWORKS INC. Add transformer at Red Lake TS Red Lake TS Additional Load - -
Withdrawn  
2010-416 NOVA CHEMICALS 104430 Long Term Viability Project Mooretown, ON Additional Load - Q3-2010
Complete Final Report
2010-411 HYDRO OTTAWA LIMITED New T2 at Fallowfield DS 1010 Moody Drive Modified Connection - Q2-2012
Complete Final Report
2010-410 KIRKLAND LAKE GOLD INC. KL Gold Power Supply System Kirkland Lake, ON - Macassa Shaft#3 New Supply Point 7.629 MW
In-Service
Complete Final Report
2010-407 GOLDCORP CANADA LTD. RLGM Supply System Expansion Red Lake, NW Ontarioario New Supply Point & Transmission -
Active  
2010-404 CANADIAN SOLAR Liskeard Projects Timiskaming Shores, Ontario Generation - Solar 30 MW
Q1-2013
Complete Final Report
2010-380 DETOUR GOLD CORPORATION Detour Lake Project - 115 kV connection Northeastern Ontario New Supply Point & Transmission - Q2-2011
Complete Final Report
Appendix 1
2010-379 HYDRO OTTAWA LIMITED Terry Fox MTS 330 Michael Cowpland Dr. Ottawa New Supply Point - Q2-2013
Active  
2010-378 HYDRO ONE NETWORKS INC. Barwick TS near the town of Chapple New Supply Point & Transmission - Q4-2012
Complete Final Report
2010-377 TRANSCANADA ENERGY LTD. OAKVILLE GS OAKVILLE New Generation - -
Withdrawn  
2010-376 GUELPH HYDRO ELECTRIC SYSTEMS INC. Guelph Hydro MTS #1 Guelph New Supply Point - Q4-2011
Complete Final Report
2009-374 OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. Oakville Hydro MTS#1 Between Palermo TS & Trafalgar TS New Supply Point - Q2-2011
Complete Final Report
2009-372 BARRICK GOLD CORP - WILLIAMS MINE 115 kV line relocation at Williams Mine Williams Mine CTS Transmission Upgrades - Q4-2009
Complete Final Report
2009-368 HYDRO ONE NETWORKS INC. Northwest Transmission Expansion Nipigon-Pickle lake Transmission -
Active  
2009-367 BECKER GENERATION Becker Co Generation Haig Township, District of Algoma New Generation 15.63 MW
Q2-2011
Part 1 SIA Comp  
2009-366 HYDRO ONE NETWORKS INC. Pinard TS New 115 kV Switching Stn Pinard TS New Supply Point - Q3-2013
Complete Final Report
2009-364 KITCHENER-WILMOT HYDRO INC. Kitchener MTS #9 1805 Wilmot Center Rd., Baden, Twnshp of Wilmot New Supply Point 79.1 MW
Q3-2010
Complete Final Report
2009-363 REGIONAL MUNICIPALITY OF DURHAM Clarington #1 Clarington, Ontario New Generation 20 MW
Q2-2013
Active  
2009-362 JUNGBLUNZAUER CANADA INC. 115 kV SUPPLY 1555 Elm St., Port Colborne, Ontario Modified Connection - Q3-2012
Complete Final Report
2009-359 DETOUR GOLD CORPORATION Detour Lake Project - 230 kV connection Northeastern Ontarioario Small Non-Impactive Load 95 MW
Q4-2012
Complete Final Report
Appendix 1
2009-357 HYDRO OTTAWA LIMITED Ellwood MTS Ellwood MTS New Supply Point & Transmission - Q2-2010
Complete Final Report
2009-356 ONTARIO POWER GENERATION - HYDRO Beck #1 G9 Rehabilitation Sir Adam Beck #1 GS New Generation 61.6 MW
In-Service
Complete Final Report
