Status of System Impact Assessment Applications received before April 30, 2005
This list provides the status of all transmission, load, generation and ancillary services connection proposals that have submitted an SIA application before April 30, 2005 and subsequently executed an SIA agreement. Queuing principles are still applicable to these proposals. Links are provided for Preliminary Assessment reports (no longer applicable) and SIA reports.
The following are the possible states of the status column:
- "Complete" indicates that reports are available for viewing.
- "Active" indicates that work is in progress.
- "On Hold" indicates that the assessment was placed on hold because the projects has been delayed.
- "Not Required" indicates that a System Impact Assessment is not required.
- "By HONI" indicates that an assessment of the Project was conducted by Hydro One Networks Inc. (HONI) prior to the enactment of the applicable Market Rules, and has been accepted in lieu of Preliminary Assessment.
Last Updated:
December 1, 2008
| Queue Position |
CAA ID & Date used for Queue Position |
Proponent |
Location |
Project Type |
Proposed Size |
In-service Date |
Current Status of: |
Report |
| Preliminary Assessment |
System Impact Assessment |
| 1 |
2000-001 Dec 22, 1998 |
HYDRO ONE NETWORKS INC. |
Hawthrone TS / Outaouais SS |
Interconnection |
1250 MW
|
Q1-2009
|
N/A |
Complete |
Report Attachment Addendum 1
|
| 3 |
2000-004 Feb 18, 1999 |
TRANSALTA ENERGY CORPORATION |
Sarnia |
New Generation |
510 MW
|
In-Service
|
N/A |
Complete |
Preliminary Assessment Report
|
| 4 |
2000-006 Oct 29, 1999 |
ENRON CANADA CORP. |
Sarnia |
New Generation |
505 MW
|
-
|
Withdrawn |
Withdrawn |
Preliminary Assessment
|
| 5 |
2000-007 Nov 15, 1999 |
SITHE CANADIAN HOLDINGS INC. |
Southdown, Mississauga |
New Generation |
913 MW
|
N/A
|
N/A |
Complete |
Report Addendum
|
| 7 |
2000-009 Jan 13, 2000 |
NORTHLAND POWER INC. |
Kirkland Lake |
New Generation |
48 MW
|
In-Service
|
N/A |
Complete |
Report Addendum
|
| 8 |
2000-010 Jun 1, 2000 |
AES KINGSTON INC. |
Leamington |
New Generation |
530 MW
|
-
|
Withdrawn |
Withdrawn |
Preliminary Assessment
|
| 9 |
2000-011 Jun 1, 2000 |
ATCO POWER LIMITED |
Windsor |
New Generation |
625 MW
|
In-Service
|
N/A |
Complete |
Preliminary Assessment Report Addendum
|
| 10 |
2000-012 Sep 21, 2000 |
KANATA HYDRO ELECTRIC COMMISSION |
Kanata |
New Supply Point |
60 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 11 |
2000-015 Oct 2, 2000 |
FIVE NATIONS ENERGY INC |
Moosonee |
Additional Load |
8 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 12 |
2000-023 Nov 3, 2000 |
AGSTAR POWER INC. |
Tilbury |
New Generation |
88 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 13 |
2000-017 Nov 3, 2000 |
TRANSENERGIE |
Nanticoke |
Interconnection |
990 MW
|
N/A
|
Complete |
Complete |
Preliminary Assessment Report Attachments
|
| 14 |
2000-016 Nov 22, 2000 |
NORTH AMERICAN PALLADIUM |
Thunder Bay |
New Supply Point |
35 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 15 |
2000-027 Nov 22, 2000 |
CALPINE CORUNNA PROJECT |
Sarnia |
