| 2012-470 |
OSISKO MINING CORPORATION |
Osisko Hammond Gold Project |
Atikokan |
Additional Load |
- |
|
Active |
|
| 2012-468 |
HYDRO ONE NETWORKS INC. |
St. Columban 1 Wind Energy |
Seaforth |
New Generation |
18 MW
|
Q4-2013
|
Active |
|
| 2012-467 |
HYDRO ONE NETWORKS INC. |
St. Columban 2 Wind Energy |
Seaforth, Ontario |
New Generation |
15 MW
|
Q4-2013
|
Active |
|
| 2012-462 |
HYDRO ONE NETWORKS INC. |
Build new Clarington TS |
Clarington |
New Supply Point |
- |
Q2-2015
|
Active |
|
| 2011-461 |
ATOMIC ENERGY CANADA LTD. |
CRNL Class IV Power Upgradaes |
Chalk River Nuclear Labs |
New Supply Point |
- |
|
Active |
|
| 2011-454 |
HYDRO ONE NETWORKS INC. |
Nebo TS Increase of Capacity |
Nebo TS |
Additional Load |
- |
Q4-2013
|
Complete |
Final Report
|
| 2011-445 |
SUNCOR ENERGY INC. |
Cedar Point Wind Project |
Forest, ON - B563L |
New Generation |
100 MW
|
|
Active |
|
| 2011-432 |
CARDINAL POWER OF CANADA L.P. |
15 MW Plant Expansion at Cardinal |
Cardinal, ON |
New Generation |
15 MW
|
Q3-2013
|
Complete |
Final Report
|
| 2011-431 |
NORTHLAND POWER INC. |
Redpath CHP |
Toronto, ON |
New Generation |
45 MW
|
Q2-2013
|
Complete |
Final Report
|
| 2011-428 |
NORTH AMERICAN PALLADIUM |
Offset Zone Development |
Lac Des Iles Mine |
Additional Load |
6 MW
|
Under Construction
|
Complete |
Final Report
|
| 2011-426 |
HYDRO ONE NETWORKS INC. |
Pukwis Community Wind Park |
Georgina Island, Sutton West, ON |
New Generation |
20 MW
|
-
|
Withdrawn |
Final Report
|
| 2011-425 |
LAKE SHORE GOLD - BELL CREEK COMPLEX |
LSG Bell Creek Complex Expansion |
Porcupine, Ontario |
New Supply Point |
40 MW
|
Q2-2012
|
Complete |
Final Report
|
| 2010-420 |
DOMTAR PULP AND PAPER INC. |
Green Transformation Prog., Topping Turbogen proje |
Dryden, ON |
New Generation |
10 MW
|
Q4-2011
|
Complete |
Final Report
|
| 2010-419 |
GOLDCORP CANADA LTD. |
Musselwhite Mine - Esker |
Ear Falls Area |
New Supply Point |
- |
In-Service
|
Complete |
Report
|
| 2010-418 |
HYDRO ONE NETWORKS INC. |
Tremaine TS |
Burlington at Tremaine Rd |
New Supply Point |
- |
Q1-2013
|
Complete |
Final Report
|
| 2010-417 |
HYDRO ONE NETWORKS INC. |
Add transformer at Red Lake TS |
Red Lake TS |
Additional Load |
- |
-
|
Withdrawn |
|
| 2010-416 |
NOVA CHEMICALS 104430 |
Long Term Viability Project |
Mooretown, ON |
Additional Load |
- |
Q3-2010
|
Complete |
Final Report
|
| 2010-411 |
HYDRO OTTAWA LIMITED |
New T2 at Fallowfield DS |
1010 Moody Drive |
Modified Connection |
- |
Q2-2012
|
Complete |
Final Report
|
| 2010-410 |
KIRKLAND LAKE GOLD INC. |
KL Gold Power Supply System |
Kirkland Lake, ON - Macassa Shaft#3 |
New Supply Point |
7.629 MW
|
In-Service
|
Complete |
Final Report
|
| 2010-407 |
GOLDCORP CANADA LTD. |
RLGM Supply System Expansion |
Red Lake, NW Ontarioario |
New Supply Point & Transmission |
- |
|
Active |
|
| 2010-404 |
CANADIAN SOLAR |
Liskeard Projects |
Timiskaming Shores, Ontario |
Generation - Solar |
30 MW
|
Q1-2013
|
Complete |
Final Report
|
| 2010-380 |
DETOUR GOLD CORPORATION |
Detour Lake Project - 115 kV connection |
Northeastern Ontario |
New Supply Point & Transmission |
- |
Q2-2011
|
Complete |
