Status of System Impact Assessment Applications received before April 30, 2005
This list provides the status of all transmission, load, generation and ancillary services connection proposals that have submitted an System Impact Assessment (SIA) application before April 30, 2005 and subsequently executed an SIA agreement. Queuing principles are still applicable to these proposals.
The following are the possible states of the status column:
- "Complete" indicates that reports are available for viewing.
- "Active" indicates that work is in progress.
- "On Hold" indicates that the assessment was placed on hold because the projects has been delayed.
- "Not Required" indicates that a System Impact Assessment is not required.
- "By HONI" indicates that an assessment of the Project was conducted by Hydro One Networks Inc. (HONI) prior to the enactment of the applicable Market Rules, and has been accepted in lieu of Preliminary Assessment.
| 153 |
2005-200 May 17, 2005 |
HYDRO ONE NETWORKS INC. |
500 kV series compensation in SWO |
Grand Bend, Tillsonburg & Lake Bellwood |
Reactive Compensation |
- |
Q4-2007
|
Active |
Draft Report Appendix 1 Addendum Appendix 2
|
| 155 |
2005-198 May 18, 2005 |
HYDRO ONE NETWORKS INC. |
Whitby TS |
4590 Halls Road, Whitby, ON |
New Supply Point |
- |
Under Construction
|
Complete |
Report
|
| 157 |
2005-196 Jul 15, 2005 |
BRANTFORD POWER INC. & BRANT COUNTY POWER INC. |
"POWERLINE" Municipal TS |
707 Powerline Rd, Paris, ON |
New Supply Point |
- |
In-Service
|
Complete |
Report
|
| 152 |
2005-195 May 4, 2005 |
HYDRO ONE NETWORKS INC. |
Fort Frances TS |
Fort Frances, ON |
Reactive Compensation |
- |
Q1-2010
|
Active |
Final Draft Report
|
| 160 |
2005-194 Dec 14, 2005 |
HYDRO ONE NETWORKS INC. |
Belle River TS |
Belle River Junction |
New Supply Point |
57.4 MW
|
In-Service
|
Complete |
Report
|
| 156 |
2005-193 Jul 12, 2005 |
WEST WIND DEVELOPMENT INC. |
Proton Wind Farm |
Nr. Town of Cedavale |
New Generation |
172.5 MW
|
-
|
Withdrawn |
|
| 154 |
2005-192 May 18, 2005 |
CANADIAN NIAGARA POWER |
115 Interconnection at Fort Erie |
Fort Erie, ON |
Interconnection |
150 MVA
|
Under Construction
|
Complete |
Report
|
| 151 |
2005-190 Apr 7, 2005 |
HYDRO ONE NETWORKS INC. |
Stayner TS: Reinforce Transmission Facilities |
Stayner TS, Essa TS, Stayner TS by Essa TS R of Wa |
Transmission |
- |
In-Service
|
Complete |
Report Addendum 1 Addendum 2
|
| 143 |
2004-188 Dec 9, 2004 |
BROOKFIELD WIND POWER CORPORATION |
LSP2 Power Project |
102 West Street, Sault Ste. Marie, ON P6A 6W6 |
New Generation |
122 MW
|
-
|
Withdrawn |
|
| 142 |
2004-187 Dec 9, 2004 |
ST. CLAIR POWER L.P. |
St. Clair Energy Centre |
Lake St. Clair Area, ON |
New Generation |
- |
In-Service
|
Complete |
Report Addendum Addendum#2
|
| 144 |
2004-186 Dec 10, 2004 |
PENINSULA ENGINEERING 2004 INC. |
Olympic Drive |
Hamilton, ON |
New Generation |
130 MW
|
-
|
Withdrawn |
|
| 145 |
2004-185 Dec 13, 2004 |
FALLSVIEW ENTERTAINMENT CENTRE INC. |
Niagara Fallsview |
Niagara Falls, ON |
New Generation |
66 MW
|
N/A
|
On-Hold |
|
| 141 |
2004-184 Dec 9, 2004 |
HYDRO ONE BRAMPTON NETWORKS INC. |
Brampton Brick Generation |
Brampton, ON |
New Generation |
12.5 MW
|
-
|
Withdrawn |
|
| 138 |
2004-183 Dec 7, 2004 |
BAY SHORE ENERGY LP. |
Bay Shore Energy |
Hamilton, ON |