2009-355 GREAT LAKES POWER - TRANSMISSION Third Line TS 115 kV Refurbishment Sault Ste. Marie Modified Connection - In-Service
Complete Final Report
2008-354 WINDSTREAM WOLF ISLAND SHOALS INC. Wolf Island Shoals Part B Offshore on Lake Ontarioario near Wolf Island New Generation 200
-
Withdrawn  
2008-353 WINDSTREAM WOLF ISLAND SHOALS INC. Wolf Island Shoals Part A Offshore on Lake Ontarioario near Wolf Island New Generation 64
-
Withdrawn  
2008-352 HYDRO ONE NETWORKS INC. Northern Ontario Shunt Cap Banks Northern Ontarioario Reactive Compensation - Q3-2011
Complete Final Report
Addendum 1
2008-351 CITY POWER COGEN L.P. City Power Cogen 110 Progress Ave., Scarborough, ON New Generation 50 MW

Part 1 SIA Comp  
2008-349 AIM POWERGEN CORPORATION Erie Shores II Wind Farm Tilsonburg New Generation 50 MW
-
Withdrawn  
2008-347 NORTHLAND POWER INC. 85 MW Macleans Mountain Wind Farm Manitoulin Island New Generation 85 MW
-
Withdrawn  
2008-346 HYDRO ONE NETWORKS INC. Nanticoke and Detweiler SVC Installations Nanticoke GS and Detweiler TS Reactive Compensation 350 MVAR
Q1-2011
Complete Final Report
Addendum 1
2008-342 KRUGER INC. Kruger Energy Peninsula Wind Town of Marathon New Generation 25.3 MVA
Q4-2010
Part 1 SIA Comp  
2008-341 WINDLECTRIC INC. Amherst Island Wind Amherst Island New Generation 200 MW
-
Withdrawn  
2008-340 IPC ENERGY White Pines Wind Farm Prince Edwards County New Generation 64 MW
-
Withdrawn  
2008-339 JUWI SOLAR INC. Greenbelt Solar Bradford West Gwillimbury Generation - Solar 50 MW
-
Withdrawn  
2008-338 CANADIAN HYDRO DEVELOPERS INC. Parkhill Wind Project North Middlesex New Generation 34.5 MW
Q3-2012
Part 1 SIA Comp  
2008-337 RENEWABLE ENERGY SYSTEMS CANADA INC. Greenwich Lake Wind Farm west of Dorion, ON New Generation 99 MW
In-Service
Complete Final Report
2008-336 RENEWABLE ENERGY SYSTEMS CANADA INC. Whitney Wind Farm near Madawaska, ON New Generation 49 MW
Q3-2010
Part 1 SIA Comp  
2008-335 RENEWABLE ENERGY SYSTEMS CANADA INC. Talbot Wind Farm near Ridgetown, ON New Generation 99 MW
In-Service
Complete Final Report
2008-334 IPC ENERGY Sydenham Wind Farm Twshp of Dawn-Euphemia, Lambton Cty Chatham-Kent New Generation 64
-
Withdrawn  
2008-333 NORTHLAND POWER INC. Northland GM Cogeneration Project Park Rd. South, Oshawa, ON New Generation 105 MW
210 MW
Q2-2013
Q2-2013
Complete Final Report
2008-332 HYDRO ONE NETWORKS INC. Tilbury West DS Second 115 kV Connection Township of Tilbury West, Essex County New Supply Point & Transmission - Q2-2010
Active Final Draft Report
2008-331 TWENTY TWO DEGREE ENERGY CORPORATION Twenty Two Degree Energy Holmesville, Central Huron, County of Huron New Generation 200 MW

Part 1 SIA Comp  
2008-329 BRAMPTON COGENERATION INC. New 15MW CHP Project 7656 Bramelea Road New Generation 24.325 MVA
Q3-2010
Part 1 SIA Comp  
2008-326 AIR ENERGY TCI INC. (TCI RENEWABLES) Nanticoke Wind Energy Project East of Nanticoke, ON New Generation 80 MW