Final Report Appendix 1
|
| 2010-379 |
HYDRO OTTAWA LIMITED |
Terry Fox MTS |
330 Michael Cowpland Dr. Ottawa |
New Supply Point |
- |
Q2-2013
|
Active |
|
| 2010-378 |
HYDRO ONE NETWORKS INC. |
Barwick TS |
near the town of Chapple |
New Supply Point & Transmission |
- |
Q4-2012
|
Complete |
Final Report
|
| 2010-377 |
TRANSCANADA ENERGY LTD. |
OAKVILLE GS |
OAKVILLE |
New Generation |
- |
-
|
Withdrawn |
|
| 2010-376 |
GUELPH HYDRO ELECTRIC SYSTEMS INC. |
Guelph Hydro MTS #1 |
Guelph |
New Supply Point |
- |
Q4-2011
|
Complete |
Final Report
|
| 2009-374 |
OAKVILLE HYDRO ELECTRICITY DISTRIBUTION INC. |
Oakville Hydro MTS#1 |
Between Palermo TS & Trafalgar TS |
New Supply Point |
- |
Q2-2011
|
Complete |
Final Report
|
| 2009-372 |
BARRICK GOLD CORP - WILLIAMS MINE |
115 kV line relocation at Williams Mine |
Williams Mine CTS |
Transmission Upgrades |
- |
Q4-2009
|
Complete |
Final Report
|
| 2009-368 |
HYDRO ONE NETWORKS INC. |
Northwest Transmission Expansion |
Nipigon-Pickle lake |
Transmission |
- |
|
Active |
|
| 2009-367 |
BECKER GENERATION |
Becker Co Generation |
Haig Township, District of Algoma |
New Generation |
15.63 MW
|
Q2-2011
|
Part 1 SIA Comp |
|
| 2009-366 |
HYDRO ONE NETWORKS INC. |
Pinard TS New 115 kV Switching Stn |
Pinard TS |
New Supply Point |
- |
Q3-2013
|
Complete |
Final Report
|
| 2009-364 |
KITCHENER-WILMOT HYDRO INC. |
Kitchener MTS #9 |
1805 Wilmot Center Rd., Baden, Twnshp of Wilmot |
New Supply Point |
79.1 MW
|
Q3-2010
|
Complete |
Final Report
|
| 2009-363 |
REGIONAL MUNICIPALITY OF DURHAM |
Clarington #1 |
Clarington, Ontario |
New Generation |
20 MW
|
Q2-2013
|
Active |
|
| 2009-362 |
JUNGBLUNZAUER CANADA INC. |
115 kV SUPPLY |
1555 Elm St., Port Colborne, Ontario |
Modified Connection |
- |
Q3-2012
|
Complete |
Final Report
|
| 2009-359 |
DETOUR GOLD CORPORATION |
Detour Lake Project - 230 kV connection |
Northeastern Ontarioario |
Small Non-Impactive Load |
95 MW
|
Q4-2012
|
Complete |
Final Report Appendix 1
|
| 2009-357 |
HYDRO OTTAWA LIMITED |
Ellwood MTS |
Ellwood MTS |
New Supply Point & Transmission |
- |
Q2-2010
|
Complete |
Final Report
|
| 2009-356 |
ONTARIO POWER GENERATION - HYDRO |
Beck #1 G9 Rehabilitation |
Sir Adam Beck #1 GS |
New Generation |
61.6 MW
|
In-Service
|
Complete |
Final Report
|
| 2009-355 |
GREAT LAKES POWER - TRANSMISSION |
Third Line TS 115 kV Refurbishment |
Sault Ste. Marie |
Modified Connection |
- |
In-Service
|
Complete |
Final Report
|
| 2008-354 |
WINDSTREAM WOLF ISLAND SHOALS INC. |
Wolf Island Shoals Part B |
Offshore on Lake Ontarioario near Wolf Island |
New Generation |
200
|
-
|
Withdrawn |
|
| 2008-353 |
WINDSTREAM WOLF ISLAND SHOALS INC. |
Wolf Island Shoals Part A |
Offshore on Lake Ontarioario near Wolf Island |
New Generation |
64
|
-
|
Withdrawn |
|
| 2008-352 |
HYDRO ONE NETWORKS INC. |
Northern Ontario Shunt Cap Banks |
Northern Ontarioario |
Reactive Compensation |
- |
Q3-2011
|
Complete |
Final Report Addendum 1
|
| 2008-351 |
CITY POWER COGEN L.P. |
City Power Cogen |
110 Progress Ave., Scarborough, ON |
New Generation |
50 MW
|
|
Part 1 SIA Comp |
|
| 2008-349 |
AIM POWERGEN CORPORATION |
Erie Shores II Wind Farm |