New Generation |
37.5 MW 90 MW
|
N/A N/A
|
On-Hold |
|
| 140 |
2004-182 Dec 9, 2004 |
LAKE SHORE ENERGY LP. |
Lake Shore Energy |
Haldimand County, ON |
New Generation |
23 MW 90 MW
|
N/A N/A
|
On-Hold |
|
| 149 |
2004-181 Mar 2, 2005 |
CONESTOGO WIND POWER PARTNERSHIP |
Conestogo Wind Energy Centre |
Drayton near Moorefield, N of Kitchener |
New Generation |
200 MW
|
-
|
Withdrawn |
|
| 137 |
2004-179 Dec 6, 2004 |
QUEENS UNIVERSITY |
CHP Cogen Project |
Kingston, ON |
New Generation |
15 MW
|
In-Service
|
Complete |
Report
|
| 130 |
2004-175 Nov 24, 2004 |
ALGOMA STEEL INC. |
Algoma Steel Co-Generation Plant Study |
Sault Ste. Marie Plant |
New Generation |
- |
In-Service
|
Complete |
Final Report
|
| 125 |
2004-173 Nov 5, 2004 |
GREENFIELD NORTH POWER |
Greenfield 407 Power Plant |
Mississauga, ON |
New Generation |
330 MW
|
-
|
Withdrawn |
|
| 124 |
2004-172 Nov 4, 2004 |
EASTERN POWER LIMITED |
Greenfield 403 Power Plant |
Oakville, ON |
New Generation |
330 MW
|
-
|
Withdrawn |
|
| 128 |
2004-171 Nov 17, 2004 |
PRISTINE POWER INC. |
PPI Energy Project B |
Lambton County, St. Clair Township |
New Generation |
670 MW
|
-
|
Withdrawn |
|
| 122 |
2004-169 Oct 22, 2004 |
CALPINE CANADA POWER LTD. |
Calpine Talbot Energy Center |
Nanticoke/Haldimand Co. Conc. #2 |
New Generation |
1195 MW
|
-
|
Withdrawn |
|
| 121 |
2004-168 Oct 22, 2004 |
CALPINE CANADA POWER LTD. |
Calpine Corbett Energy Center |
Vaughan |
New Generation |
960 MW
|
-
|
Withdrawn |
|
| 123 |
2004-167 Nov 4, 2004 |
GREENFIELD ENERGY CENTRE, LP. |
Greenfield Energy Centre |
Courtright, Lambton County |
New Generation |
- |
In-Service
|
Complete |
Report Addendum Addendum#2
|
| 127 |
2004-166 Nov 11, 2004 |
NORTHLAND POWER INC. |
Newmarket Steven Court GS |
590 Steven Court, Newmarket, ON |
New Generation |
300 MW
|
-
|
Withdrawn |
|
| 119 |
2004-162 Sep 14, 2004 |
AES KINGSTON INC. |
Bath Combined Cycle |
Bath, ON |
New Generation |
550 MW
|
-
|
Withdrawn |
|
| 120 |
2004-161 Sep 30, 2004 |
CANADIAN NIAGARA POWER |
115 kV Interconnection |
Cornwall |
Transmission |
- |
|
Complete |
Report
|
| 158 |
2004-160 Apr 29, 2005 |
HYDRO ONE NETWORKS INC. |
Nobel TS |
Parry Sound |
Transmission |
1500 MW
|
In-Service
|
Active |
Final Draft Report Addendum 1 Diagrams
|
| 126 |
2004-159 Nov 11, 2004 |
DOFASCO INC. |
Dofasco Cogeneration Project |
Hamilton |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 118 |
2004-158 Sep 14, 2004 |
TRANSCANADA ENERGY LTD. |
Meadowvale Power Project |
Mississauga |
New Generation |
600 MW
|
-
|
Withdrawn |
|
| 150 |
2004-154 Mar 24, 2005 |
TWENTY TWO DEGREE ENERGY CORPORATION |
Twenty Two Degree Wind Power Generation |
Goderich, ON |
New Generation |
200 MW
|
-
|
Withdrawn |
|
| 108 |
2004-153 Aug 6, 2004 |
CANADIAN HYDRO DEVELOPERS INC. |
Wolfe Island |
Wolfe Island |
New Generation |
300 MW
|
-
|
Withdrawn |
|
| 117 |
2004-152 Aug 12, 2004 |
AES KINGSTON INC. |
Kingston CoGen GS |
Bath, ON (Kingston) |
New Generation |
50 MW
|
-
|
Withdrawn |
|
| 129 |
2004-151 Nov 24, 2004 |
AIM POWERGEN CORPORATION |
Lowbanks Wind Farm |
Dunnville |
New Generation |
90 MW
|
N/A
|
On-Hold |
|
| 136 |
2004-150 Dec 1, 2004 |
VENTUS ENERGY INC. |
Thunder Bay Wind Park |
Thunderbay |
New Generation |
253 MW
|
-
|
Withdrawn |
|
| 133 |
2004-149 Nov 30, 2004 |
VENTUS ENERGY INC. |