-
Withdrawn  
2008-325 BOWARK ENERGY LTD. Kent Centre Wind Farm Chatham-Kent; Harwich; Howard & Raleigh townships New Generation 150 MW
-
Withdrawn  
2008-324 ST. MARYS RENEWABLE ENERGY CORP. St. Marys Renewable Energy Centre Sault Ste. Marie, ON, P6A 5P4 New Generation 35.3 MVA
Q3-2011
Part 1 SIA Comp  
2008-323 TORONTO HYDRO ENERGY SERVICES INC. City Power Solution - Molson 1 Carlingview Dr., Toronto, ON New Generation 56.3 MVA
14.85 MVA
Q4-2012
Q4-2012
Part 1 SIA Comp  
2008-322 TRANSCANADA CORPORATION Belwood Wind Power Orangeville New Generation 48 MW
-
Withdrawn  
2008-321 TRANSCANADA CORPORATION Romney Wind Project Chatham & Kent (S of Tilbury) New Generation 172.5 MW
-
Withdrawn  
2008-320 POWERSTREAM INC. Markham MTS#4 NW corner of Rodick Rd & Hwy 407, Markham, ON New Supply Point - Q2-2010
Complete Final Report
2008-319 CANADIAN SHIELD WIND POWER-DIV OF PTERAGEN CANADA Garson Wind Farm Comm. of Garson-Municipality of Greater Sudbury New Generation 100 MW
Q3-2012
Part 1 SIA Comp  
2008-318 HYDRO ONE NETWORKS INC. Windsor Area Transmission Reinforcement Municipality of Windsor and Essex County Transmission 166.6 MVA
Q4-2012
Complete Final Draft Report
2008-316 INDEX ENERGY CORPORATION Index Energy Whitby TS #1 New Generation 18.75 MVA
-
Withdrawn  
2008-315 BROOKFIELD RENEWABLE POWER INC. Iron Bridge GS Algoma x Mississagi Area New Generation 10 MW
-
Withdrawn  
2008-314 GENGROUTH MERLIN L.P. Merlin Wind Buxton Farm Chatham-Kent, Near Town of Merlin New Generation 99 MW
Q1-2010
Part 1 SIA Comp  
2008-312 NORTHGATE MINERALS CORPORATION Young-Davidson Project Matachewan, ON New Supply Point - In-Service
Complete Final Report
Appendix 1
2008-310 SUN COKE INTERNATIONAL Erie Ontario Coke Company CGS (Erie OCC CGS) Nanticoke, ON New Generation 154 MVA
Q1-2011
Part 1 SIA Comp  
2008-309 RICHVIEW RESOURCES INC. Thierry Mine Development Pickle Lake, ON New Supply Point 9 MW
Q4-2010
Complete Final Report
2008-307 WINDSTREAM TEMAGAMI INC. Friday Lake Wind Farm Temagami, ON New Generation 100 MW
-
Withdrawn  
2008-304 WINDSTREAM ELK LAKE INC. Gowganda/Elk Lake Wind Farm Elk Lake, ON New Generation 500 MW
-
Withdrawn  
2008-302 ENBRIDGE INC. Saugeen Shores Wind Farm Town of Saugeen Shores, ON New Generation 49.5 MW
Q4-2011
On-Hold  
2008-301 ENBRIDGE INC. Kincardine II Wind Farm Municipality of Kincardine, ON New Generation 99 MW
Q4-2011
On-Hold  
2008-298 HYDRO ONE NETWORKS INC. Woodstock E. TS:Build 50/83MVA,115-27.6kV Trans St Vicinity of the Toyota Woodstock Plant New Supply Point & Transmission 117 MVA
Q2-2010
Active Final Draft Report
2008-297 ACCIONA WIND ENERGY CANADA INC. Merlin-Quinn Wind Power Project Chatham-Kent Area, South-Western Ontarioario New Generation 76 MW
-
Withdrawn  
2008-296 HORIZON HYDRO INC. Trout Lake River Township of Gery, On, Canada New Generation 5 MW
-
Withdrawn  