Tilsonburg |
New Generation |
50 MW
|
-
|
Withdrawn |
|
| 2008-347 |
NORTHLAND POWER INC. |
85 MW Macleans Mountain Wind Farm |
Manitoulin Island |
New Generation |
85 MW
|
-
|
Withdrawn |
|
| 2008-346 |
HYDRO ONE NETWORKS INC. |
Nanticoke and Detweiler SVC Installations |
Nanticoke GS and Detweiler TS |
Reactive Compensation |
350 MVAR
|
Q1-2011
|
Complete |
Final Report Addendum 1
|
| 2008-342 |
KRUGER INC. |
Kruger Energy Peninsula Wind |
Town of Marathon |
New Generation |
25.3 MVA
|
Q4-2010
|
Part 1 SIA Comp |
|
| 2008-341 |
WINDLECTRIC INC. |
Amherst Island Wind |
Amherst Island |
New Generation |
200 MW
|
-
|
Withdrawn |
|
| 2008-340 |
IPC ENERGY |
White Pines Wind Farm |
Prince Edwards County |
New Generation |
64 MW
|
-
|
Withdrawn |
|
| 2008-339 |
JUWI SOLAR INC. |
Greenbelt Solar |
Bradford West Gwillimbury |
Generation - Solar |
50 MW
|
-
|
Withdrawn |
|
| 2008-338 |
CANADIAN HYDRO DEVELOPERS INC. |
Parkhill Wind Project |
North Middlesex |
New Generation |
34.5 MW
|
Q3-2012
|
Part 1 SIA Comp |
|
| 2008-337 |
RENEWABLE ENERGY SYSTEMS CANADA INC. |
Greenwich Lake Wind Farm |
west of Dorion, ON |
New Generation |
99 MW
|
In-Service
|
Complete |
Final Report
|
| 2008-336 |
RENEWABLE ENERGY SYSTEMS CANADA INC. |
Whitney Wind Farm |
near Madawaska, ON |
New Generation |
49 MW
|
Q3-2010
|
Part 1 SIA Comp |
|
| 2008-335 |
RENEWABLE ENERGY SYSTEMS CANADA INC. |
Talbot Wind Farm |
near Ridgetown, ON |
New Generation |
99 MW
|
In-Service
|
Complete |
Final Report
|
| 2008-334 |
IPC ENERGY |
Sydenham Wind Farm |
Twshp of Dawn-Euphemia, Lambton Cty Chatham-Kent |
New Generation |
64
|
-
|
Withdrawn |
|
| 2008-333 |
NORTHLAND POWER INC. |
Northland GM Cogeneration Project |
Park Rd. South, Oshawa, ON |
New Generation |
105 MW 210 MW
|
Q2-2013 Q2-2013
|
Complete |
Final Report
|
| 2008-332 |
HYDRO ONE NETWORKS INC. |
Tilbury West DS Second 115 kV Connection |
Township of Tilbury West, Essex County |
New Supply Point & Transmission |
- |
Q2-2010
|
Active |
Final Draft Report
|
| 2008-331 |
TWENTY TWO DEGREE ENERGY CORPORATION |
Twenty Two Degree Energy |
Holmesville, Central Huron, County of Huron |
New Generation |
200 MW
|
|
Part 1 SIA Comp |
|
| 2008-329 |
BRAMPTON COGENERATION INC. |
New 15MW CHP Project |
7656 Bramelea Road |
New Generation |
24.325 MVA
|
Q3-2010
|
Part 1 SIA Comp |
|
| 2008-326 |
AIR ENERGY TCI INC. (TCI RENEWABLES) |
Nanticoke Wind Energy Project |
East of Nanticoke, ON |
New Generation |
80 MW
|
-
|
Withdrawn |
|
| 2008-325 |
BOWARK ENERGY LTD. |
Kent Centre Wind Farm |
Chatham-Kent; Harwich; Howard & Raleigh townships |
New Generation |
150 MW
|
-
|
Withdrawn |
|
| 2008-324 |
ST. MARYS RENEWABLE ENERGY CORP. |
St. Marys Renewable Energy Centre |
Sault Ste. Marie, ON, P6A 5P4 |
New Generation |
35.3 MVA
|
Q3-2011
|
Part 1 SIA Comp |
|
| 2008-323 |
TORONTO HYDRO ENERGY SERVICES INC. |
City Power Solution - Molson |
1 Carlingview Dr., Toronto, ON |
New Generation |
56.3 MVA 14.85 MVA
|
Q4-2012 Q4-2012
|
Part 1 SIA Comp |
|
| 2008-322 |
TRANSCANADA CORPORATION |
Belwood Wind Power |
Orangeville |
New Generation |
48 MW
|
-
|
Withdrawn |
|
| 2008-321 |