New Generation |
870 MW
|
-
|
Withdrawn |
Withdrawn |
Preliminary Assessment Report Diagram 1 Diagram 2
|
| 16 |
2000-025 Nov 29, 2000 |
HYDRO VAUGHAN DISTRIBUTION INC. |
Vaughan |
New Supply Point |
40 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 17 |
2000-029 Nov 30, 2000 |
IMPERIAL OIL LIMITED |
Sarnia |
New Generation |
98 MW
|
In-Service
|
Complete |
Complete |
Preliminary Assessment Report Diagram 1 Diagram 2
|
| 18 |
2000-030 Jan 29, 2001 |
CAMBRIDGE AND NORTH DUMFRIES HYDRO INC. |
Cambridge |
New Supply Point |
100 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 19 |
2000-020 Feb 2, 2001 |
RICHMOND HILL HYDRO INC. |
Richmond Hill |
New Supply Point |
90 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 20 |
2000-031 Mar 14, 2001 |
FORD MOTOR COMPANY OF CANADA, LIMITED |
Windsor |
New Supply Point |
15 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 21 |
2000-028 Mar 19, 2001 |
HYDRO OTTAWA LIMITED |
Ottawa |
New Supply Point |
28 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 22 |
2001-032 Mar 29, 2001 |
WATERLOO NORTH HYDRO INC. |
Waterloo |
New Supply Point |
90 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 23 |
2001-033 Apr 11, 2001 |
KITCHENER-WILMOT HYDRO INC. |
Kitchener |
New Supply Point |
45 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 24 |
2001-034 Jun 19, 2001 |
IMPERIAL OIL LIMITED |
Sarnia |
New Supply Point |
33 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 26 |
2001-038 Jul 11, 2001 |
HYDRO ONE NETWORKS INC. |
Cecil |
New Supply Point |
45 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 27 |
2000-019 Jul 24, 2001 |
WEYERHAEUSER COMPANY LIMITED |
Kenora |
New Supply Point |
16.5 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 28 |
2001-043 Sep 4, 2001 |
NORTHLAND POWER INC. |
Iroquois Falls |
Reactive Compensation |
32 MW
|
-
|
Withdrawn |
N/A |
Report
|
| 29 |
2001-042 Sep 19, 2001 |
THUNDER BAY HYDRO ELECTRICITY DISTRIBUTION INC. |
Thunder Bay (Fort William TS) |
Additional Load |
12 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 30 |
2001-044 Oct 2, 2001 |
NORTH CARIBOU LAKE FIRST NATION |
NW Ontario |
New Supply Point |
2 MW
|
N/A
|
N/A |
Complete |
Preliminary Assessment
|
| 31 |
2000-026 Nov 13, 2001 |
HYDRO ONE BRAMPTON NETWORKS INC. |
Brampton (Jim Yarrow TS) |
New Supply Point |
60 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 32 |
2001-050 Dec 14, 2001 |
HYDRO ONE NETWORKS INC. |
Terauley TS |
Station Work |
- |
In-Service
|
Complete |
N/A |
Preliminary Assessment Addendum
|
| 33 |
2001-049 Jan 25, 2002 |
HYDRO ONE NETWORKS INC. |
Manby TS |
Retirement of Facilities |
- |
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 34 |
2001-046 Feb 4, 2002 |
ONTARIO POWER GENERATION INC. |
Nanticoke GS |
Additional Load |
43 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 35 |
2001-047 Feb 12, 2002 |
BRUCE POWER INC. |
Kincardine |
New Generation |
1470 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 36 |
2001-039 Feb 28, 2002 |
DAIMLER CHRYSLER |
Windsor |
New Supply Point |
32 MW
|
Cancelled
|
Complete |
N/A |
Preliminary Assessment