2007-295 HYDRO ONE NETWORKS INC. Install 7 Cap Banks-SWO-OPA NearTerm Measure Bruce Buchanan TS, Middleport TS, Nanticoke TS Reactive Compensation 1700 MVAR
Q2-2009
Active Final Draft Report
2007-294 ONTARIO POWER GENERATION - HYDRO New Post Creek GS Township of Pinard, District of Cochrane New Generation 28 MVA
Q4-2012
Complete Final Report
2007-293 AIR ENERGY TCI INC. (TCI RENEWABLES) Adelaide Wind Energy Project Vicinity of Adelaide, Adelaide-Metcalfe, ON New Generation 74 MW
-
Withdrawn  
2007-292 SKYPOWER CORP. Hardwood Hills Near Foymount, South of Lake Clear New Generation 49.5 MW

Part 1 SIA Comp  
2007-290 AIRTRICITY CANADA LTD. Dover Centre Wind Farm Chatham-Kent, Municipality New Generation 100 MW
-
Withdrawn  
2007-289 AIM POWERGEN CORPORATION Pointe Aux Roches (South Lake St. Clair) Wind Farm Essex County Near the Town of Tilbury New Generation 40 MW
-
Withdrawn  
2007-288 AIM POWERGEN CORPORATION ERIEAU Wind Farm County of Chatham-Kent Near the Town of Blenheim New Generation 99 MW
-
Withdrawn  
2007-287 AIM POWERGEN CORPORATION East Lake St. Clair Wind Farm County of Chatham-Kent north of Chatham New Generation 99 MW
-
Withdrawn  
2007-286 SKYPOWER CORP. Parry Island Wind Farm Parry Island, ON New Generation 150 MW

Part 1 SIA Comp  
2007-285 4444388 CANADA INC. NAMEWAMINIKAN Hydro Project Beardmore, ON New Generation 10 MW
-
Withdrawn Final Report
2007-284 TERRACE BAY PULP INC. STG2 Terrace Bay, ON New Generation 29.5 MVA
Q2-2008
Complete Final Report
2007-283 CPV CANADA DEVELOPMENTS INC. Nanticoke Energy Center 768 Haldimand Rd 55, Jarvis, ON, Lot7, Conces New Generation 1758 MVA
N/A
Active  
2007-282 KABINAKAGAMI POWER L.P. Kabinakagami Stns 1-6 (6x9.9MW stns connect 115kV Kabinakagami River north Hwy 11, south Roger's Rd New Generation 60 MW
-
Withdrawn  
2007-281 BUTTCON LTD. Windsor Energy Centre Windsor, ON New Generation 14 MW

Complete Final Report
2007-280 FPLE CANADIAN WIND, ULC Clarke-T Wind Farm Lambton and Middlesex Counties, ON New Generation 349.5 MW
-
Withdrawn  
2007-279 BROOKFIELD POWER Lower Lake Hydroelectric GS Aguasabon River New Generation 10 MW
-
Withdrawn Final Draft Report
2007-278 FPLE CANADIAN WIND, ULC Bornish Wind Farm Lambton County, ON New Generation 84 MW
-
Withdrawn  
2007-277 FPLE CANADIAN WIND, ULC Seaforth-T Wind Farm Huron County, ON New Generation 87 MW
-
Withdrawn  
2007-276 FPLE CANADIAN WIND, ULC Jericho Wind Farm Lambton County, ON New Generation 249 MW
-
Withdrawn  
2007-275 FPLE CANADIAN WIND, ULC Centralia-T Wind Farm Huron County, ON New Generation 63 MW
-
Withdrawn  
2007-274 BROOKFIELD WIND POWER CORPORATION Madawaska Wind Park Near Madawas-Vicinity of Wallance TS, Eastern ON New Generation 199.5 MW
N/A
Active  
2007-273 BROOKFIELD WIND POWER CORPORATION Renfrew Wind Park Renfrew Area-Vicinity of Mount Chute GS, East ON New Generation 99 MW
N/A
Active  
2007-272 CPV CANADA DEVELOPMENTS INC. North Dumfries Energy Center 2384 Dundas Road South, Cambridge, ON New Generation 500 MVA