TRANSCANADA CORPORATION |
Romney Wind Project |
Chatham & Kent (S of Tilbury) |
New Generation |
172.5 MW
|
-
|
Withdrawn |
|
| 2008-320 |
POWERSTREAM INC. |
Markham MTS#4 |
NW corner of Rodick Rd & Hwy 407, Markham, ON |
New Supply Point |
- |
Q2-2010
|
Complete |
Final Report
|
| 2008-319 |
CANADIAN SHIELD WIND POWER-DIV OF PTERAGEN CANADA |
Garson Wind Farm |
Comm. of Garson-Municipality of Greater Sudbury |
New Generation |
100 MW
|
Q3-2012
|
Part 1 SIA Comp |
|
| 2008-318 |
HYDRO ONE NETWORKS INC. |
Windsor Area Transmission Reinforcement |
Municipality of Windsor and Essex County |
Transmission |
166.6 MVA
|
Q4-2012
|
Complete |
Final Draft Report
|
| 2008-316 |
INDEX ENERGY CORPORATION |
Index Energy |
Whitby TS #1 |
New Generation |
18.75 MVA
|
-
|
Withdrawn |
|
| 2008-315 |
BROOKFIELD RENEWABLE POWER INC. |
Iron Bridge GS |
Algoma x Mississagi Area |
New Generation |
10 MW
|
-
|
Withdrawn |
|
| 2008-314 |
GENGROUTH MERLIN L.P. |
Merlin Wind Buxton Farm |
Chatham-Kent, Near Town of Merlin |
New Generation |
99 MW
|
Q1-2010
|
Part 1 SIA Comp |
|
| 2008-312 |
NORTHGATE MINERALS CORPORATION |
Young-Davidson Project |
Matachewan, ON |
New Supply Point |
- |
In-Service
|
Complete |
Final Report Appendix 1
|
| 2008-310 |
SUN COKE INTERNATIONAL |
Erie Ontario Coke Company CGS (Erie OCC CGS) |
Nanticoke, ON |
New Generation |
154 MVA
|
Q1-2011
|
Part 1 SIA Comp |
|
| 2008-309 |
RICHVIEW RESOURCES INC. |
Thierry Mine Development |
Pickle Lake, ON |
New Supply Point |
9 MW
|
Q4-2010
|
Complete |
Final Report
|
| 2008-307 |
WINDSTREAM TEMAGAMI INC. |
Friday Lake Wind Farm |
Temagami, ON |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 2008-304 |
WINDSTREAM ELK LAKE INC. |
Gowganda/Elk Lake Wind Farm |
Elk Lake, ON |
New Generation |
500 MW
|
-
|
Withdrawn |
|
| 2008-302 |
ENBRIDGE INC. |
Saugeen Shores Wind Farm |
Town of Saugeen Shores, ON |
New Generation |
49.5 MW
|
Q4-2011
|
On-Hold |
|
| 2008-301 |
ENBRIDGE INC. |
Kincardine II Wind Farm |
Municipality of Kincardine, ON |
New Generation |
99 MW
|
Q4-2011
|
On-Hold |
|
| 2008-298 |
HYDRO ONE NETWORKS INC. |
Woodstock E. TS:Build 50/83MVA,115-27.6kV Trans St |
Vicinity of the Toyota Woodstock Plant |
New Supply Point & Transmission |
117 MVA
|
Q2-2010
|
Active |
Final Draft Report
|
| 2008-297 |
ACCIONA WIND ENERGY CANADA INC. |
Merlin-Quinn Wind Power Project |
Chatham-Kent Area, South-Western Ontarioario |
New Generation |
76 MW
|
-
|
Withdrawn |
|
| 2008-296 |
HORIZON HYDRO INC. |
Trout Lake River |
Township of Gery, On, Canada |
New Generation |
5 MW
|
-
|
Withdrawn |
|
| 2007-295 |
HYDRO ONE NETWORKS INC. |
Install 7 Cap Banks-SWO-OPA NearTerm Measure Bruce |
Buchanan TS, Middleport TS, Nanticoke TS |
Reactive Compensation |
1700 MVAR
|
Q2-2009
|
Active |
Final Draft Report
|
| 2007-294 |
ONTARIO POWER GENERATION - HYDRO |
New Post Creek GS |
Township of Pinard, District of Cochrane |
New Generation |
28 MVA
|
Q4-2012
|
Complete |
Final Report
|
| 2007-293 |
AIR ENERGY TCI INC. (TCI RENEWABLES) |
Adelaide Wind Energy Project |
Vicinity of Adelaide, Adelaide-Metcalfe, ON |
New Generation |
74 MW
|
-
|
Withdrawn |
|
| 2007-292 |
SKYPOWER CORP. |