|
| 37 |
2002-052 Mar 22, 2002 |
HYDRO ONE NETWORKS INC. |
Dundas TS |
New Supply Point |
95.4 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 38 |
2002-054 Apr 4, 2002 |
MARKHAM HYDRO DISTRIBUTION INC. |
Markham |
New Supply Point |
116 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 39 |
2002-051 Apr 4, 2002 |
HYDRO ONE NETWORKS INC. |
Winona TS |
New Supply Point |
117 MVA
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 40 |
2002-053 May 4, 2002 |
TORONTO HYDRO-ELECTRIC SYSTEM LIMITED |
Toronto Portlands |
New Generation |
180 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 41 |
2002-056 May 10, 2002 |
HYDRO ONE NETWORKS INC. |
Caledonia |
New Supply Point |
200 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 42 |
2002-057 May 24, 2002 |
HYDRO ONE NETWORKS INC. |
Toronto |
New Supply Point |
500 MW
|
Q2-2010
|
Complete |
Complete |
Report
|
| 43 |
2002-055 Jun 6, 2002 |
ONTARIO POWER GENERATION INC. |
Kipling GS |
New Generation |
20 MW
|
Q2-2004
|
Complete |
N/A |
Preliminary Assessment
|
| 44 |
2002-065 Jul 26, 2002 |
TORONTO HYDRO-ELECTRIC SYSTEM LIMITED |
Portlands via John TS |
New Generation |
180 MW
|
N/A
|
On-Hold |
N/A |
|
| 45 |
2002-058 Aug 7, 2002 |
HYDRO ONE NETWORKS INC. |
Wawa |
Reactive Compensation |
160 MVAR
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 46 |
2002-066 Jul 26, 2002 |
HYDRO ONE NETWORKS INC. |
Kent TS |
New Supply Point |
125 MVA
|
Q4-2011
|
Complete |
N/A |
Preliminary Assessment
|
| 47 |
2002-060 Aug 13, 2002 |
HYDRO ONE NETWORKS INC. |
Birch TS |
Reactive Compensation |
80 MVAR
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 48 |
2002-062 Sep 11, 2002 |
HYDRO ONE NETWORKS INC. |
Hawthorne TS (Ottawa Area) |
Transmission |
250 MVA
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 49 |
2002-064 Oct 3, 2002 |
NIAGARA FALLS HYDRO INC. |
Kalar TS |
New Supply Point |
105 MVA
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 50 |
2002-061 Dec 10, 2002 |
ONTARIO POWER GENERATION INC. |
Lac Seul GS |
New Generation |
13.6 MW
|
Under Construction
|
Complete |
Complete |
Final Report
|
| 51 |
2002-071 Nov 13, 2002 |
REPOWER WIND CORP. |
Macleans Mountain Manitoulin |
New Generation |
54 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 52 |
2002-072 Nov 22, 2002 |
HYDRO ONE NETWORKS INC. |
Belle River East DS |
New Supply Point |
35 MVA
|
Cancelled
|
Complete |
N/A |
Preliminary Assessment
|
| 53 |
2002-074 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Manitoulin Island |
New Generation |
100 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 54 |
2002-077 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Collingwood |
New Generation |
70.5 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 55 |
2002-078 Nov 29, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Leamington |
New Generation |
62 MW
|
N/A
|
Part 1 SIA Comp |
N/A |
Preliminary Assessment
|
| 56 |
2002-067 Nov 29, 2002 |
NIAGARA-ON-THE-LAKE HYDRO INC. |
Niagara-on-the-Lake TS |
New Supply Point |
42 MVA
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 58 |
2002-069 Dec 4, 2002 |