N/A
Active  
2007-270 WIKWEMIKONG UNCEDED INDIAN RESERVE Wikwemikong Wind Generation Facility - Site A Wikwemikong, ON New Generation 124 MW
-
Withdrawn  
2007-269 HYDRO ONE NETWORKS INC. Embedded Generation Study - Multiple Stations Multiple Stations New Generation -
Complete Draft Report
2007-268 RALEIGH WIND POWER PARTNERSHIP Raleigh Wind Energy Centre North Kent - Chatham Kent Area New Generation 78 MW
In-Service
Complete Final Report
Addendum 1
2007-267 DOVER WIND POWER PARTNERSHIP Dover Wind Energy Centre North Kent - Chatham Kent Area New Generation 40 MW
-
Withdrawn  
2007-266 ONTARIO POWER GENERATION - HYDRO Mattagami Lake Dam Development Geographic Township of Gouin, District of Sudbury New Generation 5.6 MVA
Q4-2010
Complete Final Report
2007-265 HYDRO ONE NETWORKS INC. Replace Keith 230/115 kV Autotransformers T11&T12 Keith TS Transmission Upgrades 500 MVA
Q1-2010
Complete Final Draft Report
2007-264 HYDRO ONE NETWORKS INC. Goreway TS-Build New 230/28-28kV, 75/125 MVA DESN 9513 Goreway Dr, Brampton (at existing Goreway TS) New Supply Point 175 MVA
Q2-2010
Active Final Draft Report
2007-263 HYDRO ONE NETWORKS INC. Windsor Area Transmission Reinforcement Municipality of Windsor and Essex County Transmission 500 MVA
-
Withdrawn Final Draft Report
2007-262 HYDRO ONE NETWORKS INC. Mississagi Area Generation Rejection Scheme Expans Mississagi Area Special Protection System - Q3-2009
Active  
2007-261 FORT CHICAGO DISTRICT ENERGY LTD. Fort Chicago London District Energy Plant London, ON New Generation 22 MVA
In-Service
Complete Final Report
2007-260 HYDRO ONE NETWORKS INC. Rodney TS - 25/41 MVA, 230-27.6 kV Aldborough Twp, County of Chatham-Kent New Supply Point 57 MVA
Q4-2011
Complete Final Draft Report
Addendum 1
2007-259 LAKESHORE GOLD CORP. Timmins West Mine CTS Timmins (Hwy 101 W & 144) Additional Load - Q3-2007
Complete Report
2007-258 HYDRO ONE NETWORKS INC. Vansickle TS - Replace transformers City of St. Catherine Transmission - Q1-2011
Active Final Draft Report
2007-257 HYDRO ONE NETWORKS INC. St. Catherines 115 kV Circuit Upgrade St. Catherines Area Transmission - Q4-2009
Active Final Draft Report
2007-255 SOAVE HYDROPONICS COMPANY Great Northern Tri-Gen Facility 1400 Rd. 3 East, Kingsville, ON New Generation 12 MW
In-Service
Active Final Draft Report
2007-254 ONTARIO POWER GENERATION - HYDRO Lakeview Power Mississauga New Generation 900 MW
Q1-2011
Active  
2006-253 HYDRO ONE NETWORKS INC. Woodstock Area Transmission Reinforcement Woodstock, ON Transmission - In-Service
Active Final Draft Report
Addendum 1
2006-252 ONTARIO POWER GENERATION - HYDRO Beck 1 G7 Conversion Beck 1 Generation Station New Generation 68.5 MVA
In-Service
Complete Final Report
Addendum 1
2006-251 TORONTO HYDRO-ELECTRIC SYSTEM LIMITED Enwave Energy Corp 11MW Emergency Generating Plant Metro Tor Conv Ctre & John Street Pumping Station New Generation 11 MW