Hardwood Hills |
Near Foymount, South of Lake Clear |
New Generation |
49.5 MW
|
|
Part 1 SIA Comp |
|
| 2007-290 |
AIRTRICITY CANADA LTD. |
Dover Centre Wind Farm |
Chatham-Kent, Municipality |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 2007-289 |
AIM POWERGEN CORPORATION |
Pointe Aux Roches (South Lake St. Clair) Wind Farm |
Essex County Near the Town of Tilbury |
New Generation |
40 MW
|
-
|
Withdrawn |
|
| 2007-288 |
AIM POWERGEN CORPORATION |
ERIEAU Wind Farm |
County of Chatham-Kent Near the Town of Blenheim |
New Generation |
99 MW
|
-
|
Withdrawn |
|
| 2007-287 |
AIM POWERGEN CORPORATION |
East Lake St. Clair Wind Farm |
County of Chatham-Kent north of Chatham |
New Generation |
99 MW
|
-
|
Withdrawn |
|
| 2007-286 |
SKYPOWER CORP. |
Parry Island Wind Farm |
Parry Island, ON |
New Generation |
150 MW
|
|
Part 1 SIA Comp |
|
| 2007-285 |
4444388 CANADA INC. |
NAMEWAMINIKAN Hydro Project |
Beardmore, ON |
New Generation |
10 MW
|
-
|
Withdrawn |
Final Report
|
| 2007-284 |
TERRACE BAY PULP INC. |
STG2 |
Terrace Bay, ON |
New Generation |
29.5 MVA
|
Q2-2008
|
Complete |
Final Report
|
| 2007-283 |
CPV CANADA DEVELOPMENTS INC. |
Nanticoke Energy Center |
768 Haldimand Rd 55, Jarvis, ON, Lot7, Conces |
New Generation |
1758 MVA
|
N/A
|
Active |
|
| 2007-282 |
KABINAKAGAMI POWER L.P. |
Kabinakagami Stns 1-6 (6x9.9MW stns connect 115kV |
Kabinakagami River north Hwy 11, south Roger's Rd |
New Generation |
60 MW
|
-
|
Withdrawn |
|
| 2007-281 |
BUTTCON LTD. |
Windsor Energy Centre |
Windsor, ON |
New Generation |
14 MW
|
|
Complete |
Final Report
|
| 2007-280 |
FPLE CANADIAN WIND, ULC |
Clarke-T Wind Farm |
Lambton and Middlesex Counties, ON |
New Generation |
349.5 MW
|
-
|
Withdrawn |
|
| 2007-279 |
BROOKFIELD POWER |
Lower Lake Hydroelectric GS |
Aguasabon River |
New Generation |
10 MW
|
-
|
Withdrawn |
Final Draft Report
|
| 2007-278 |
FPLE CANADIAN WIND, ULC |
Bornish Wind Farm |
Lambton County, ON |
New Generation |
84 MW
|
-
|
Withdrawn |
|
| 2007-277 |
FPLE CANADIAN WIND, ULC |
Seaforth-T Wind Farm |
Huron County, ON |
New Generation |
87 MW
|
-
|
Withdrawn |
|
| 2007-276 |
FPLE CANADIAN WIND, ULC |
Jericho Wind Farm |
Lambton County, ON |
New Generation |
249 MW
|
-
|
Withdrawn |
|
| 2007-275 |
FPLE CANADIAN WIND, ULC |
Centralia-T Wind Farm |
Huron County, ON |
New Generation |
63 MW
|
-
|
Withdrawn |
|
| 2007-274 |
BROOKFIELD WIND POWER CORPORATION |
Madawaska Wind Park |
Near Madawas-Vicinity of Wallance TS, Eastern ON |
New Generation |
199.5 MW
|
N/A
|
Active |
|
| 2007-273 |
BROOKFIELD WIND POWER CORPORATION |
Renfrew Wind Park |
Renfrew Area-Vicinity of Mount Chute GS, East ON |
New Generation |
99 MW
|
N/A
|
Active |
|
| 2007-272 |
CPV CANADA DEVELOPMENTS INC. |
North Dumfries Energy Center |
2384 Dundas Road South, Cambridge, ON |
New Generation |
500 MVA
|
N/A
|
Active |
|
| 2007-270 |
WIKWEMIKONG UNCEDED INDIAN RESERVE |
Wikwemikong Wind Generation Facility - Site A |
Wikwemikong, ON |
New Generation |
124 MW
|
-
|
Withdrawn |
|
| 2007-269 |
HYDRO ONE NETWORKS INC. |
Embedded Generation Study - Multiple Stations |
Multiple Stations |
New Generation |
- |
|
Complete |