GREAT LAKES POWER - GENERATION |
High Falls GS |
New Generation |
50 MVA
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 59 |
2002-070 Dec 4, 2002 |
GREAT LAKES POWER - TRANSMISSION |
GLP System Reinforcement |
Transmission |
- |
Q1-2005 Q4-2005 Q4-2005 Q4-2005 Q4-200
|
Complete |
N/A |
Preliminary Assessment
|
| 60 |
2002-076 Dec 4, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Sault St. Marie |
New Generation |
- |
Cancelled
|
Complete |
N/A |
Preliminary Assessment
|
| 61 |
2002-079 Dec 4, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Marathon |
New Generation |
100 MW
|
Q4-2009
|
Part 1 SIA Comp |
N/A |
|
| 63 |
2002-082 Dec 11, 2002 |
NORTHERN CROSS ENERGY |
Goderich |
New Generation |
50 MW
|
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 64 |
2002-083 Dec 19, 2002 |
PLACER DOME (CLA) LIMITED |
Pickle Lake |
Additional Load |
10 MW
|
In-Service
|
Complete |
Complete |
Preliminary Assessment Addendum 1
|
| 65 |
2002-084 Dec 20, 2002 |
BROOKFIELD WIND POWER CORPORATION |
Bruce Peninsula |
New Generation |
100 MW 100 MW
|
N/A N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 66 |
2002-085 Dec 20, 2002 |
HYDRO ONE NETWORKS INC. |
Niagara |
Transmission |
- |
Under Construction
|
Complete |
Complete |
Report Addendum
|
| 67 |
2002-086 Jan 6, 2003 |
DE BEERS CANADA |
Attawapiskat |
New Supply Point & Transmission |
27 MW
|
Q4-2006
|
Complete |
N/A |
Report Diagrams Addendum 1 Addendum 2 Addendum 3
|
| 68 |
2002-073 Jan 13, 2003 |
GRIMSBY POWER INCORPORATED |
Niagara West |
New Supply Point |
117 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 69 |
2003-091 Mar 6, 2003 |
HYDRO ONE NETWORKS INC. |
Richview TS, Burlington TS & John TS |
Reactive Compensation |
412 MVAR 300 MVAR 99.5 MVAR
|
In-Service In-Service In-Service
|
Complete |
Complete |
Report
|
| 70 |
2003-092 Mar 7, 2003 |
HYDRO ONE NETWORKS INC. |
Cherrywood |
Modified Connection |
- |
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 71 |
2003-093 Jun 12, 2003 |
NORFOLK POWER DISTRIBUTION INC. |
Simcoe |
New Supply Point |
41.7 MW
|
In-Service
|
Complete |
N/A |
Preliminary Assessment
|
| 72 |
2002-075 Mar 21, 2003 |
ATLAS SPECIALTY STEELS, A DIV OF SLATER STAINLESS |
Allanburg Area |
Transmission Upgrades |
- |
N/A
|
Complete |
N/A |
Preliminary Assessment
|
| 73 |
2003-089 Mar 25, 2003 |
HYDRO VAUGHAN DISTRIBUTION INC. |
Vaughan |
Additional Load |
80 MW
|
Cancelled
|
Complete |
N/A |
Preliminary Assessment
|
| 74 |
2003-095 May 15, 2003 |
ONTARIO ELECTRICITY FINANCIAL CORPORATION |
Various Locations |
New Generation |
440 MW
|
Cancelled
|
Complete |
N/A |
Report
|
| Queue Position |
CAA ID & Date used for Queue Position |
Proponent |
Location |
Project Type |
Proposed Size |
In-service Date |
Current Status of System Impact Assessment |
Report |
| 75 |
2003-087 Jul 4, 2003 |
HYDRO ONE NETWORKS INC. |
Kincardine |
New Generation |
15 MW
|
N/A
|
Complete |
Report
|
| 76 |
2003-101 Jul 4, 2003 |
HYDRO ONE NETWORKS INC. |
Picton |
New Generation |
22 MW
|
N/A
|
Complete |
Report
|
| 77 |
2003-099 Aug 1, 2003 |
HYDRO ONE NETWORKS INC. |
Parkway TS |
New Supply Point |