In-Service
Complete Report
2006-250 HYDRO ONE NETWORKS INC. Transmission Out of Bruce Southwestern Ontarioario Transmission - Q4-2011
Active Final Draft Report
Diagrams
2006-248 HYDRO ONE NETWORKS INC. Build Two Circuits-Hurontario SS to Jim Yarrow MTS On the existing R21T/R19T, Plesant tap R-O-W Transmission - In-Service
Complete Final Draft Report
2006-246 HYDRO ONE NETWORKS INC. Terminate V77R at Richview TS Richview TS Transmission - Q2-2009
Complete
2006-245 HYDRO OTTAWA LIMITED Cyrville MTS Cyrville Road Ottawa New Supply Point - Q3-2008
Complete Final Report
2006-241 ONTARIO POWER GENERATION - HYDRO Upper Mattagami Redevelopment Twnp of Gillies Timber Limit, Dist of Temiskaming New Generation 44 MW

Complete Final Report
2006-240 TORONTO HYDRO ENERGY SERVICES INC. New Power Cogeneration Toronto, ON, Canada New Generation 30 MVA
-
Withdrawn  
2006-239 ONTARIO POWER GENERATION - HYDRO Lower Mattagami Dev - Smoky Falls GS Redevelopment 70km Northeast of Kapuskasing New Generation 441 MW
Q1-2012
Complete Final Report

2006-238 HYDRO ONE NETWORKS INC. Leaside TS x Bridgeman TS: Build 1x115kV Circuit Mid-town Toronto Transmission - Q2-2012
Complete Final Report
Post-SIA Report
2006-237 BROOKFIELD WIND POWER CORPORATION Spider Wind Park North of SSM, Twnp of Spider, Northern Ontarioario New Generation 150 MW
-
Withdrawn  
2006-236 BROOKFIELD WIND POWER CORPORATION Comber Wind Park Near the town of Comber, Southwestern Ontarioario New Generation 150 MW
-
Withdrawn  
2006-234 PRISTINE POWER INC. East Windsor Cogeneration Plant 1000 Henry Ford Centre Drive, Windsor, ON M9A 7E8 New Generation 99 MW
In-Service
Complete Report
Addendum 1
2006-233 HYDRO ONE NETWORKS INC. Detweiler 245Mvar,Orangeville 245Mvar Detweiler TS, Orangeville TS Reactive Compensation 245 MVAR
In-Service
Active Final Draft Report
2006-232 TRANSCANADA ENERGY LTD. Halton Hills Generating Station Town of Halton Hills (401 Industrial Corridor) New Generation 755 MVA
In-Service
Complete Final Report
2006-231 HYDRO ONE NETWORKS INC. Pleasant TS-Build New 230/28-28kV, 75/125MVA DESN North-West Brampton, ON New Supply Point - In-Service
Active Final Draft Report
2006-230 HYDRO ONE NETWORKS INC. Churchill Meadows TS - New 230/44kV,75/125MVA DESN Vicinity-Winston Churchill Blvd, North-West Miss New Supply Point - Q4-2010
Active Final Draft Report
2006-228 HYDRO ONE NETWORKS INC. Red Lake TS: Refurbish 115-44kV Trans Station Town of Red Lake Additional Load - In-Service
Complete Final Draft Report
2006-227 HYDRO ONE NETWORKS INC. Everett TS: New Transformer Station Township of Tosoronto-Cnty Road 5 & County Road 15 New Supply Point - In-Service
Active Final Draft Report
2006-226 NORTH AMERICAN PALLADIUM Underground Load Addition Lac Dec Iles Mine (90km north of Thunder Bay) Additional Load 10
Under Construction
Complete Final Report