Draft Report
|
| 2007-268 |
RALEIGH WIND POWER PARTNERSHIP |
Raleigh Wind Energy Centre |
North Kent - Chatham Kent Area |
New Generation |
78 MW
|
In-Service
|
Complete |
Final Report Addendum 1
|
| 2007-267 |
DOVER WIND POWER PARTNERSHIP |
Dover Wind Energy Centre |
North Kent - Chatham Kent Area |
New Generation |
40 MW
|
-
|
Withdrawn |
|
| 2007-266 |
ONTARIO POWER GENERATION - HYDRO |
Mattagami Lake Dam Development |
Geographic Township of Gouin, District of Sudbury |
New Generation |
5.6 MVA
|
Q4-2010
|
Complete |
Final Report
|
| 2007-265 |
HYDRO ONE NETWORKS INC. |
Replace Keith 230/115 kV Autotransformers T11&T12 |
Keith TS |
Transmission Upgrades |
500 MVA
|
Q1-2010
|
Complete |
Final Draft Report
|
| 2007-264 |
HYDRO ONE NETWORKS INC. |
Goreway TS-Build New 230/28-28kV, 75/125 MVA DESN |
9513 Goreway Dr, Brampton (at existing Goreway TS) |
New Supply Point |
175 MVA
|
Q2-2010
|
Active |
Final Draft Report
|
| 2007-263 |
HYDRO ONE NETWORKS INC. |
Windsor Area Transmission Reinforcement |
Municipality of Windsor and Essex County |
Transmission |
500 MVA
|
-
|
Withdrawn |
Final Draft Report
|
| 2007-262 |
HYDRO ONE NETWORKS INC. |
Mississagi Area Generation Rejection Scheme Expans |
Mississagi Area |
Special Protection System |
- |
Q3-2009
|
Active |
|
| 2007-261 |
FORT CHICAGO DISTRICT ENERGY LTD. |
Fort Chicago London District Energy Plant |
London, ON |
New Generation |
22 MVA
|
In-Service
|
Complete |
Final Report
|
| 2007-260 |
HYDRO ONE NETWORKS INC. |
Rodney TS - 25/41 MVA, 230-27.6 kV |
Aldborough Twp, County of Chatham-Kent |
New Supply Point |
57 MVA
|
Q4-2011
|
Complete |
Final Draft Report Addendum 1
|
| 2007-259 |
LAKESHORE GOLD CORP. |
Timmins West Mine CTS |
Timmins (Hwy 101 W & 144) |
Additional Load |
- |
Q3-2007
|
Complete |
Report
|
| 2007-258 |
HYDRO ONE NETWORKS INC. |
Vansickle TS - Replace transformers |
City of St. Catherine |
Transmission |
- |
Q1-2011
|
Active |
Final Draft Report
|
| 2007-257 |
HYDRO ONE NETWORKS INC. |
St. Catherines 115 kV Circuit Upgrade |
St. Catherines Area |
Transmission |
- |
Q4-2009
|
Active |
Final Draft Report
|
| 2007-255 |
SOAVE HYDROPONICS COMPANY |
Great Northern Tri-Gen Facility |
1400 Rd. 3 East, Kingsville, ON |
New Generation |
12 MW
|
In-Service
|
Active |
Final Draft Report
|
| 2007-254 |
ONTARIO POWER GENERATION - HYDRO |
Lakeview Power |
Mississauga |
New Generation |
900 MW
|
Q1-2011
|
Active |
|
| 2006-253 |
HYDRO ONE NETWORKS INC. |
Woodstock Area Transmission Reinforcement |
Woodstock, ON |
Transmission |
- |
In-Service
|
Active |
Final Draft Report Addendum 1
|
| 2006-252 |
ONTARIO POWER GENERATION - HYDRO |
Beck 1 G7 Conversion |
Beck 1 Generation Station |
New Generation |
68.5 MVA
|
In-Service
|
Complete |
Final Report Addendum 1
|
| 2006-251 |
TORONTO HYDRO-ELECTRIC SYSTEM LIMITED |
Enwave Energy Corp 11MW Emergency Generating Plant |
Metro Tor Conv Ctre & John Street Pumping Station |
New Generation |
11 MW
|
In-Service
|
Complete |
Report
|
| 2006-250 |
HYDRO ONE NETWORKS INC. |
Transmission Out of Bruce |
Southwestern Ontarioario |
Transmission |
- |
Q4-2011
|
Active |
Final Draft Report Diagrams
|
| 2006-248 |