- |
In-Service In-Service
|
Complete |
Report Addendum
|
| 78 |
2003-100 Aug 1, 2003 |
HYDRO ONE NETWORKS INC. |
York Region (Armitage TS) |
Transmission |
- |
N/A
|
On-Hold |
|
| 79 |
2003-102 Aug 21, 2003 |
BORALEX INC. |
Mississauga |
New Generation |
180 MW
|
N/A
|
On-Hold |
|
| 80 |
2003-104 Sep 11, 2003 |
HYDRO ONE NETWORKS INC. |
Mississauga (Cardiff TS) |
New Supply Point |
- |
In-Service
|
Complete |
Report
|
| 81 |
2003-106 Sep 22, 2003 |
AIM POWERGEN CORPORATION |
Port Burwell (Lake Erie Northshore) |
New Generation |
51 MW
|
N/A
|
Complete |
Report Appendix
|
| 82 |
2003-096 Oct 15, 2003 |
HYDRO VAUGHAN DISTRIBUTION INC. |
Vaughan MTS No. 4 |
New Supply Point |
- |
-
|
Withdrawn |
|
| 84 |
2003-094 Jan 21, 2004 |
CANADIAN HYDRO DEVELOPERS INC |
Wolfe Island |
New Generation |
35 MW
|
-
|
Withdrawn |
|
| 85 |
2004-113 Jan 29, 2004 |
HYDRO ONE NETWORKS INC. |
Cooksville TS |
Modified Connection |
- |
Q3-2006
|
Complete |
Report Addendum
|
| 86 |
2004-112 Jan 29, 2004 |
HYDRO ONE NETWORKS INC. |
Newmarket (Armitage 3 TS) |
New Supply Point |
- |
-
|
Withdrawn |
|
| 88 |
2004-115 Mar 2, 2004 |
HYDRO ONE NETWORKS INC. |
Trafalgar TS |
Reactive Compensation |
300 MVAR
|
In-Service
|
Complete |
Report
|
| 89 |
2004-114 Mar 17, 2004 |
EPCOR POWER DEVELOPMENT CORPORATION |
Ashfield-Colborne |
New Generation |
140 MW
|
N/A
|
Complete |
Report
|
| 90 |
2004-111 Mar 22, 2004 |
CANADIAN HYDRO DEVELOPERS INC |
Wolfe Island |
New Generation |
62.6 MW
|
N/A
|
Complete |
Report
|
| 91 |
2004-116 Mar 29, 2004 |
NORTHLAND POWER INC. |
South Huron (Grand Bend) |
New Generation |
86.4 MW
|
N/A
|
On-Hold |
|
| 93 |
2004-119 Apr 26, 2004 |
NORTHLAND POWER INC. |
Kitchener |
New Generation |
192 MW
|
N/A
|
On-Hold |
|
| 94 |
2004-123 May 5, 2004 |
EPCOR POWER DEVELOPMENT CORPORATION |
Etobicoke/Mississauga |
New Generation |
310 MW
|
N/A
|
On-Hold |
|
| 95 |
2003-109 May 20, 2004 |
BAY AREA HEALTH TRUST |
Hamilton (McMaster) |
New Generation |
12 MW
|
In-Service
|
Complete |
Report
|
| 97 |
2004-122 May 20, 2004 |
ECHO POWER GENERATION INC. |
Port Burwell |
New Generation |
100 MW
|
N/A
|
Complete |
Report
|
| 98 |
2004-136 May 21, 2004 |
GREAT LAKES POWER - GENERATION |
Andrews GS |
Generator Upgrades |
- |
In-Service
|
Complete |
Report
|
| 101 |
2004-129 May 25, 2004 |
SUNCOR ENERGY INC. |
Malahide (Burwell) area |
New Generation |
25.5 MW
|
-
|
Withdrawn |
|
| 102 |
2004-120 May 26, 2004 |
ONTARIO POWER GENERATION INC. |
Kincardine (Tiverton) |
New Generation |
24 MW
|
N/A
|
On-Hold |
|
| 103 |
2004-124 May 27, 2004 |
TRANSCANADA ENERGY LTD. |
Mississauga |
New Generation |
1200 MW
|
N/A
|
On-Hold |
|
| 104 |
2004-132 May 27, 2004 |
SCHNEIDER POWER INC. |
Manitoulin Island (Providence Bay) |
New Generation |
21 MW
|
N/A
|
On-Hold |
|
| 105 |
2004-134 May 27, 2004 |
VISION QUEST WINDELECTRIC |
Ripley, Ontario (Reid's Corner) |
New Generation |
75 MW
|
N/A
|
On-Hold |
|
| 106 |
2004-130 Jun 2, 2004 |
REGIONAL POWER INC. |
NW -Marathon Area (Wawatay GS) |
New Generation |
7 MW
|
Q1-2007
|
Complete |
Report
|
| 107 |
2004-131 Jun 8, 2004 |
INVENERGY WIND CANADA ULC |