Michipicoten Wind Park |
Wawa |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 132 |
2004-148 Nov 30, 2004 |
VENTUS ENERGY INC. |
Paisley Wind Park |
Paisley |
New Generation |
51 MW
|
-
|
Withdrawn |
|
| 135 |
2004-147 Dec 1, 2004 |
VENTUS ENERGY INC. |
Pays Plat Wind Park |
Pays Plat |
New Generation |
100 MW
|
N/A
|
On-Hold |
|
| 131 |
2004-146 Nov 30, 2004 |
VENTUS ENERGY LAKEHEAD WINDPOWER L.P. |
Lakehead Wind Park |
Thunder Bay/Shuniah Township |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 147 |
2004-145 Feb 3, 2005 |
BROOKFIELD WIND POWER CORPORATION |
Shelburne |
Town of Shelburne & Melancthon Twp. |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 139 |
2004-144 Dec 9, 2004 |
BROOKFIELD WIND POWER CORPORATION |
Dunnville |
Dunnville Area near Grant Point & Rock Point |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 148 |
2004-143 Feb 5, 2005 |
ENBRIDGE ONTARIO WIND POWER LP. |
Underwood WGS - Project B |
Near Kincardine |
New Generation |
- |
In-Service
|
Complete |
Report Addendum 1
|
| 114 |
2004-140 Jul 19, 2004 |
ENERGY OTTAWA |
Chaudiere 1 Generating Station |
Chaudiere Falls |
New Generation |
20 MW
|
N/A
|
On-Hold |
|
| 115 |
2004-139 Aug 6, 2004 |
INVENERGY WIND CANADA ULC |
Simcoe Wind Farm |
Woodville, between Beaverton and Lindsay |
New Generation |
200 MW
|
-
|
Withdrawn |
|
| 111 |
2004-138 Jun 28, 2004 |
VENTUS ENERGY INC. |
Christian Island Wind Park |
Georgian Bay |
New Generation |
51 MW
|
N/A
|
On-Hold |
Draft Report
|
| 112 |
2004-137 Jun 29, 2004 |
WEYERHAEUSER |
Dryden Cogeneration |
Weyerhaeuser Mill in Dryden |
New Generation |
85 MW
|
-
|
Withdrawn |
Draft Report
|
| 98 |
2004-136 May 21, 2004 |
GREAT LAKES POWER - GENERATION |
Andrews GS Excitation |
Andrews GS |
Generator Upgrades |
- |
In-Service
|
Complete |
Report
|
| 113 |
2004-135 Jul 14, 2004 |
HYDRO ONE NETWORKS INC. |
Essa Shunt Capacitor |
Essa TS |
Reactive Compensation |
245 MVAR
|
In-Service
|
Complete |
Report
|
| 105 |
2004-134 May 27, 2004 |
VISION QUEST WINDELECTRIC |
Reid's Corner |
Ripley, ON (Reid's Corner) |
New Generation |
75 MW
|
-
|
Withdrawn |
|
| 109 |
2004-133 Jun 16, 2004 |
ARBOUR POWER LP. |
Arbour Power Biomass Generation |
Ajax Ontarioario |
New Generation |
53 MW
|
N/A
|
On-Hold |
|
| 104 |
2004-132 May 27, 2004 |
SCHNEIDER POWER INC. |
Providence Bay Wind Farm |
Manitoulin Island (Providence Bay) |
New Generation |
21 MW
|
-
|
Withdrawn |
|
| 107 |
2004-131 Jun 8, 2004 |
INVENERGY WIND CANADA ULC |
Southgate Wind Farm |
Cedarville - Southgate Wind Farm |
New Generation |
200 MW
|
-
|
Withdrawn |
|
| 106 |
2004-130 Jun 2, 2004 |
REGIONAL POWER INC. |
Wawatay GS Expansion |
NW -Marathon Area (Wawatay GS) |
New Generation |
7 MW
|
Q1-2007
|
Complete |
Report
|
| 101 |
2004-129 May 25, 2004 |
SUNCOR ENERGY INC. |
Malahide Wind Farm |
Malahide (Burwell) area |
New Generation |
25.5 MW
|
-
|
Withdrawn |
|
| 100 |
2004-128 May 25, 2004 |
BEGETEKONG POWER CORPORATION |
Umbata Falls Hydroelectric Project |
Northeast of Marathon, White River (Umbata Falls) |
New Generation |
- |
In-Service
|
Complete |
Report
|
| 110 |
2004-126 Jun 18, 2004 |
NORTHLAND POWER INC. |
Cambridge Generation MTS#1 |
Conestoga Boulevard, Cambridge |
New Generation |
96 MW
|
-
|
Withdrawn |
|
| 99 |
2004-125 May 25, 2004 |
SUNCOR ENERGY INC. |