HYDRO ONE NETWORKS INC. |
Build Two Circuits-Hurontario SS to Jim Yarrow MTS |
On the existing R21T/R19T, Plesant tap R-O-W |
Transmission |
- |
In-Service
|
Complete |
Final Draft Report
|
| 2006-246 |
HYDRO ONE NETWORKS INC. |
Terminate V77R at Richview TS |
Richview TS |
Transmission |
- |
Q2-2009
|
Complete |
|
| 2006-245 |
HYDRO OTTAWA LIMITED |
Cyrville MTS |
Cyrville Road Ottawa |
New Supply Point |
- |
Q3-2008
|
Complete |
Final Report
|
| 2006-241 |
ONTARIO POWER GENERATION - HYDRO |
Upper Mattagami Redevelopment |
Twnp of Gillies Timber Limit, Dist of Temiskaming |
New Generation |
44 MW
|
|
Complete |
Final Report
|
| 2006-240 |
TORONTO HYDRO ENERGY SERVICES INC. |
New Power Cogeneration |
Toronto, ON, Canada |
New Generation |
30 MVA
|
-
|
Withdrawn |
|
| 2006-239 |
ONTARIO POWER GENERATION - HYDRO |
Lower Mattagami Dev - Smoky Falls GS Redevelopment |
70km Northeast of Kapuskasing |
New Generation |
441 MW
|
Q1-2012
|
Complete |
Final Report
|
| 2006-238 |
HYDRO ONE NETWORKS INC. |
Leaside TS x Bridgeman TS: Build 1x115kV Circuit |
Mid-town Toronto |
Transmission |
- |
Q2-2012
|
Complete |
Final Report Post-SIA Report
|
| 2006-237 |
BROOKFIELD WIND POWER CORPORATION |
Spider Wind Park |
North of SSM, Twnp of Spider, Northern Ontarioario |
New Generation |
150 MW
|
-
|
Withdrawn |
|
| 2006-236 |
BROOKFIELD WIND POWER CORPORATION |
Comber Wind Park |
Near the town of Comber, Southwestern Ontarioario |
New Generation |
150 MW
|
-
|
Withdrawn |
|
| 2006-234 |
PRISTINE POWER INC. |
East Windsor Cogeneration Plant |
1000 Henry Ford Centre Drive, Windsor, ON M9A 7E8 |
New Generation |
99 MW
|
In-Service
|
Complete |
Report Addendum 1
|
| 2006-233 |
HYDRO ONE NETWORKS INC. |
Detweiler 245Mvar,Orangeville 245Mvar |
Detweiler TS, Orangeville TS |
Reactive Compensation |
245 MVAR
|
In-Service
|
Active |
Final Draft Report
|
| 2006-232 |
TRANSCANADA ENERGY LTD. |
Halton Hills Generating Station |
Town of Halton Hills (401 Industrial Corridor) |
New Generation |
755 MVA
|
In-Service
|
Complete |
Final Report
|
| 2006-231 |
HYDRO ONE NETWORKS INC. |
Pleasant TS-Build New 230/28-28kV, 75/125MVA DESN |
North-West Brampton, ON |
New Supply Point |
- |
In-Service
|
Active |
Final Draft Report
|
| 2006-230 |
HYDRO ONE NETWORKS INC. |
Churchill Meadows TS - New 230/44kV,75/125MVA DESN |
Vicinity-Winston Churchill Blvd, North-West Miss |
New Supply Point |
- |
Q4-2010
|
Active |
Final Draft Report
|
| 2006-228 |
HYDRO ONE NETWORKS INC. |
Red Lake TS: Refurbish 115-44kV Trans Station |
Town of Red Lake |
Additional Load |
- |
In-Service
|
Complete |
Final Draft Report
|
| 2006-227 |
HYDRO ONE NETWORKS INC. |
Everett TS: New Transformer Station |
Township of Tosoronto-Cnty Road 5 & County Road 15 |
New Supply Point |
- |
In-Service
|
Active |
Final Draft Report
|
| 2006-226 |
NORTH AMERICAN PALLADIUM |
Underground Load Addition |
Lac Dec Iles Mine (90km north of Thunder Bay) |
Additional Load |
10
|
Under Construction
|
Complete |
Final Report
|
| 2006-225 |
HYDRO ONE NETWORKS INC. |
Toyota Woodstock: Install Supply Facilities |
Woodstock, ON |
New Supply Point |
41 MVA
|
In-Service
|
Active |