Cedarville - Southgate Wind Farm |
New Generation |
200 MW
|
N/A
|
On-Hold |
|
| 108 |
2004-153 Aug 6, 2004 |
CANADIAN HYDRO DEVELOPERS INC |
Wolfe Island |
New Generation |
300 MW
|
-
|
Withdrawn |
|
| 109 |
2004-133 Jun 16, 2004 |
ARBOUR POWER LP. |
Ajax Ontario |
New Generation |
53 MW
|
N/A
|
On-Hold |
|
| 110 |
2004-126 Jun 18, 2004 |
NORTHLAND POWER INC. |
Conestoga Boulevard, Cambridge |
New Generation |
96 MW
|
N/A
|
On-Hold |
|
| 111 |
2004-138 Jun 28, 2004 |
VENTUS ENERGY INC. |
Georgian Bay |
New Generation |
51 MW
|
N/A
|
On-Hold |
Draft Report
|
| 112 |
2004-137 Jun 29, 2004 |
WEYERHAEUSER |
Weyerhaeuser Mill in Dryden |
New Generation |
85 MW
|
-
|
Withdrawn |
Draft Report
|
| 113 |
2004-135 Jul 14, 2004 |
HYDRO ONE NETWORKS INC. |
Essa TS |
Reactive Compensation |
245 MVAR
|
In-Service
|
Complete |
Report
|
| 114 |
2004-140 Jul 19, 2004 |
ENERGY OTTAWA |
Chaudierre Falls |
New Generation |
20 MW
|
N/A
|
On-Hold |
|
| 115 |
2004-139 Aug 6, 2004 |
INVENERGY WIND CANADA ULC |
Woodville, between Beaverton and Lindsay |
New Generation |
200 MW
|
N/A
|
On-Hold |
|
| 117 |
2004-152 Aug 12, 2004 |
AES KINGSTON INC. |
Bath, Ontario (Kingston) |
New Generation |
50 MW
|
N/A
|
On-Hold |
|
| 118 |
2004-158 Sep 14, 2004 |
TRANSCANADA ENERGY LTD. |
Mississauga |
New Generation |
600 MW
|
N/A
|
On-Hold |
|
| 119 |
2004-162 Sep 14, 2004 |
AES KINGSTON INC. |
Bath, Ontario |
New Generation |
550 MW
|
N/A
|
On-Hold |
|
| 120 |
2004-161 Sep 30, 2004 |
CANADIAN NIAGARA POWER |
Cornwall |
Transmission |
- |
|
Complete |
Report
|
| 121 |
2004-168 Oct 22, 2004 |
CALPINE CANADA POWER LTD |
Vaughan |
New Generation |
960 MW
|
-
|
Withdrawn |
|
| 122 |
2004-169 Oct 22, 2004 |
CALPINE CANADA POWER LTD |
Nanticoke/Haldimand Co. Conc. #2 |
New Generation |
1195 MW
|
-
|
Withdrawn |
|
| 124 |
2004-172 Nov 4, 2004 |
EASTERN POWER LIMITED |
Oakville, ON |
New Generation |
330 MW
|
-
|
Withdrawn |
|
| 125 |
2004-173 Nov 5, 2004 |
GREENFIELD NORTH POWER |
Mississauga, ON |
New Generation |
330 MW
|
-
|
Withdrawn |
|
| 126 |
2004-159 Nov 11, 2004 |
DOFASCO INC. |
Hamilton |
New Generation |
100 MW
|
N/A
|
On-Hold |
|
| 127 |
2004-166 Nov 11, 2004 |
NORTHLAND POWER INC. |
590 Steven Court, Newmarket, ON |
New Generation |
300 MW
|
N/A
|
On-Hold |
|
| 128 |
2004-171 Nov 17, 2004 |
PRISTINE POWER INC. |
Lambton County, St. Clair Township |
New Generation |
670 MW
|
-
|
Withdrawn |
|
| 129 |
2004-151 Nov 24, 2004 |
AIM POWERGEN CORPORATION |
Dunnville |
New Generation |
90 MW
|
N/A
|
On-Hold |
|
| 131 |
2004-146 Nov 30, 2004 |
Ventus Energy Lakehead Windpower LP |
Thunder Bay/Shuniah Township |
New Generation |
100 MW
|
N/A
|
Part 1 SIA Comp |
|
| 132 |
2004-148 Nov 30, 2004 |
VENTUS ENERGY INC. |
Paisley |
New Generation |
51 MW
|
-
|
Withdrawn |
|
| 133 |
2004-149 Nov 30, 2004 |
VENTUS ENERGY INC. |
Wawa |
New Generation |
100 MW
|
-
|
Withdrawn |
|
| 135 |
2004-147 Dec 1, 2004 |
VENTUS ENERGY INC. |
Pays Plat |
New Generation |
100 MW
|
N/A
|
On-Hold |
|
| 136 |
2004-150 Dec 1, 2004 |
VENTUS ENERGY INC. |
Thunderbay |
New Generation |
253 MW
|
-
|
Withdrawn |