Ripley Wind Farm |
Shores of Lake Huron (Ripley) |
New Generation |
- |
In-Service
|
Complete |
Report Addendum 1
|
| 103 |
2004-124 May 27, 2004 |
TRANSCANADA ENERGY LTD. |
Blackstone Power Project |
Mississauga |
New Generation |
1200 MW
|
-
|
Withdrawn |
|
| 94 |
2004-123 May 5, 2004 |
EPCOR POWER DEVELOPMENT CORPORATION |
Applewood Power |
Etobicoke/Mississauga |
New Generation |
310 MW
|
N/A
|
On-Hold |
|
| 97 |
2004-122 May 20, 2004 |
ECHO POWER GENERATION INC. |
Echo Power Wind |
Port Burwell |
New Generation |
100 MW
|
N/A
|
Complete |
Report
|
| 96 |
2004-121 May 20, 2004 |
ENBRIDGE ONTARIO WIND POWER LP. |
Underwood WGS - Project A |
Kincardine |
New Generation |
- |
In-Service
|
Complete |
Report Report
|
| 102 |
2004-120 May 26, 2004 |
ONTARIO POWER GENERATION - HYDRO |
Tiverton Wind Farm |
Kincardine (Tiverton) |
New Generation |
24 MW
|
N/A
|
On-Hold |
|
| 93 |
2004-119 Apr 26, 2004 |
NORTHLAND POWER INC. |
Kitchener Fairview GS |
Kitchener |
New Generation |
192 MW
|
-
|
Withdrawn |
|
| 92 |
2004-117 Apr 21, 2004 |
BROOKFIELD WIND POWER CORPORATION |
Prince Park Wind Farm |
Sault St. Marie (Prince Park) |
New Generation |
- |
In-Service In-Service
|
Complete |
Report Appendix
|
| 91 |
2004-116 Mar 29, 2004 |
NORTHLAND POWER INC. |
Grand Bend Wind Farm |
South Huron (Grand Bend) |
New Generation |
86.4 MW
|
-
|
Withdrawn |
|
| 88 |
2004-115 Mar 2, 2004 |
HYDRO ONE NETWORKS INC. |
Trafalgar TS: 300MVAr Cap Bank |
Trafalgar TS |
Reactive Compensation |
300 MVAR
|
In-Service
|
Complete |
Report
|
| 89 |
2004-114 Mar 17, 2004 |
EPCOR POWER DEVELOPMENT CORPORATION |
Kingsbridge II 500 kV Connection |
Ashfield-Colborne |
New Generation |
158.7 MW 140 MW
|
- -
|
Withdrawn |
Report
|
| 85 |
2004-113 Jan 29, 2004 |
HYDRO ONE NETWORKS INC. |
Cooksville TS |
Cooksville TS |
Modified Connection |
- |
In-Service
|
Complete |
Report Addendum
|
| 86 |
2004-112 Jan 29, 2004 |
HYDRO ONE NETWORKS INC. |
Armitage No.3 TS |
Newmarket (Armitage 3 TS) |
New Supply Point |
- |
-
|
Withdrawn |
|
| 90 |
2004-111 Mar 22, 2004 |
CANADIAN HYDRO DEVELOPERS INC. |
Wolfe Island Wind Farm |
Wolfe Island |
New Generation |
62.6 MW
|
N/A
|
Complete |
Report
|
| 95 |
2003-109 May 20, 2004 |
BAY AREA HEALTH TRUST |
MUMC Co-Generation |
Hamilton (McMaster) |
New Generation |
12 MW
|
In-Service
|
Complete |
Report
|
| 83 |
2003-107 Nov 26, 2003 |
ENERSOURCE HYDRO MISSISSAUGA INC. |
GTAA |
Pearson IA |
New Generation |
- |
In-Service
|
Complete |
Report Addendum
|
| 81 |
2003-106 Sep 22, 2003 |
AIM POWERGEN CORPORATION |
Lake Erie Northshore |
Port Burwell (Lake Erie Northshore) |
New Generation |
51 MW
|
N/A
|
Complete |
Report Appendix
|
| 80 |
2003-104 Sep 11, 2003 |
HYDRO ONE NETWORKS INC. |
Cardiff TS |
Mississauga (Cardiff TS) |
New Supply Point |
- |
In-Service
|
Complete |
Report
|
| 87 |
2003-103 Feb 4, 2004 |
CANADIAN HYDRO DEVELOPERS INC. |
Melancthon Grey Wind Farm |
Melancthon Township |
New Generation |
132 MW
|
In-Service
|
Complete |
Report Appendix Addendum
|
| 79 |
2003-102 Aug 21, 2003 |
BORALEX INC. |
BORALEX INC. |
Mississauga |
New Generation |
180 MW
|
-
|
Withdrawn |
|
| 76 |
2003-101 Jul 4, 2003 |
HYDRO ONE NETWORKS INC. |
VISION QUEST - Royal Road project |
Picton |
New Generation |
22 MW
|
N/A
|
Complete |
Report
|
| 78 |
2003-100 Aug 1, 2003 |