Final Draft Report
|
| 2006-224 |
HYDRO ONE NETWORKS INC. |
Hurontario SS & 230 kV transmission extended |
Milton-Claire 500kV ROW Intersects R21T/R19T Pleas |
Transmission |
- |
In-Service
|
Complete |
Final Report Addendum 1
|
| 2006-223 |
HYDRO ONE NETWORKS INC. |
NE Transmission Expansion |
Porcupine TS, Kirkland Lake TS |
Reactive Compensation |
- |
Under Construction
|
Complete |
Final Report Addendum 1 Addendum 2 Diagrams
|
| 2006-221 |
HYDRO ONE NETWORKS INC. |
New LV Shunt Capacitor-Meadowvale TS & Halton TS |
Meadowvale TS/Halton TS |
Low Voltage Reactive Compensation |
21.6 MVAR 32.4 MVAR
|
Q4-2008 In-Service
|
Complete |
Report
|
| 2006-220 |
HYDRO ONE NETWORKS INC. |
Claireville TS Modification |
Claireville TS |
Transmission |
- |
Q4-2009
|
Complete |
Report
|
| 2006-216 |
REGIONAL POWER INC. |
White River |
Town of Mobert |
New Generation |
11.11 MVA 9.44 MVA
|
- -
|
Withdrawn |
Final Report Final Report
|
| 2006-215 |
HYDRO ONE NETWORKS INC. |
Cambridge Preston TS-Add 250MVA, 230/115kV Auto Tr |
Cambridge Preston TS |
Transmission |
250 MVA
|
Q4-2007
|
Active |
Final Draft Report
|
| 2006-214 |
ONTARIO POWER GENERATION - HYDRO |
Pickering Auxiliary Power Supply |
Pickering GS |
New Generation |
76 MW
|
In-Service
|
Complete |
Report
|
| 2006-212 |
HYDRO ONE NETWORKS INC. |
2nd DESN at Talbot TS |
Build 50/83 MVA, 230-27.6 kV Transformer Station |
New Supply Point |
83 MVA
|
In-Service
|
Active |
Final Draft Report
|
| 2006-211 |
HYDRO ONE NETWORKS INC. |
Holland TS |
King Township or East Gwillimbury |
New Supply Point |
75 MVA 175 MVA
|
In-Service Q2-2009
|
Active |
Phase I Report Phase II Final Draft Report
|
| 2006-209 |
HYDRO ONE NETWORKS INC. |
Enfield TS (Oshawa Area TS) |
Oshawa Area |
New Supply Point |
250 MVA
|
Q2-2011
|
Active |
Final Draft Report
|
| 2005-208 |
HYDRO ONE NETWORKS INC. |
Manitoba-Ontario Inter Increase Firm Cap 400MW |
Kenora |
Interconnection |
400 MW
|
N/A
|
On-Hold |
|
| 2005-207 |
FIVE NATIONS ENERGY INC. |
Energize Second Transformers at Fort Albany TS |
Fort Albany TS |
New Supply Point |
20 MVA
|
Under Construction
|
Complete |
Report
|
| 2005-206 |
BARRINGTON WIND ENERGY LTD. |
Huron Pine River Project |
Concession A, 9 and 10; Huron-Kinloss Township |
New Generation |
18 MW
|
-
|
Withdrawn |
|
| 2005-205 |
GREEN BREEZE |
Great Winds |
Central Huron Municipality, Huron County |
New Generation |
79.5 MW
|
Q3-2007
|
On-Hold |
|
| 2005-204 |
VISION QUEST WINDELECTRIC |
Trillium Wind Farm |
Amberley, Bruce County & Ashfield, Huron Ontarioar |
New Generation |
75 MW
|
-
|
Withdrawn |
|
| 2005-203 |
KRUGER INC. |
Kruger Wind Generation Station |
Port Alma |
New Generation |
101 MW
|
In-Service
|
Complete |
Report
|
| 2005-202 |
POWERSTREAM INC. |
Greenwood TS Expansion |
8000 Dufferin St., Vaughan, ON |
New Supply Point |
175 MW
|
In-Service
|
Complete |
Report
|
| 2005-201 |
CANADIAN HYDRO DEVELOPERS INC. |
Amherst Island Windfarm |
Amherst Island |
New Generation |
24 MW
|
-
|
Withdrawn |
|
| 2004-176 |
CANADIAN NIAGARA POWER |
115 kV Interconnection (L5C) |
Cornwall, Eastern Ontarioario |
Transmission |
150 MVAR
|
N/A
|
Complete |
Final Report Addendum 1
|