Interim Market Document Change - Spare Generation On-Line (SE-39)

An Interim Market Document Change (IMDC) has being created to reflect current Spare Generation On-Line (SGOL) practices that are not documented in the market manual. This document states that market participants will be required, at the time of notification of their intent to participate in SGOL, to also notify the IESO of the time at which they expect to reach their minimum loading point.

This change will be of interest to those participants currently registered in the Spare Generation On-Line program.

The Interim Market Document Change will be incorporated in the Market Manual 4.3 Real-time Scheduling of the Physical Markets, as part of Baseline 17.1.

IMDC - Spare Generation On-Line (March 26, 2007)
IMDC - Spare Generation On-Line (revision 1 – March 30, 2006)
IMDC - Spare Generation On-Line (revision 2 – April 17, 2006)

Working Sessions and Proposed Activities
Date
Agenda/Minutes
Supporting Material
June 6, 2007 Changes to market manual 4.3 are posted as final as part of Baseline 17.1.
April 17, 2007 Revised version of IMDC posted based on stakeholder feedback. The IMDC is now in effect.
March 30, 2007 Revised version of IMDC posted based on stakeholder feedback.
March 26, 2007 Posting and communication of Interim Market Document Change - Spare Generation On-Line.
 