HYDRO ONE NETWORKS INC. |
230 kV line Parkway to Armitage |
York Region (Armitage TS) |
Transmission |
- |
N/A
|
On-Hold |
|
| 77 |
2003-099 Aug 1, 2003 |
HYDRO ONE NETWORKS INC. |
Parkway TS |
Parkway TS |
New Supply Point |
- |
In-Service In-Service
|
Complete |
Report Addendum
|
| 82 |
2003-096 Oct 15, 2003 |
HYDRO VAUGHAN DISTRIBUTION INC. |
VAUGHAN HYDRO |
Vaughan MTS No. 4 |
New Supply Point |
- |
-
|
Withdrawn |
|
| 74 |
2003-095 May 15, 2003 |
ONTARIO ELECTRICITY FINANCIAL CORPORATION |
OEFC-RFP |
Various Locations |
New Generation |
440 MW
|
Cancelled
|
N/A |
Report
|
| 84 |
2003-094 Jan 21, 2004 |
CANADIAN HYDRO DEVELOPERS INC. |
GAIA POWER INC. project |
Wolfe Island |
New Generation |
35 MW
|
-
|
Withdrawn |
|
| 71 |
2003-093 Jun 12, 2003 |
NORFOLK POWER DISTRIBUTION INC. |
Bloomsburg TS |
Simcoe |
New Supply Point |
41.7 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 70 |
2003-092 Mar 7, 2003 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Cherrywood |
Modified Connection |
- |
In-Service
|
N/A |
Preliminary Assessment
|
| 69 |
2003-091 Mar 6, 2003 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Richview TS, Burlington TS & John TS |
Reactive Compensation |
412 MVAR 300 MVAR 99.5 MVAR
|
In-Service In-Service In-Service
|
Complete |
Report
|
| 73 |
2003-089 Mar 25, 2003 |
HYDRO VAUGHAN DISTRIBUTION INC. |
VAUGHAN HYDRO |
Vaughan |
Additional Load |
80 MW
|
Cancelled
|
N/A |
Preliminary Assessment
|
| 75 |
2003-087 Jul 4, 2003 |
HYDRO ONE NETWORKS INC. |
VISION QUEST - Pine River project |
Kincardine |
New Generation |
15 MW
|
N/A
|
Complete |
Report
|
| 67 |
2002-086 Jan 6, 2003 |
DE BEERS CANADA |
DE BEERS CANADA |
Attawapiskat |
New Supply Point & Transmission |
27 MW
|
Q4-2006
|
N/A |
Report Diagrams Addendum 1 Addendum 2 Addendum 3
|
| 66 |
2002-085 Dec 20, 2002 |
HYDRO ONE NETWORKS INC. |
Queenston Flow West (QFW) |
Niagara |
Transmission |
- |
Under Construction
|
Complete |
Report Addendum
|
| 65 |
2002-084 Dec 20, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Bruce Peninsula |
Bruce Peninsula |
New Generation |
100 MW 100 MW
|
N/A N/A
|
N/A |
Preliminary Assessment
|
| 64 |
2002-083 Dec 19, 2002 |
PLACER DOME (CLA) LIMITED |
PLACER DOME |
Pickle Lake |
Additional Load |
10 MW
|
In-Service
|
Complete |
Preliminary Assessment Addendum 1
|
| 63 |
2002-082 Dec 11, 2002 |
NORTHERN CROSS ENERGY |
NORTHERN CROSS |
Goderich |
New Generation |
50 MW
|
N/A
|
N/A |
Preliminary Assessment
|
| 62 |
2002-081 Dec 10, 2002 |
EPCOR POWER DEVELOPMENT CORPORATION |
Kingsbridge Wind Farm |
Goderich |
New Generation |
- |
In-Service
|
Complete |
Preliminary Assessment
|
| 61 |
2002-079 Dec 4, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Coldwell (Wolf/Marathon) |
Marathon |
New Generation |
100 MW
|
-
|
N/A |
|
| 55 |
2002-078 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Gosfield |
Leamington |
New Generation |
- |
In-Service
|
Complete |
Preliminary Assessment Final Report
|
| 54 |
2002-077 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Blue Highlands Wind Farm |
Collingwood |
New Generation |
49.5 MW 70.5 MW
|
N/A N/A
|
N/A |
Preliminary Assessment
|
| 60 |
2002-076 Dec 4, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Prince Park Wind Farm (CANCELLED) |
Sault St. Marie |
New Generation |
- |
Cancelled
|