|
| 137 |
2004-179 Dec 6, 2004 |
QUEENS UNIVERSITY |
Kingston, ON |
New Generation |
15 MW
|
Q2-2006
|
Complete |
Report
|
| 138 |
2004-183 Dec 7, 2004 |
BAY SHORE ENERGY LP |
Hamilton, Ontario |
New Generation |
37.5 MW 90 MW
|
N/A N/A
|
On-Hold |
|
| 139 |
2004-144 Dec 9, 2004 |
BROOKFIELD WIND POWER CORPORATION |
Dunnville Area near Grant Point & Rock Point |
New Generation |
100 MW
|
N/A
|
On-Hold |
|
| 140 |
2004-182 Dec 9, 2004 |
LAKE SHORE ENERGY LP |
Haldimand County, Ontario |
New Generation |
23 MW 90 MW
|
N/A N/A
|
On-Hold |
|
| 141 |
2004-184 Dec 9, 2004 |
HYDRO ONE BRAMPTON NETWORKS INC. |
Brampton, Ontario |
New Generation |
12.5 MW
|
N/A
|
On-Hold |
|
| 143 |
2004-188 Dec 9, 2004 |
BROOKFIELD WIND POWER CORPORATION |
102 West Street, Sault Ste. Marie, ON P6A 6W6 |
New Generation |
122 MW
|
N/A
|
On-Hold |
|
| 144 |
2004-186 Dec 10, 2004 |
PENINSULA ENGINEERING 2004 INC. |
Hamilton, Ontario |
New Generation |
130 MW
|
N/A
|
On-Hold |
|
| 145 |
2004-185 Dec 13, 2004 |
FALLSVIEW ENTERTAINMENT CENTRE INC. |
Niagara Falls, Ontario |
New Generation |
66 MW
|
N/A
|
On-Hold |
|
| 147 |
2004-145 Feb 3, 2005 |
BROOKFIELD WIND POWER CORPORATION |
Town of Shelburne & Melancthon Twp. |
New Generation |
100 MW
|
N/A
|
On-Hold |
|
| 149 |
2004-181 Mar 2, 2005 |
Conestogo Wind Power Partnership |
Drayton near Moorefield, N of Kitchener |
New Generation |
200 MW
|
N/A
|
Part 1 SIA Comp |
|
| 150 |
2004-154 Mar 24, 2005 |
TWENTY TWO DEGREE ENERGY CORPORATION |
Goderich, ON |
New Generation |
200 MW
|
N/A
|
On-Hold |
|
| 151 |
2005-190 Apr 7, 2005 |
HYDRO ONE NETWORKS INC. |
Stayner TS, Essa TS, Stayner TS by Essa TS R of Wa |
Transmission |
- |
Q3-2009
|
Complete |
Report Addendum 1
|
| 152 |
2005-195 May 4, 2005 |
HYDRO ONE NETWORKS INC. |
Fort Frances, ON |
Reactive Compensation |
- |
Q2-2007
|
Active |
Final Draft Report
|
| 153 |
2005-200 May 17, 2005 |
HYDRO ONE NETWORKS INC. |
Grand Bend, Tillsonburg & Lake Bellwood |
Reactive Compensation |
- |
Q4-2007
|
Active |
Draft Report Appendix 1 Addendum Appendix 2
|
| 154 |
2005-192 May 18, 2005 |
CANADIAN NIAGARA POWER |
Fort Erie, ON |
Interconnection |
150 MVA
|
Under Construction
|
Complete |
Report
|
| 155 |
2005-198 May 18, 2005 |
HYDRO ONE NETWORKS INC. |
4590 Halls Road, Whitby, ON |
New Supply Point |
- |
Under Construction
|
Complete |
Report
|
| 156 |
2005-193 Jul 12, 2005 |
WEST WIND DEVELOPMENT INC. |
Nr. Town of Cedavale |
New Generation |
172.5 MW
|
N/A
|
On-Hold |
|
| 157 |
2005-196 Jul 15, 2005 |
BRANTFORD POWER INC. & BRANT COUNTY POWER INC. |
707 Powerline Rd, Paris, ON |
New Supply Point |
- |
In-Service
|
Complete |
Report
|
| 158 |
2004-160 Feb 28, 2006 |
HYDRO ONE NETWORKS INC. |
Parry Sound |
Transmission |
1500 MW
|
Q4-2010
|
Active |
Final Draft Report Addendum 1 Diagrams
|
| 160 |
2005-194 Dec 14, 2005 |
HYDRO ONE NETWORKS INC. |
Belle River Junction |
New Supply Point |
57.4 MW
|
In-Service
|
Complete |
Report
|
| 168 |
2006-249 Dec 8, 2006 |
HYDRO ONE NETWORKS INC. |
Line Section Between Hanover TS and Orangeville TS |
Transmission |
- |
Q2-2009
|
Active |
Final Draft Report
|
|