2006-225 HYDRO ONE NETWORKS INC. Toyota Woodstock: Install Supply Facilities Woodstock, ON New Supply Point 41 MVA
In-Service
Active Final Draft Report
2006-224 HYDRO ONE NETWORKS INC. Hurontario SS & 230 kV transmission extended Milton-Claire 500kV ROW Intersects R21T/R19T Pleas Transmission - In-Service
Complete Final Report
Addendum 1
2006-223 HYDRO ONE NETWORKS INC. NE Transmission Expansion Porcupine TS, Kirkland Lake TS Reactive Compensation - Under Construction
Complete Final Report
Addendum 1
Addendum 2
Diagrams
2006-221 HYDRO ONE NETWORKS INC. New LV Shunt Capacitor-Meadowvale TS & Halton TS Meadowvale TS/Halton TS Low Voltage Reactive Compensation 21.6 MVAR
32.4 MVAR
Q4-2008
In-Service
Complete Report
2006-220 HYDRO ONE NETWORKS INC. Claireville TS Modification Claireville TS Transmission - Q4-2009
Complete Report
2006-216 REGIONAL POWER INC. White River Town of Mobert New Generation 11.11 MVA
9.44 MVA
-
-
Withdrawn Final Report
Final Report
2006-215 HYDRO ONE NETWORKS INC. Cambridge Preston TS-Add 250MVA, 230/115kV Auto Tr Cambridge Preston TS Transmission 250 MVA
Q4-2007
Active Final Draft Report
2006-214 ONTARIO POWER GENERATION - HYDRO Pickering Auxiliary Power Supply Pickering GS New Generation 76 MW
In-Service
Complete Report
2006-212 HYDRO ONE NETWORKS INC. 2nd DESN at Talbot TS Build 50/83 MVA, 230-27.6 kV Transformer Station New Supply Point 83 MVA
In-Service
Active Final Draft Report
2006-211 HYDRO ONE NETWORKS INC. Holland TS King Township or East Gwillimbury New Supply Point 75 MVA
175 MVA
In-Service
Q2-2009
Active Phase I Report
Phase II Final Draft Report
2006-209 HYDRO ONE NETWORKS INC. Enfield TS (Oshawa Area TS) Oshawa Area New Supply Point 250 MVA
Q2-2011
Active Final Draft Report
2005-208 HYDRO ONE NETWORKS INC. Manitoba-Ontario Inter Increase Firm Cap 400MW Kenora Interconnection 400 MW
N/A
On-Hold  
2005-207 FIVE NATIONS ENERGY INC. Energize Second Transformers at Fort Albany TS Fort Albany TS New Supply Point 20 MVA
Under Construction
Complete Report
2005-206 BARRINGTON WIND ENERGY LTD. Huron Pine River Project Concession A, 9 and 10; Huron-Kinloss Township New Generation 18 MW
-
Withdrawn  
2005-205 GREEN BREEZE Great Winds Central Huron Municipality, Huron County New Generation 79.5 MW
Q3-2007
On-Hold  
2005-204 VISION QUEST WINDELECTRIC Trillium Wind Farm Amberley, Bruce County & Ashfield, Huron Ontarioar New Generation 75 MW
-
Withdrawn  
2005-203 KRUGER INC. Kruger Wind Generation Station Port Alma New Generation 101 MW
In-Service
Complete Report
2005-202 POWERSTREAM INC. Greenwood TS Expansion 8000 Dufferin St., Vaughan, ON New Supply Point 175 MW
In-Service
Complete Report
2005-201 CANADIAN HYDRO DEVELOPERS INC. Amherst Island Windfarm Amherst Island New Generation 24 MW
-
Withdrawn  
2004-176 CANADIAN NIAGARA POWER 115 kV Interconnection (L5C) Cornwall, Eastern Ontarioario Transmission 150 MVAR
N/A
Complete Final Report
Addendum 1
 