N/A |
Preliminary Assessment
|
| 72 |
2002-075 Mar 21, 2003 |
ATLAS SPECIALTY STEELS, A DIV OF SLATER STAINLESS |
ATLAS SPECIALTY Steel |
Allanburg Area |
Transmission Upgrades |
- |
N/A
|
N/A |
Preliminary Assessment
|
| 53 |
2002-074 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Manitoulin Island |
Manitoulin Island |
New Generation |
100 MW
|
N/A
|
N/A |
Preliminary Assessment
|
| 68 |
2002-073 Jan 13, 2003 |
GRIMSBY POWER INCORPORATED |
GRIMSBY Power |
Niagara West |
New Supply Point |
117 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 52 |
2002-072 Nov 22, 2002 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Belle River East DS |
New Supply Point |
35 MVA
|
Cancelled
|
N/A |
Preliminary Assessment
|
| 51 |
2002-071 Nov 13, 2002 |
NORTHLAND POWER INC. |
McLEANS MOUNTAIN WINDFARM |
Macleans Mountain Manitoulin |
New Generation |
54 MW
|
-
|
N/A |
Preliminary Assessment
|
| 59 |
2002-070 Dec 4, 2002 |
GREAT LAKES POWER - TRANSMISSION |
Transmission Reinforcement |
GLP System Reinforcement |
Transmission |
- |
In-Service Q4-2005 Q4-2005 Q4-2005 Q4-2005
|
N/A |
Preliminary Assessment
|
| 58 |
2002-069 Dec 4, 2002 |
GREAT LAKES POWER - GENERATION |
High Falls GS |
High Falls GS |
New Generation |
50 MVA
|
In-Service
|
N/A |
Preliminary Assessment
|
| 57 |
2002-068 Dec 4, 2002 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Beck GS #2 |
New Generation |
- |
In-Service
|
N/A |
Preliminary Assessment
|
| 56 |
2002-067 Nov 29, 2002 |
NIAGARA-ON-THE-LAKE HYDRO INC. |
NIAGARA-ON-THE-LAKE HYDRO |
Niagara-on-the-Lake TS |
New Supply Point |
42 MVA
|
In-Service
|
N/A |
Preliminary Assessment
|
| 46 |
2002-066 Jul 26, 2002 |
HYDRO ONE NETWORKS INC. |
New autotransformer |
Kent TS |
New Supply Point |
125 MVA
|
Cancelled
|
N/A |
Preliminary Assessment
|
| 44 |
2002-065 Jul 26, 2002 |
TORONTO HYDRO-ELECTRIC SYSTEM LIMITED |
TORONTO HYDRO |
Portlands via John TS |
New Generation |
180 MW
|
-
|
N/A |
|
| 49 |
2002-064 Oct 3, 2002 |
NIAGARA FALLS HYDRO INC. |
NIAGARA FALLS HYDRO |
Kalar TS |
New Supply Point |
105 MVA
|
In-Service
|
N/A |
Preliminary Assessment
|
| 48 |
2002-062 Sep 11, 2002 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Hawthorne TS (Ottawa Area) |
Transmission |
250 MVA
|
In-Service
|
N/A |
Preliminary Assessment
|
| 50 |
2002-061 Dec 10, 2002 |
ONTARIO POWER GENERATION - HYDRO |
Lac Seul GS |
Lac Seul GS |
New Generation |
13.6 MW
|
In-Service
|
Complete |
Final Report
|
| 47 |
2002-060 Aug 13, 2002 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Birch TS |
Reactive Compensation |
80 MVAR
|
In-Service
|
N/A |
Preliminary Assessment
|
| 45 |
2002-058 Aug 7, 2002 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Wawa |
Reactive Compensation |
160 MVAR
|
In-Service
|
N/A |
Preliminary Assessment
|
| 42 |
2002-057 May 24, 2002 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Toronto |
New Supply Point |
500 MW
|
Q2-2010
|
Complete |
Report
|
| 41 |
2002-056 May 10, 2002 |
HYDRO ONE NETWORKS INC. |
Caledonia TS |
Caledonia |
New Supply Point |
200 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 43 |
2002-055 Jun 6, 2002 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Kipling GS |
New Generation |
20 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 38 |
2002-054 Apr 4, 2002 |
MARKHAM HYDRO DISTRIBUTION INC. |
MARKHAM HYDRO |
Markham |
New Supply Point |
116 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 40 |
2002-053 May 4, 2002 |
TORONTO HYDRO-ELECTRIC SYSTEM LIMITED |
TORONTO HYDRO |
Toronto Portlands |
New Generation |
180 MW
|
N/A
|
N/A |
Preliminary Assessment
|
| 37 |
2002-052 Mar 22, 2002 |
HYDRO ONE NETWORKS INC. |
Dundas TS |
Dundas TS |
New Supply Point |
95.4 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 39 |
2002-051 Apr 4, 2002 |
HYDRO ONE NETWORKS INC. |
Winona TS |
Winona TS |
New Supply Point |
117 MVA
|
In-Service
|
N/A |
Preliminary Assessment
|
| 32 |
2001-050 Dec 14, 2001 |
HYDRO ONE NETWORKS INC. |
Terauley TS Split |
Terauley TS |
Station Work |
- |
In-Service
|
N/A |
Preliminary Assessment Addendum
|
| 33 |
2001-049 Jan 25, 2002 |
HYDRO ONE NETWORKS INC. |
Manby TS |
Manby TS |
Retirement of Facilities |
- |
In-Service
|
N/A |
Preliminary Assessment
|
| 35 |
2001-047 Feb 12, 2002 |
BRUCE POWER INC. |
BRUCE POWER Inc. |
Kincardine |
New Generation |
1470 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 34 |
2001-046 Feb 4, 2002 |
ONTARIO POWER GENERATION - HYDRO |
OPG |
Nanticoke GS |
Additional Load |
43 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 30 |
2001-044 Oct 2, 2001 |
NORTH CARIBOU LAKE FIRST NATION |
NORTH CARIBOU LAKE FIRST NATION |
NW Ontarioario |
New Supply Point |
2 MW
|
N/A
|
Complete |
Preliminary Assessment
|
| 28 |
2001-043 Sep 4, 2001 |
NORTHLAND POWER INC. |
NORTHLAND Power |
Iroquois Falls |
Reactive Compensation |
32 MW
|
-
|
N/A |
Report
|
| 29 |
2001-042 Sep 19, 2001 |
THUNDER BAY HYDRO ELECTRICITY DISTRIBUTION INC. |
Bowater Sawmill project |
Thunder Bay (Fort William TS) |
Additional Load |
12 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 25 |
2001-040 Jul 19, 2001 |
ONTARIO POWER GENERATION - HYDRO |
Portlands Energy Centre |
Portlands Energy Centre |
New Generation |
300 MW
|
In-Service
|
N/A |
Preliminary Assessment Addendum Addendum 2
|
| 36 |
2001-039 Feb 28, 2002 |
DAIMLER CHRYSLER |
DAIMLER CHRYSLER |
Windsor |
New Supply Point |
32 MW
|
Cancelled
|
N/A |
Preliminary Assessment
|
| 26 |
2001-038 Jul 11, 2001 |
HYDRO ONE NETWORKS INC. |
HYDRO ONE |
Cecil |
Transmission |
45 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 24 |
2001-034 Jun 19, 2001 |
IMPERIAL OIL LIMITED |
IMPERIAL OIL |
Sarnia |
New Supply Point |
33 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 23 |
2001-033 Apr 11, 2001 |
KITCHENER-WILMOT HYDRO INC. |
KITCHENER WILMOT Hydro |
Kitchener |
New Supply Point |
45 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 22 |
2001-032 Mar 29, 2001 |
WATERLOO NORTH HYDRO INC. |
WATERLOO NORTH Hydro |
Waterloo |
New Supply Point |
90 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 20 |
2000-031 Mar 14, 2001 |
FORD MOTOR COMPANY OF CANADA, LIMITED |
FORD ANNEX |
Windsor |
New Supply Point |
15 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 18 |
2000-030 Jan 29, 2001 |
CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. |
CAMBRIDGE Hydro |
Cambridge |
New Supply Point |
100 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 17 |
2000-029 Nov 30, 2000 |
IMPERIAL OIL LIMITED |
IMPERIAL OIL |
Sarnia |
New Generation |
98 MW
|
In-Service
|
Complete |
Preliminary Assessment Report Diagram 1 Diagram 2
|
| 21 |
2000-028 Mar 19, 2001 |
HYDRO OTTAWA LIMITED |
HYDRO OTTAWA |
Ottawa |
New Supply Point |
28 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 15 |
2000-027 Nov 22, 2000 |
CALPINE CORUNNA PROJECT |
Corunna Project |
Sarnia |
New Generation |
870 MW
|
-
|
Withdrawn |
Preliminary Assessment Report Diagram 1 Diagram 2
|
| 31 |
2000-026 Nov 13, 2001 |
HYDRO ONE BRAMPTON NETWORKS INC. |
Jim Yarrow TS |
Brampton (Jim Yarrow TS) |
New Supply Point |
60 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 16 |
2000-025 Nov 29, 2000 |
HYDRO VAUGHAN DISTRIBUTION INC. |
VAUGHAN HYDRO |
Vaughan |
New Supply Point |
40 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 12 |
2000-023 Nov 3, 2000 |
AGSTAR POWER INC. |
Tilbury |
Tilbury |
New Generation |
88 MW
|
N/A
|
N/A |
Preliminary Assessment
|
| 19 |
2000-020 Feb 2, 2001 |
RICHMOND HILL HYDRO INC. |
RICHMOND HILL Hydro |
Richmond Hill |
New Supply Point |
90 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 27 |
2000-019 Jul 24, 2001 |
WEYERHAEUSER COMPANY LIMITED |
WEYERHAEUSER Project |
Kenora |
New Supply Point |
16.5 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 13 |
2000-017 Nov 3, 2000 |
TRANSENERGIE |
Lake Erie |
Nanticoke |
Interconnection |
990 MW
|
N/A
|
Complete |
Preliminary Assessment Report Attachments
|
| 14 |
2000-016 Nov 22, 2000 |
NORTH AMERICAN PALLADIUM |
NORTH AMERICAN PALLADIUM |
Thunder Bay |
New Supply Point |
35 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 11 |
2000-015 Oct 2, 2000 |
FIVE NATIONS ENERGY INC. |
FIVE NATIONS |
Moosonee |
Additional Load |
8 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 10 |
2000-012 Sep 21, 2000 |
KANATA HYDRO ELECTRIC COMMISSION |
KANATA Hydro Electric Commission |
Kanata |
New Supply Point |
60 MW
|
In-Service
|
N/A |
Preliminary Assessment
|
| 9 |
2000-011 Jun 1, 2000 |
ATCO POWER LIMITED |
ATCO Power Limited |
Windsor |
New Generation |
625 MW
|
In-Service
|
Complete |
Preliminary Assessment Report Addendum
|
| 8 |
2000-010 Jun 1, 2000 |
AES KINGSTON INC. |
AES Kingston Inc. |
Leamington |
New Generation |
530 MW
|
-
|
Withdrawn |
Preliminary Assessment
|
| 7 |
2000-009 Jan 13, 2000 |
NORTHLAND POWER INC. |
Kirkland Lake expansion |
Kirkland Lake |
New Generation |
48 MW
|
In-Service
|
Complete |
Report Addendum
|
| 6 |
2000-008 Nov 15, 1999 |
SITHE CANADIAN HOLDINGS INC. |
Brampton |
Goreway, Brampton |
New Generation |
- |
In-Service In-Service
|
Complete |
Report Addendum
|
| 5 |
2000-007 Nov 15, 1999 |
SITHE CANADIAN HOLDINGS INC. |
Mississauga |
Southdown, Mississauga |
New Generation |
913 MW
|
N/A
|
Complete |
Report Addendum
|
| 4 |
2000-006 Oct 29, 1999 |
ENRON CANADA CORP. |
ENRON Canada Corp. |
Sarnia |
New Generation |
505 MW
|
-
|
Withdrawn |
Preliminary Assessment
|
| 3 |
2000-004 Feb 18, 1999 |
TRANSALTA ENERGY CORPORATION |
Sarnia |
Sarnia |
New Generation |
510 MW
|
In-Service
|
Complete |
Preliminary Assessment Report
|
| 2 |
2000-003 Jan 16, 1999 |
NORTHLAND POWER INC. |
Thorold GS |
Thorold |
New Generation |
- |
In-Service
|
Complete |
Preliminary Assessment Draft Report Attachment 1 Addendum Addendum 2
|
| 1 |
2000-001 Dec 22, 1998 |
HYDRO ONE NETWORKS INC. |
Hydro Quebec Interconnection |
Hawthrone TS / Outaouais SS |
Interconnection |
1250 MW
|
In-Service
|
Complete |
Report Attachment Addendum 1
|
|